Biokenaf QLK5 CT2002 1729 Final meeting Athens Hotel Acropol 26 & 27 February 2007 Efi Alexopoulou CRES.

Slides:



Advertisements
Similar presentations
Session 1. Gather practical experience gained with the cultivation of traditional bioenergy crops in the Mediterranean with respect to their environmental.
Advertisements

WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
RiceClima project review Climate Change Impacts, Vulnerability and Adaptation: Sustaining Rice Production in Bangladesh Dhaka, Royal Norwegian Embassy,
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
LIFE+ Environment project: LIFE 09 ENV/GR/ Presentation of the LIFE+ project: Strategic Planning Towards Carbon Neutrality in Tourism Accommodation.
Session 1. Gather practical experience gained with the cultivation of traditional bioenergy crops in the Mediterranean with respect to their environmental.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
06/12/ CYPADAPT “Development of a national strategy for adaptation to climate change adverse impacts in Cyprus “ Professor Maria Loizidou National.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
6-7 / 3 /2006 INSEAD Campus - Fontainebleau LC Learning to Collaborate L 2 C Learning to Collaborate Project Timeplan up to the 1 st review.
COGAIN Kick-Off Tampere, Finland WP 7: Community Outreach Inger Kirk Jordansen
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
ENV-NCP-TOG WP Leader Meeting, March 2010 WP 6: Dissemination and communication WP Leader: ISERD Israel – Europe R&D Directorate for FP.
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework programme RENAISSANCE - LYON - FRANCE 1 Technical seminar (WP0.
WP 6 Dorota Pawlucka Progress Meeting Amersfoort,
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
Presentation of Project’s Timetable and Partners’ Responsibilities National Technical University of Athens Unit of Environmental Science and Technology.
FOOD A G R I C U L T U R E E N V I R O N N M E N T BIOKENAF – QLK5-CT final meeting ATHENS, February 2007.
Key CLIM-RUN stages Stage setting (complete) – first stakeholder workshops (May-Nov 2011) Mapping the issues (complete) – perception and data needs questionnaires.
MISSION Sixth Framework Programme Specific Support Action EC-INCO-CT WP05 CHEMICAL AND PHYSICAL CHARACTERISATION OF MULTIFUNCTIONAL MATERIALS.
1 National Research Council - Pisa - Italy Marco Conti Italian National Research Council (CNR) IIT Institute Executive board meeting 2nd MobileMAN Workshop.
Biokenaf QLK5 CT th technical meeting Madrid, 27 and 27 th of September 2006 E. Alexopoulou/CRES.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
OPERATIONAL GUIDELINES Ensuring Ownership of PARSEL by Partners.
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
Centre for Genetic Resources, the Netherlands Chris Kik, CGN, Wageningen, the Netherlands LEAFY VEGETABLES WP5 Coordination.
1/15 ea technology Delivering your energy solutions MicroCHeaP: Month 6 meeting, Potsdam Work Package 2 - Progress Update 4 th April 2005 Presented by.
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based.
Welcome to Cologne 3 rd WP 5 Meeting May 26 th 2015.
Lukas Zagata & Michal Lostak Czech University of Life Sciences Prague YOUNG FARMERS AND NEW ENTRANTS IN THE INITIATIVES – REVIEW OF PROGRESS AND FINDINGS.
Work package title: WP 5 Farm trials to develop and promote effective use of botanical pesticides Lead partner: SAFIRE Involved partners: UZ, DARS, ICRAF,
Month 6 Meeting Dedeman Hotel, Ankara, Turkey Thursday July 7 th 2005 R ESIST V IR Co-ordination of Research on Genetic Resistance to Plant Pathogenic.
WP2. Adaptability and Productivity Field Trials Results from the fourth growing period and comparison of the results recorded from the years 2003, 2004.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Co-ordination meeting Anna Soci An agenda for the future Crete, October 13/14, 2006.
MSc conference briefing Mike Spann Project coordinator
ERASMUS FOR ALL EUROPEAN FUNDED PILOT PROJECT WORK PACKAGES / DELIVERABLES PRESENTED BY DR SHYAM PATIAR.
Fourth Overall Performance Study (OPS4) Consultation with GEF Focal Points Accra, Ghana 9-11 July 2009.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator GRNET NA1: Project Administrative and Technical Management PSC07 Meeting, Zabljak,
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Some Aspects of the. Environmental Impact Assessment and
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
Work Package 6 L2C Kick-off meeting Fontainebleau, March 7th 2006.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
Title of Article : The influence of formal controls on customer interactivity in new product development Author :Joseph M. Bonner Journal :Industrial Marketing.
> 1 ACP S&T Grant Contract N° FED/2009/ Introducing WP6 Monitoring & Quality control Objectives, actions, procedures Dr Sarah Bracking.
1 PRODUCTION OF A MANUAL FOR STATISTICS ON ENERGY CONSUMPTION IN HOUSEHOLDS MESH PROJECT 2 nd Working Meeting Madrid, 4 th May 2012 WP1: Administrative.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Demonstration of On-Farm Production of a Dedicated Energy Crop incorporating Multiple Varieties of Switchgrass Seed Sam Jackson and Nicole Labbé University.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
WP 6: Analysis and evaluation Hans H. K. Andersen Cogain Kick-Off Tampere, Finland.
Brussels, January 16th, Overview and status of the project.
AMICI WP1 – Management, coordination and dissemination
Third PMC meeting University of Priština, Kosovska Mitrovica
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Technical meeting Dury, France 13-Sep-2017 Robert Reinhardt
Reports Activities since last meeting in Lund #1
Annual Report Instructions
EU INCO-DEV STRAPEAT PROJECT
EuCARD2 WP11 Topical Meeting
AMICI WP1 – Management, coordination and dissemination
A High Intensity Neutrino Oscillation Facility in Europe
CHEMICAL AND PHYSICAL CHARACTERISATION OF MULTIFUNCTIONAL MATERIALS
Workplan and Administrative Management
Presentation transcript:

