S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, 06.10.09 1 CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,

Slides:



Advertisements
Similar presentations
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Advertisements

Elena.Litvinenko CBM Collaboration Meeting Dubna 17 Oct Dipole magnet for CBM: current status P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Borisov,
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Sergey Belogurov, ITEP, Moscow STS CAD model. GSI, STS mechanics: Conceptual CAD model development Sergey Belogurov ITEP, Moscow Engineer: Sergey.
STS Simulations Anna Kotynia 15 th CBM Collaboration Meeting April , 2010, GSI 1.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
CBM Superconducting Dipole Magnet
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Mechanics and Cooling Systems for the CBM STS SAINT-PETERSBURG STATE UNIVERSITY S.Igolkin, CONTENT.
CBM Collaboration Meeting 1 Simulation Status V. Friese.
Radiation levels in CBM Radiation effects iFluka (Fluka C++ interface to CbmRoot) Fluka Geometry Models Results Conclusion.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
SC dipole magnet for CBM E.A.Matyushevskiy, P.G. Akishin, A.V. Alfeev, V.S. Alfeev, V.V. Ivanov, E.I. Litvinenko, A.I. Malakhov JINR, Dubna CBM Collaboration.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
Ooo Performance simulation studies of a realistic model of the CBM Silicon Tracking System Silicon Tracking for CBM Reconstructed URQMD event: central.
Charmonium feasibility study F. Guber, E. Karpechev, A.Kurepin, A. Maevskaia Institute for Nuclear Research RAS, Moscow CBM collaboration meeting 11 February.
M. Deveaux, CBM collaboration meeting, Oct. 2008, Dubna, Russia A revision of the concept of the CBM – MVD Or: Do we need an intermediate pixel.
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Optimization of the Silicon Tracking System (STS) layout and beam pipe configuration for the CBM experiment. Andrey Chernogorov, Sergey Belogurov, ITEP,
Update on the Hall C Monte Carlo simulation for 12 GeV Mark Jones.
Dmitri Ossetski Obninsk State University Department of Applied Mathematics
D. Dutta 13th CBM Collaboration Meeting 1 Dipanwita Dutta Much Segmentation Study: A Flexible Scheme.
October 2005 Qweak Collaboration Meeting Detailed Design of Shield House and Collimators wrt Backgrounds Yongguang Liang Just getting started – will probably.
Performance simulations with a realistic model of the CBM Silicon Tracking System Silicon tracking for CBM Number of integration components Ladders106.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Evgeny Kryshen (PNPI) Mikhail Ryzhinskiy (SPbSPU) Vladimir Nikulin (PNPI) Detailed geometry of MUCH detector in cbmroot Outline Motivation Realistic module.
STS simulations: Layout, digitizers, performance Radoslaw Karabowicz GSI.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
HERMES dipole magnet model for CBM CBM Collaboration Meeting September 25-28,2006 Pavel Akishin Elena Litvinenko Victor Ivanov LIT JINR, Dubna
Realistic detector layout for MUCH system M.Ryzhinskiy, SPbSPU CBM Collaboration Meeting September 25-28, 2007, Dresden, Germany.
The 3rd Work Meeting of the CBM-MPD STS Consortium, 1–4 June 2009, Sortavala, Karelia, Russia Results from simulations of the production of secondary particles.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Ring finding efficiencies and RICH event display Semeon Lebedev GSI, Darmstadt and LIT JINR, Dubna Gennady Ososkov LIT JINR, Dubna X CBM collaboration.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
December 3, 20031Muon Integration Meeting Outline: Status of Calorimeter and Muon system Plug simulations Status of plug dimensions Conclusions Reminder:
Neutron Identification with ECAL  Sergey Kiselev, ITEP Moscow, for the ECAL group  Motivation  Input info  Signal parameters  Preshower – 1 GeV/c.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
 1) Introduction  2) GEANT simulations  3) NEW DESIGN : Technology and Assembly  4) Conclusions Reported by G.Feofilov, CBM meetings, Dubna.
Status of PSD simulation in Shine Oleg Petukhov Institute for Nuclear Research, Moscow NA61 Analysis/Software/Calibration meeting , Warsaw.
J.Pietraszko, HADES Coll. Meeting, GSI Nov ,  – electron multiplicity measured in HADES W. Koenig, Jerzy Pietraszko, T. Galatyuk, V. Pechenov,
FP-CCD GLD VERTEX GROUP Presenting by Tadashi Nagamine Tohoku University ILC VTX Ringberg Castle, May 2006.
Mitglied der Helmholtz-Gemeinschaft Hit Reconstruction for the Luminosity Monitor March 3 rd 2009 | T. Randriamalala, J. Ritman and T. Stockmanns.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
Simulation / reconstruction with GEMs at DAC A.Zinchenko, A.Kapishin, V.Vasendina for the collaboration VBLHEP, JINR, Dubna,
The Status of the CBM Experiment
Status of the forward tracker design
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
CBM beam pipe current status
Tracking System at CERN 06 and 07 test beams
Final Focus Synchrotron Radiation
of secondary light ion beams
Update on GEp GEM Background Rates
Effective luminosity simulation for PANDA experiment
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Physics 122B Electricity and Magnetism
Presentation transcript:

