US Army Corps of Engineers BUILDING STRONG ® Physical and Numerical Model Study of Montgomery Locks and Dam, Ohio River Allen Hammack, Howard Park, Cecil.

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

Change of the flow state
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
US Army Corps of Engineers BUILDING STRONG ® Craney Island Dredged Material Management Area AIWA Conference Thomas C. Friberg, P.E. Chief, Operations Support.
Fluidyn -FLOWSOL March D numerical simulation of surface flows.
Lower Yellowstone River Diversion Dam Project – Phase II - Physical Modeling of the Rock Ramp BRT, COE, MTAO Update Meeting November 4, 2010.
Weirs and Canal Intakes By: Nell Kolden and Taylor Barnett Thursday April 12, 2012 CIVE 717.
Irrigation Distribution Network Modeling for the Lower Rio Grande Valley of Texas Yanbo Huang, Guy Fipps Biological and Agricultural Engineering Department,
Weirs Generally, any flow obstruction that causes water to rise to flow over it, but used exclusively for intentional obstructions Uses include flow measurement.
US Army Corps of Engineers BUILDING STRONG ® Methods for Determining Maximum Flood Elevations Landward of Failed Levees: An Example from the Great Missouri.
Characterizing Vessel Travel Times with Waterway Levels in Case Studies Ivy L. Riley Jackson State University Civil and Environmental Engineering Department.
Computational Modeling of Flow over a Spillway In Vatnsfellsstífla Dam in Iceland Master’s Thesis Presentation Chalmers University of Technology 2007.
Saltwater Barrier: Is it a Restoration Alternative for the Northwest Fork of the Loxahatchee River? Loxahatchee River Management Coordination Council Meeting,
Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 2-Year Flood (2320 cfs) Lady Bird Lake Inflow (1.25 ft/s) 9/9/20081ALDEN.
Design of Hydraulic Controls & Structures
Central Valley Flood Protection Board Meeting – Agenda Item No. 13B.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
7 Inland Boating Chapter
DAVE REED HYDROLOGIST IN CHARGE NOAA/NWS LOWER MISSISSIPPI RIVER FORECAST CENTER Datums and Stages - Importance to the NOAA/NWS Hydrologic Services Program.
Dams Current Projects Vulnerability of zoned embankment dams to crest attack, Basic Research, FY07-08 Vulnerability of zoned embankment dams to waterside.
The In's and Out's of Locking Through a Dam By RiverBill.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
US Army Corps of Engineers ® Engineer Research and Development Center Coastal and Hydraulics Laboratory Greenup Locks and Dam, Ohio River.
SPILLWAY RATINGS and STABILITY DESIGN PROCEDURES __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS.
UNCLASSIFIED B UILDING S TRONG 1 LRD Navigation Scenario.
Research and Development Inland Navigation Research Inland Waterways Conference March 7, 2007 Cincinnati, OH Program Manager: James Clausner HQ Navigation.
Modeling in the USACE US Army Corps of Engineers BUILDING STRONG ® Bruce Ebersole U. S. Army Engineer Research and Development Center Coastal & Hydraulics.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Low Impact Development (LID)
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment SedFlume.
Research and Development Inland Waterways Conference 7 March 2007 Improved Hydrodynamic Design/Detection and Evaluation of Scour at Dams John E. Hite,
Travis Ball, PE USACE Seattle Hydraulic Engineering Section 2 May 2014 HWY 530 Landslide: Hydraulic Modeling in Support of County, State, and Federal Long-Term.
