1 Short Model Coils George Ellwood, Simon Canfer Jan 08.

Slides:



Advertisements
Similar presentations
3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Keystone Activities April 30, 2003 James H. Chrzanowski.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
Hydro-Electric Generator Manual Group number 403 Dan KJ Daewoo JT Group number 403 Dan KJ Daewoo JT.
BASIC CONSIDERATIONS IN DESIGN  The aim of the design is to completely obtain the dimensions of all the parts of the machine to furnish the data to the.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
1 Alan Bross MUTAC April 9, 2008 Lithium Hydride Absorber Program A. Bross for C. M. Lei.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
CARE-HHH-AMT Workshop on Heat Generation & Transfer in Superconducting Magnets Paris, November 190th Experience at CEA Experience at CEA Jaroslaw.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
Next European Dipole Insulation Development Simon Canfer, Elwyn Baynham, George Ellwood HHH Highlight Presentation at CERN, November.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
NED Project P. MANIL – CEA/IRFU/SIS – Short Model Coils meeting #18 – 25/01/2008 – slide 1/18 SHORT MODEL COILS PROGRAM SMC meeting #18 Pierre MANIL CEA/IRFU/SIS.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 15, 2003.
Evaluation of Modular Coil Cooldown Time with Thicker Insulation and Comparison of Original and Proposed Insulation Design H.M. Fan PPPL January 14, 2003.
Undulator Insulation materials Simon Canfer Advanced Materials Group Applied Science Division Technology
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
LARP Collaboration Meeting Racetrack Coil Fabrication
3 things needed to make a circuit: 1. Battery - energy 2. Wire – transfers the electricity 3. Indicator – tells you if circuit is working Ex: light, sound,
NCSX R&D Activity Update Jim Chrzanowski June 11, 2003.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
E. Cavanna, M. Duret, P. Ferracin, T. Genestier, L. Grand-Clement, F. Lackner, S. Luzieux, F. Savary, S. Triquet, J.C. Perez, M. Pozzobon, H. Prin, P.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Stator Plan & Schedule Chris Booth 2nd March 2009
Cryostats for superconducting magnets
Coil Design and Fabrication
11 T Dipole Integration & Plans M. Karppinen
CSP 25th November 2010 Technical agreement number 3: overview
WP-7 / Task 4 Very high field magnet
ESAC Review February 2013 CEA Saclay
Task 6: Short period helical superconducting undulator
Task 6: Short Period Nb3Sn Superconducting Helical Undulator
J.C. Perez on behalf of SMC collaboration team J.C. Perez
MBHSP02 test STATUS and first results
SMC Design overview of the construction and project issues
Government Engineering College, Palanpur
Structural analysis of the CBM magnet coil
Brief Status Report on Fabrication of ATF2 Quads
QXF schedule and milestones
Electric Machine Design Course
Presentation transcript:

1 Short Model Coils George Ellwood, Simon Canfer Jan 08

2 SMC Prototype 2 11/12/2008 we wound our second prototype magnet. This used copper cable and s-glass produced by JPS with a high temperature sizing. This was a double pancake magnet with 2 end spacers. The island and spacers were made from Titanium without any surface coatings.

3 Half the cable was used for the upper layer, this wrapped with glass and then held in place above the island. This rotated with the mandrel as the magnet was wound.

4 The joggle was formed by hand using this tool.

5 The cable was fed into the transition on the island and then clamped in place.

6 The cable was then wound round the island and the spacers were added.

7 The tail from the lower layer was clamped in place.

8 The cable for the upper layer was moved from the support structure and placed on the winding machine.

9 The upper layer was then wound.

10 Problems. The glass covering the transition was too fragile. We had to cover it with Kapton tape to hold it together. We need to find a way of making the transition that doesn’t damage the glass or need Kapton tape.

11 More than 1 reel of glass tape was needed. This was joined with Kapton tape. We need to find a way of joining glass tape that will pass electrical tests after heat treatment.

12 The upper spacers were put in upside down. This means that the upper layer is not the correct shape. Next time we will engrave markings on the spacers to clearly indicate which way up they need to go.

13 SMC schedule NameMaterialPurpose Oct 07Trial1CopperWinding machine familiarisation. Glass hand-wrapped. Steel island, ABS spacers COMPLETED Dec 07Trial2CopperGlass fibre machine-wrapped. Trial the tooling. COMPLETED Trial epoxy potting- Feb 08 Section for dimensional measurement of insulation. Feb/Mar 08Trial3CopperTrial heat treatment, section for mechanical testing: compression, SBS, thermal contraction April 08Trial 4Copper or alsthom Nb3Sn Instrumented as a real SMC. Follow all production stages. May 08Trial 5Contingency. May/June 08 SMC1Nb3SnReal coil July 08SMC2Nb3SnReal coil

14 Prototype 3 We aim to make the next prototype in March –This prototype will be made from copper cable but will be heat treated. –The spacers and the islands will be made of Titanium with an Alumina coating. Preparation: - Test better method of making the cable transitionreducing damage to glass tape - Trial glass tape joining ideas