Biokenaf QLK5 CT Final meeting Athens Hotel Acropol 26 & 27 February 2007 Efi Alexopoulou CRES

The objectives of this meeting are to:  Review the work done from the beginning of the BIOKENAF project  Report on the achievements, milestones and deliverables from the beginning of the project  Discuss about the last deadlines of the BIOKENAF project Objectives of this meeting

Work that was done after the last technical meeting in Madrid  All the partners working on WP2 tried to finish the field trials and to collect and evaluate all the data  Preparation of several articles that will presented in the next Biomass Conference in Berlin (May 2007)  A lot of work had been done after the meeting in Bologna on the growth model and this meeting is going to focus on presentation of the model.  All the WP leaders tried to fulfill that were responsible for and all this work will be presented today

Deliverables Deliverable time D1Updated timetable2 D2Link establishment with AKS3 D3Detailed literature review for kenaf 3 D4Protocols for all field trials3 D5First final report and minutes for the project meetings 13 D6Second final report and minutes for the project meetings 25 D7Data collection for the growth model 6-36

Deliverables Deliverable time D8List with the appropriate cultivation techniques 36 D9Third year report and minutes for the project meetings 37 D10List of appropriate harvesting dates and methods D11A dynamic growth model and biomass production simulation model 42 D12Technical specifications of kenaf based products for selected industrial uses 12-40

Deliverables Deliverable time D13Economic characteristics and market perspectives for the industrial products D14Quality characteristics and energy potential of kenaf as a biofuels for thermo chemical processes D15Environmental impact assessment and LCA 39 D16Cost analysis40 D17Economic comparison of kenaf with other annual crops 40

Deliverables Deliverable time D18Seminars for the dissemination of the demo fields D19Technical visits for farmers in the 2 ha fields D20Handbook42 D21Booklet40 D22Papers in European and International conferences and journals 42 D23Final report42

Actions to be done in the next two monthsDelivery date Collect all the necessary data from the fields of the fourth year as soon as the final harvest of the fields will be done in order to give them to University of Thessaly for the model validation 15/3/07 The final report has to be sent to CRES as soon as possible 31/3/07 In order CRES to prepare the chapter for adaptability and productivity for the Handbook I need the data from the last year as soon as possible 15/3/07 Final report and cost statement until end of February /1/07 Everything has to be ready (final report and cost statement) two months after the finish of the project 30/4/07