(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/12 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/12 ( R.
NON-INT BEARING ADVANCES 1.Festival Advance 2.Flood/Drought Advance 3.Cycle Advance 4.Warmcloth Advance
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
LORD Addl. PD, DRDA, BOLANGIR Presentation by HARISHANKAR.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
PRESENTATION ON MANGLA DAM MADE BY: SYED ALI ZULQADAR. ROLL NO: 37.MAJOR: SES 5 th.
Pranahita – Chevella Project PHASE - II
By: Alizar Rizvi Fatima Raza VIII-A. Mangla Dam is located on the Jhelum river. Kashmir, Pakistan. It is the 16th largest dam in the world. It was built.
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
NIRAV JAYANTIBHAI DHANDHUKIA SHELADIA MIHIRKUMAR KISHORBHAI
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
Presentation on development works of Boipariguda Block Brief Note On BOIPARIGUDA BLOCK.
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
Hydro Electric Power Plant
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
DISTRICT RURAL DEVELOPMENT AGENCY, KENDRAPARA Success Story Presented By:- PANCHAYAT SAMITI Mahakalapara Dist-Kendrapara.
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
1 Performance review of the D/o RD & PR for RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT.
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
WATER RESOURCES DEPARTMENT
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
Mid Day Meal Scheme In Chhattisgarh. FACTS AND FIGURES OF CHHATTISGARH Total population Male Female Literacy rate 71.04% Population.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
ActionSoft Tool for Scheme Implementation & Monitoring.
BS3: FINANCING OF IRRIGATION PROJECTS 6 th April, 2016 INDIA WATER WEEK by R. K. Agrawal Senior General Manager.
Format for Presentation on Innovative Practices for States TWO DAYS CONFERENCE OF CEOs OF SLNA STATE :GUJARAT TO REVIEW IMPLEMENTATION OF WDC-PMKSY (ERSTWHILE.
:: Presented by :: (Rohit Gupta) DPC (Mahatma Gandhi NREGA) & District Collector Udaipur Mahatma Gandhi NREGA Udaipur.
KALABAGH DAM PROJECT General Reservations of Provinces on KBD Feasibility PROJECT BY RABIA RASHEED SHEHRBANO AKBAR ZIL-E-HUMA AKBAR.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
SPMU Details Sl. No. Post under NHP Name Designation 1.
Presentation on Ken – Betwa Link Project-Phase-II
Sardar Sarovar Narmada Nigam Ltd.
Review of CADWM Projects Under PMKSY
User Manual Financial Accounting
Virtual Review - #61 by Chief Minister Dt
Presentation transcript:

(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs) VAMSADHARA PROJECT (Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs) STAGE-I STAGE-II Completed in 1977 Ayacut 1,48,230 Acs. Main Left Canal : 104.24Kms. PHASE-I Estimated cost : 124.00 Crs. Utilisation : 12.499 TMC Ayacut : 62, 280 Acs Funding : AIBP I.P created 6/05 : 40,000 Acs I.P to be created by 6/06 : 22,280 Acs Target Date for completion : 6/2006 In Progress PHASE-II All 3 Packages (EPC) are awarded and works are in progress Utilisation : 20 TMC Total Ayacut : 45,000 Acs. Target Date for completion : 24 Months.

VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II) Project to be completed in 2 years period Ayacut = 14,231 Acres GOTTA BARRAGE (Stage-I) Utilisation = 17.841 TMC LEFT MAIN CANAL (LMC) ( STAGE – I COMPLETED) KM 104.24 VAMSADHARA RIVER VAMSADHARA RIVER RESERVOIR RIGHT MAIN CANAL (RMC) ( Phase-I of Stage – II) KM 0.00 KM 37 KM 52.973 HEAD REGULATOR CM & CD WORKS, DISTRIBUTARIES, FIELD CHANNELS Head Regulator :Completed Right Main Canal Length : 52.973 KM Completed : 37 KM Progress (Balance) : 15.973 KM Distributaries : 40 Nos. Completed : 18 Nos. Progress : 22 Nos. TARGET DATE OF COMPLETION : 7/2006 PROGRESS (6/2006) COMPLETED

VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-I OF STAGE-II) Project to be completed in 2 years period 1 PROJECT PROFILE : To Construction of Vamsadhara Project Right Main Canal (Phase-I of Stage-II) to irrigate an ayacut of 62,280 acres. 2 Administrative Sanction : Rs. 123.936 Crs. Vide G. O. Ms. No. 115, Dt: 14-8-2000 3 FINANCIAL Funding Agency AIBP (51.61 Crs.) Estimate Cost Rs. 86.811 Crs. Budget provision Expenditure of the project 1994 - 2004 Rs. 44.26 Crs. 2004 – 2005 Rs. 18.75 Crs. 2005 – 2006 Rs. 10.98 Crs. Cum. Exp. Rs.73.99 Crs. 4 Utilisation 12.499 TMC 5 Drinking water 3.26 lakh population 6 Ayacut New 62,280 acres IP created as on 2005-2006 40,000 acrses Balance IP to be created Khariff 22,280 acres 7 Target date 7/2006

