LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC.

Slides:



Advertisements
Similar presentations
Coil TQ 36 size measurements F. Nobrega/ R. Bossert
Advertisements

LM dipole status & plans – Fred Nobrega 1 Long Quadrupole (LQ) Workshop, February 7-9, 2007 BNL - FNAL - LBNL - SLAC Long Dipole Mirror (LM) Status and.
LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
BNL - FNAL – LBNL - SLAC US LHC Accelerator Research Program LQ Reaction/Impregnation DR’s & Travelers at FNAL CM15 Magnet Systems Working Groups HQ Coils.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
NSTX Upgrade Testing TF Coil Flexible Connector Prototype In-Plane Deflection Test
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Aluminum bellows for experiments
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Long Racetrack (LR) strategy – G. Ambrosio 1 LARP DOE review - FNAL, June 12-14, 2006 BNL - FNAL - LBNL - SLAC OUTLINE: LR R&D goals & plans Long Racetrack.
1 Tests to Determine Lengths during Reaction of LQ cable R. Bossert, F. Nobrega, N. Andreev, G. Ambrosio, I. Novitski
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Surface Coatings & Tests for LARP Coil Endparts Task Force D.W.Cheng LBNL February 24, 2012.
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Coil Parts Task Force Video MtgG. Ambrosio 11 HQ/LHQ Coil Parts Task Force January 6, 2012 BNL - FNAL - LBNL - SLAC.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
MILLING By: Jacob Eames. setup The time required to produce a given quantity of parts includes the initial setup time and the cycle time for each part.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
LARP Collaboration Meeting Racetrack Coil Fabrication
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
L/R Coil Asymmetry Coil Fabrication Working Group Trey Holik Wednesday, June 3 rd 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
D. Arbelaez for the LBNL LCLS SCU team Mar. 3,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
Long Coil Manufacturing Plan and QA/QC by US HL-LHC-AUP Fred Nobrega / Jesse Schmalzle International Review of the MQXF Inner Triplet Quadrupoles for HL-LHC.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Rodger Bossert/Shlomo Caspi
Support structure and target pre-stress
LARP Technology Quadrupole Review
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
11 T dipole coil features and dimensions
Mechanical stability and QXF coil winding
SMC Design overview of the construction and project issues
New Magnets for the IR How far are we from the HL-LHC Target?
Brief Status Report on Fabrication of ATF2 Quads
Fred Nobrega September 4, 2019
Presentation transcript:

LQ03 Titanium Pole Length Study Fred Nobrega LQ Collaboration Video Meeting June 27, 2008 BNL - FNAL - LBNL - SLAC

LQ03 Ti Pole Length Study, Fred Nobrega 2 LQ Video-Mtg June 27, 08 LQ03 Ti-6Al-4V Pole Length Change After Reaction

LQ03 Ti Pole Length Study, Fred Nobrega 3 LQ Video-Mtg June 27, 08 Inner coil pole length change average = -17 mils ±.004, (  =.003) Outer coil pole length change average = -2 mils ±.007, (  =.004) Used tube furnace to HT parts from LQ03 and from stock at 650° C for 60 hours »2 x L1 parts from LQ03 and 2 parts from stock »2 x L2 parts from LQ03 and 2 parts from stock »2 x layer jump assemblies from stock LQ03 Ti-6Al-4V Pole Length Change After Reaction

LQ03 Ti Pole Length Study, Fred Nobrega 4 LQ Video-Mtg June 27, 08 HT LQ03 L1 pole & part from stock in steel clamp with 1200 lb compressive load LQ03 Ti-6Al-4V Pole Length Change After Reaction L1 pole from stock

LQ03 Ti Pole Length Study, Fred Nobrega 5 LQ Video-Mtg June 27, 08 LQ03 Pole Pieces After Reaction 6/12/08 on 6/12/08

LQ03 Ti Pole Length Study, Fred Nobrega 6 LQ Video-Mtg June 27, 08 Pole Pieces From Stock After Reaction

LQ03 Ti Pole Length Study, Fred Nobrega 7 LQ Video-Mtg June 27, 08 Clamped L1 Pole From LQ03 & Stock *Argon was lost at some point during the 60 hour heat treatment. * 6/12/08 on 6/12/08

LQ03 Ti Pole Length Study, Fred Nobrega 8 LQ Video-Mtg June 27, 08 Next Step(s) Bake LQ03 parts at 125 ° C for 24 hours (impregnation cycle) in free state and measure length change if any. Inspect with the CMM the clamped L1 parts that lost argon during HT for dimensional changes. Parts may need to be replaced. Consider repeating clamped part HT ???

LQ03 Ti Pole Length Study, Fred Nobrega 9 LQ Video-Mtg June 27, 08 Conclusions Ti-6Al-4V pole length change after reaction is not permanent. Slow length change occurs when compressive load is removed Ti-6Al-4V pole length change in free state with 650° C HT grows to near it’s original length Length change is not dependant on the manufacturing processes used. Layer jump parts were machined and pole parts were EDM’ed with some grinding to bring parts within tolerance. 3 different raw material Heats used for all parts not dependent on part length.

LQ03 Ti Pole Length Study, Fred Nobrega 10 LQ Video-Mtg June 27, LQ Ti-6Al-4V Parts