US Army Corps of Engineers Great Lakes & Ohio River Division US Army Corps of Engineers Great Lakes & Ohio River Division Achieving Navigation Systems.
Libby Dam June 2006 Spill: Total Dissolved Gas Monitoring.
6.7 Improved Traditional Systems
Welcome to WinPond Workshop Demo #1. 03/08/07 CNTSC-WinPond Workshop DEMO12 Demonstration Problem #1.
New Orleans District 2010 USACE/USGS/NWS Tri-Agency Meeting MVN WATER MANAGEMENT RESPONSE TO THE 2010 DEEPWATER HORIZON OIL SPILL Will Veatch Brainerd,
Basic Hydraulics: Culverts – I
HEC-RAS Version 3.1 Overview
Analyzing the Effects of Navigation Structures Edward Brauer, P.E. Applied River Engineering Center U.S. Army Corps of Engineers – St. Louis District.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation Integration of Results 6 Month Progress ERDC West Bay.
Waller Creek Outlet CFD Modeling Results Connection #2 with 3’ High Spillway Flip Bucket 500-Year Flood (11,270 cfs) Lady Bird Lake Inflow (3.5 ft/s) at.
BUILDING STRONG ® Rock Removal on the Middle Mississippi River 1 RRAT 2014.
FLOOD PROPAGATION UNCERTAINTY J. Mulet – F. Alcrudo Area de Mecánica de Fluidos, CPS-Universidad de Zaragoza.
MODELING FLOW IN LOCK MANIFOLDS
Basic Hydraulics: Rating curve. Definition & terminology Rating curve, also known as stage–discharge curve, is a graph showing the relation between the.
US Army Corps of Engineers Coastal And Hydraulics Laboratory Engineer Research & Development Center Morganza to the Gulf of Mexico Numerical Model Study.
Flood propagation Simulation of the IMPACT case study on the Tous dam-break flow Université catholique de Louvain Sandra Soares Frazão and Yves Zech.
Hydrology and Water Resources RG744 Institute of Space Technology November 13, 2015.
Research and Development Corps Navigation Mission Provide safe, reliable, efficient, effective and environmentally sustainable waterborne transportation.
Week 2. Work plan 2 Week 1 Week 2 Hydrological models Hydraulic models 1D quasi 2D 2D (25x25 m) Flood resilience 2D (5x5 m) Structural measures.
HydroEurope Final Presentation Pranav DHAWAN, Wooseok JANG, Kalpesh MALANI, Pablo SANCHEZ HERNANDEZ Clément LUCAS, Anna MSIGWA, Hakim OUERTANI, Malo LAMBERT.
Wanapum Dam Total Dissolved Gas Characterization Evaluation of the Wanapum Dam Fish Bypass (WFB) 2008.
HYDROLOGY & WATER RESOURCES ENGINEERING TYPES OF SPILLWAYS
1 Spillway Weirs and its Role in Dam Protection Husam Khaled Al Mubark Abdel Aziz Al Mesnd Roume Al Roume Abdullah Al Qashami Civil and Environmental Engineering.
Johnathan Bolton, Anpeng He, Ning Zhang (Ph.D.) Department of Engineering McNeese State University ULS Academic Summit April 12-13, 2013 DISCHARGE SOURCE.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
1 US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Pool 2 Channel Management Study.
EXAMPLE Water flows uniformly in a 2m wide rectangular channel at a depth of 45cm. The channel slope is and n= Find the flow rate in cumecs.
U.S. Geological Survey Office of Surface Water.
Infrastructure, Innovation and Standardization
Allen Hammack, PE US Army Corps of Engineers Engineer R&D Center
Ohio River Basin Energy Commodity Trends
Presented by Arne van der Hout Tom O’Mahoney Tommaso Boschetti
The shapes of stream channels
McNary Juvenile Fish Emergency Bypass System
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Anthony Keene Kristin LaForge CIVE 717 Spring 2018
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Physical and Numerical Model Study of Montgomery Locks and Dam, Ohio River Allen Hammack, Howard Park, Cecil Dorrell Engineer Research and Development Center Coastal and Hydraulics Laboratory