VAMSADHARA FLOOD FLOW CANAL PHASE II OF STAGE-II VAMSADHARA RIVER SIDE WEIR (300M) KATRAGADA (V) HEAD REGULATOR FLOOD FLOW CANAL SINGIDI BALANCING RESERVOIR (Cap : 0.069 TMC) PARAPURAM BALANCIG RESERVOIR (Cap: 0.606TMC) 30 Km HIRAMANDALAM BALANCIG RESERVOIR 19.05 TMC 34.10 Km HIGH LEVEL CANAL GOTTA BARRAGE FFC (34.100 Km) Ayacut 20,000 Acres 5000 Acres Link Canal (4.053 Km) (Hiramandalam Reservoir to Gotta Barrage) 8000 C/s Stage – II, Phase – II Ayacut : 20,000 acres To Irrigate 1) Stage-II Phase-II (FFC) 45,000 Ac. 2) Supplementing 5 TMC from Hiramandalam Balancing Reservoir to Gotta Barrage 3) To supplement to right main canal

VAMSADHARA PROJECT RIGHT MAIN CANAL (PHASE-II OF STAGE-II) 1 PROJECT PROFILE : Construction of Vamsadhara Project Flood Flow canal formation of Hiramandalam Reservoir (Phase-II of Stage-II) to irrigate an ayacut of 45,000 acres 2 Administrative Sanction Rs. 933.90 Crs. Vide G. O. Ms. No. 33, Dt: 25.2.2005 3 No. of EPC Packages 3 Nos. 4 Agreement value of 3 Packages Rs. 492.82 Crs. 5 Budget Provision 2006-2007 Rs.158.50 Crs. 6 Expenditure of the project 2004-2005 Rs. 7.38 Crs. 2005-2006 Rs. 50.63 Cs Cum. Exp. Rs. 58.025 7 Ayacut 45,000 acres 8 Land Acquisition Required 10519 acres Acquired 1331 acres

9 Estimated cost of LA : Rs.87 Crs. 10 Estimated cost of R & R Rs.587 Crs. 11 Mob. Advance Paid Recovered 2004-05 Rs.6.93 Crs. -- 2005-06 Rs.17.68 Crs. -- Total Rs.24.61 Crs. --

VAMSADHARA PROJECT STAGE-II, PHASE-II (EPC SYSTEM) CATEGORY- II PKG No. Description Name of Contractor Bid /Agrt. Amount Rs in Crs. Agreement concluded date 87 Investigation, Design, Estimation & Construction of Side Weir, Head Regulator, Flood Flow Canal 14.205 Km, (0.00Km to 14.205Km) formation of Singidi Balancing Reservoir, CM & CD Works, Distributories, field Channels etc M/s Harvins Constructions Pvt. Ltd., 72.64 24-3-2005 88 Investigation, Design, Estimation & Excavation of Flood Flow Canal 19.895Km (from14.205 Km. to 34.1 Km.) formation of Parapuram Balancing Reservoir including construction of CM & CD Works, Balancing Reservoirs, Distributaries, Field Channels etc M/s Srinivasa Constructions Ltd 66.68 17-3-2005 OPEN CATEGORY OC Investigation, Design, Estimation of Earth Dam for Hiramandalam reservoir to storage capacity of 19.05 TMC of water and construction of surplus arrangements, construction of left head sluice for link canal to a discharge of 4000C/s on EPC Turn Key System M/s. Soma - Patel Enterprises Ltd. (JV) .353.50 5/2005 TOTAL: 492.82 Crs.

VAMSADHARA PROJECT Package No.87/CA-II : Construction of side channel and excavation of Flood Flow Canal from Km.0.00 to Km.14.205 Name of the Contractor : M/s. Harvins Constructions Agreement Amount : Rs. 72.64 Crs. Agreement Date : 24-03-2005 Period of Completion : 2 Years (8 Mile stones) Date of Completion : 3/2007 Investigation : 14.205 km Completed Designs - Canals (Structures) Approved (14.205 km against 14.205 km) in progress Execution 0.3 Km length No. of Machinery Deployed 72 Nos. Expenditure 2004-2005 - Rs. 3.6 Crs. 2005-2006 - Rs. 6.67 Crs. Cum. Exp. Mob. Adv. only – Rs. 10.27 Crs. Land Acquisition Required 828 Acres, Acquired: 278 Acres

VAMSADHARA PROJECT Package No.88/CA-II : Excavation of Flood Flow Canal from Km.14.205 to Km 34.10 and lining for a length of 15.44Kms and construction of Balancing Reservoir at Parapuram (Village) Name of the Contractor : M/s. Srinivasa Const. Pvt.Ltd. Agreement Amount : Rs. 66.68 Crs. Agreement Date : 17-03-2005 Period of Completion : 2 Years(8 Mile Stones) Date of Completion : 3/2007 Investigation : Completed (19.895 km) Designs (Canals) Approved 19.895 kms Designs (Structures) in progress Execution 0.8 Km length against 19.895 Km No. of Machinery Deployed 50 Nos. Expenditure 2004-2005 Rs. 3.33 Crs. 2005-2006 Rs. 10.19 Crs. Cum. Exp. Inc. mob. Adv. Rs. 13.52 Crs. Land Acquisition Required 1463 Acres, Acquired: 586 Acres

VAMSADHARA PROJECT Hiramandal Reservoir : Formation of Earth Dam for Hiramandal Reservoir to store a capacity of 19.05 TMC of water. Name of the Contractor : M/s. Soma-Patel ASI-JV. Agreement Amount : Rs. 353.504 Crs. Agreement Date : 31-03-2005 Period of Completion : 3 Years (12 Mile Stones) Date of Completion : 3/2008 Investigation : Completed Designs (HPs) Approved 7.08 Km against 54.00 Km Structures Under progress Execution in progress No. of Machinery deployed 6 Nos. Expenditure 2004-2005 Rs. 0.45 Crs. 2005-2006 Rs. 33.77 Crs. Cum. Exp. Inc. mob. Adv. Rs. 34.21 Crs. Land Acquisition Required 8228 acres, acquired 467 acres