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov, ITEP, Moscow Outline - Properties of the beam at SIS 100. Data from the FAIR team - Conceptual design of the vacuum chamber and the 1-st section of the beampipe - Beryllium beampipe features - New Info for filling the magnet with the STS service equipment - Remarks about composition of the STS modules

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Properties of the beam at SIS 100. Data from the FAIR team S. Ratschow The beam half diameter at the CBM Target is 2.44mm (horizontal) 1.5mm (vertical). 2*beam width ~90-95% of particles Effects of the last q diameter - filling up the phase space (intensity) - size of the spot at the target (1/d) Tail treatment – collimators (M. Kats, ITEP) Last q-lens to HADES – 3m to CBM - 15 m

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Properties of the beam at SIS 100. Data from the FAIR team Taken from analysis of collimator system for SIS300 by Dr. M. Kats, ITEP

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Properties of the beam at SIS 100. Data from the FAIR team Issues for CBM: Radiation environment when the beam is focused at HADES (Beam size at the CBM magnet is ~ 1 m). Beam dump between the experiments? Size of the beam at PSD position during normal operation (~12 cm at 10 m, 17 cm at 15 m) We need to know the minimum energy we may use with the max. field of CBM magnet, both for SIS 100 and SIS300 (deflection of the beam in the field of our magnet.)

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Conceptual design of the vacuum chamber and the beampipe Following Karelia meeting Iouri and Anna have checked the option of He bag as a beam pipe (inspired by NA61). It is NOT acceptable due to mimic of charm not far from the target and huge production of  -electrons in the STS region by ions per second. We stay with a vacuum pipe

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Conceptual design of the vacuum chamber and the beampipe

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Beryllium beampipe features Be: A=9, Z=4  =1.85 g/cm3 E=300 GPa  = MPa  =1-3% X 0 =35.28 cm  > n/cm 2 At the next slide: design coordinated with Beryllium institute and accepted for mechanical simulations and optimization The main question: are we sure that vacuum window won’t move back to 25 cm from target?

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split,

9 New Info for filling the magnet

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, New Info for filling the magnet Evgeny Matyushevsky and E. Litvinenko, JINR the magnet with the screens (RICH mode of CBM) - field map: /d/cbm01/litvinen/data/2009/FieldMaps/FieldSC_16x13.root geometry: /u/litvinen/cbm/JUN09/geometry/magnet_sc_16x13.geo the magnet without the screens (MUON mode of CBM) - field map: /d/cbm01/litvinen/data/2009/FieldMaps/FieldSCmuon_16x13.root geometry: /u/litvinen/cbm/JUN09/geometry/magnet_scmuon_16x13.geo We should use these files and remove from cbm-root release (or at leas mark as obsolete) field active and muon magnets! Space for inductive voltage converters

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Remarks about composition of the STS modules The algorithm for the sensor size selection require constant “strip fired” probability which leads to constant number of fakes per cm 2 P-pitch, l – strip length, N h –number of real hits, N f – number of fakes,  – “strip fired” probability, S – area seen by a strip

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Remarks about composition of the STS modules Station 1 (min strip 0.7 cm), central part.  =3.5%, N f /cm 2 =12, N h /cm 2 =10 Station 4 (strip 12 cm), peripheral part.  =1.8%, N f /cm 2 =3.2, N h /cm 2 =0.3 Station 1 (strip 4 cm), peripheral part.  =2%, N f /cm 2 =4, N h /cm 2 =1 Station 1 (min strip 1.4 cm), central part.  =7%, N f /cm 2 =48, N h /cm 2 =10 This fake density may be essential not only for tracking time, but even more for hypothetical tracker working with gaps

S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, Conclusions Current understanding of the SIS 100 beam does not assume really small beam spot size at CBM target. For single layer target it could be still OK. Anyway we’ll negotiate with the SIS team and optimize the parameters. 0.5 mm thick Be beampipe seems feasible and acceptable Current segmentation algorithm produces huge amount of fake hits especially in peripheral zones of STS stations. We should analyze possibility to increase number of channels.