BUILDING STRONG ® This research focused on developing a device to protect spillway gates from runaway barges Project description Initial physical modeling Numerical modeling Subsequent physical modeling Conclusions

BUILDING STRONG ® Montgomery Locks and Dam is located on the Ohio River in the northeast USA In service since ft (30.5-m) gated spillways 2 fixed crest weirs Two locks 110x600 ft (33.5x183 m) 56x360 ft (17x110 m) Navigation problems on upstream approach Aerial view from downstream side

BUILDING STRONG ® The flow intercepted at the cell wall is referred to as the outdraft Outdraft causes vessels to move away from the landside guide wall and out of alignment with the lock chamber At the indicated line, the flow discharges were measured in the physical model to give an indication of the severity of the outdraft present The streamlines indicate the currents as the flow approaches the locks and spillway

BUILDING STRONG ® This model study is focused on the upstream lock approach 2.1 miles (3.4 km) upstream of the structure is modeled Model scale – 1:100 Fixed bottom of concrete 7 flows modeled 42, ,000 cfs (1,000-8,600 m 3 /s) Design flow – 135,000 cfs (3,800 m 3 /s) Tows modeled 15-barge flotilla – 105x975x9 ft (32x297x2.7) m 2-barge flotilla – 52x175x9 ft (16x53x2.7) m Spillway Locks Lock approach

BUILDING STRONG ® Certain design constraints limited the river/structure features that could be changed No changes to the existing structure (lock, dam, approach walls, etc.) Due to foreseen lock replacement or extension No changes to the spillway gate operation schedule No negative impacts to the use of the mooring cells on left descending bank Improvements should not interfere with industries in and around the area

BUILDING STRONG ® Dike fields consisting of six and seven dikes were investigated 7 th Dike Dike geometry Crown elevation is 15 ft (4.6 m) below the water surface ~650 ft (198 m) long at about a 400-ft (122-m) spacing 10-ft (3-m) crown width, 1 v on 1.5 h side slopes

BUILDING STRONG ® A 15-barge tow can successfully enter and exit the main chamber with seven dikes Flanking maneuver Upbound Downbound The downbound tow can flank to and maintain alignment with the landside guide wall and enter the main chamber – an improvement on existing conditions 7 th Dike

BUILDING STRONG ® The dike field reduces the currents and subsequently the outdraft by about 40% No Dike Field Dike Field Surface currents To minimize the impacts of the outdraft, dikes were added to reduce the flow into the immediate lock approach How could navigation conditions be improved even more?

BUILDING STRONG ® Would dredging alone be sufficient? Would both dredging and dikes be better? With the physical model time and budget constraints, thorough testing of dredge/dike combinations would be costly and time prohibitive Is there another tool readily available that could help? Numerical model (2D Adaptive Hydraulics) Shorter turn-around time per configuration Test multiple configurations and flow conditions simultaneously

BUILDING STRONG ® Adaptive Hydraulics (AdH) is a USACE flow solver maintained by ERDC Developed by ERDC-CHL and ERDC-ITL Can model closed-conduit, groundwater, and open-channel hydraulics Sediment and other constituent modeling techniques are being developed Automatic adaptive meshing – based on a single user-supplied value 2D depth-averaged flow module considered for this study

BUILDING STRONG ® Is a 2D model appropriate for replicating flow effects of a dike field? With the existing bathymetry, the numerically calculated discharges differ from the physical data by no more than 10%

BUILDING STRONG ® For the existing conditions, physical model flow traces (black lines) compared well to the numerical streamlines (red lines) The numerical model was validated using physical model results

BUILDING STRONG ® The models also compared well when the dikes were added Some discrepancies between the models are expected near the dikes because of the sudden changes in bathymetry

BUILDING STRONG ® The bathymetry upstream of the dam possibly reduces the effectiveness of the dikes The flow velocity increases sharply near the bathymetric shelf immediately upstream of the spillway The flow velocity increase is magnified when the dike field is added to the upstream approach

BUILDING STRONG ® The bathymetry upstream of the dam possibly reduces the effectiveness of the dikes Direct flow to spillway Above EL 640 Three dredges EL 640 Total Dredge EL 650 Total Dredge EL 640 Funnel Dredge Dredge focus area

BUILDING STRONG ® Existing EL 640 Total ~540,000 yd 3 (413,000 m 3 ) EL 650 Total ~220,000 yd 3 (168,000 m 3 ) EL 640 Funnel ~160,000 yd 3 (122,000 m 3 ) The three dredges vastly alter the bathymetry upstream of the dam

BUILDING STRONG ® Twelve possible dredge/dike combinations were investigated in the numerical model

BUILDING STRONG ® The funnel dredge was added to the physical model for barge tow runs Existing bathymetry Funnel dredge Surface currents Dredge

BUILDING STRONG ® General conclusions from this model study A dike field alone in the upstream lock approach significantly improves the navigation conditions A 2D numerical model can be used to model the flows around a dike field sufficiently for navigation models Using 2D numerical models to test bathymetric changes will significantly reduce the modeling time (~50-75% reduction) Thanks for your attention! Any questions?