ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.

Slides:



Advertisements
Similar presentations
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Advertisements

Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Forward physics pertinent ECRs Mike Lamont, Samy Chemli.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
News and hot topics Impedance meeting 14/04/2014.
TOTEM Roman Pot Upgrade Project Pots design, tests and timeline production CERN 11 July 2013 D.Druzhkin (NIKIET, Moscow, Russia) 1 & 20th LTEX Meeting.
Overview of the LHC Year End Technical Stop
Survey activities during LS1 Dominique Missiaen On behalf of the SU section.
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
BRANs at HL-LHC Sune Jakobsen (BE-BI-PM) 1st HL-LHC WP13 Project Meeting
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
TE-CRG Activities D. Delikaris, TE-CRG.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
TOTEM Status Report F.Cafagna CERN & INFN-BA on behalf of TOTEM Collaboration.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Collimation Activities during EYETS
The timing upgrade project of the TOTEM Roman Pot detectors
CMS Luminosity Status Report
Framework Schedule from EYETS 2016 to LS2
EYETS David Hay EN-OSS.
Installation of an Instrument on a CERN machine
Injector De-cabling Project
Configuration Management and Layout Database ELENA Project
LHC Experimental Vacuum Systems Status October ‘07
LIU–PLI report LIU SPS meeting.
Powering the LHC Magnets
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
LS2 LHC forward experiments
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Short LHC-TS week 38 Confirmed by LMC on 16th August
Upgrade Strategy for the Experimental Vacuum Systems
Overview & baseline of LS2 and roadmap for CRG
(with R. Arcidiacono, A. Solano)
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Status of CMS-PPS timing detectors
J. Fleiter, S. C. Hopkins, A. Ballarino
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx

Contents General Documents 2015-TS2 documentation 2015-TS3 documentation YETS documentation S. Chemli for EN-MEF-DC2

Contents General Documents 2015-TS2 documentation 2015-TS3 documentation YETS documentation S. Chemli for EN-MEF-DC3

ATS-PM-MS-0001 Version 1.1 → Length of YETS / EYETS J. Coupard, D. Hay, D. McFarlane, S. Mataguez This is a proposal for the Year-End Technical Stops and the Extended Year-End Technical Stops before the Long Shutdown 2. It defines the length of the Technical Stops in the PS, PSB, SPS and LHC accelerators. Start and end dates of the YETS and EYETS might evolve in time, but lengths need to remain unchanged S. Chemli for EN-MEF-DC4 Master Schedule Under Approval

Contents General Documents 2015-TS2 documentation 2015-TS3 documentation YETS documentation S. Chemli for EN-MEF-DC5

LHC-X5ZDC-EC-0002Installing Optical Fibres & High Voltage Cables for the CMS ZDC Upgrade LHC-BCCM-EC-0001Inclusion of Beam Current Change Monitor as part of LHC Machine Protection Backbone 2015-TS2 Configuration S. Chemli for EN-MEF-DC6

Contents General Documents 2015-TS2 documentation 2015-TS3 documentation YETS documentation S. Chemli for EN-MEF-DC7

LHC-BGV-EC-0004Installation of a Protection Device for the BGV Detectors in LSS4 of the LHC LHC-X8FC-EC-0002Temporary Installation of LHCb Scintillating Fibre Tracker Test-Beam Module in RB84 LHC-VY-EC-0001Installation of New Racks for the Vacuum Pilot Sector in LSS L8 of the LHC 2015-TS3 Configuration S. Chemli for EN-MEF-DC8

Contents General Documents 2015-TS2 documentation 2015-TS3 documentation YETS documentation S. Chemli for EN-MEF-DC9

LHC-LJ-EC-0044Change of Powering for Q4 in IR1 LHC-TC-EC-0004Modification of Vacuum Layout to Recover TCT Fifth Axis Translation at IP1/5 LHC-XRP-EC-0012CT-PPS Timing & tracking detectors in horizontal Roman Pots (for standard optics) LHC-XRP-EC-xxxxTOTEM Timing detectors in vertical Roman Pots (for high beta*) LHC-XAFP-EC-0002Installation of the ATLAS/AFP stations, Phase-1 LHC-XAFP-EN-0001Alleviating the Helium Release Hazard in short Interventions to the AFP Roman Pot Stations during LHC Operation ` YETS Configuration S. Chemli for EN-MEF-DC10 Could start with TS3, then YETS

LHC-LJ-EC-0044Change of Powering for Q4 in IR1 LHC-TC-EC-0004Modification of Vacuum Layout to Recover TCT Fifth Axis Translation at IP1/5 LHC-XRP-EC-0012CT-PPS Timing & tracking detectors in horizontal Roman Pots (for standard optics) LHC-XRP-EC-xxxxTOTEM Timing detectors in vertical Roman Pots (for high beta*) LHC-XAFP-EC-0002Installation of the ATLAS/AFP stations, Phase-1 LHC-XAFP-EN-0001Alleviating the Helium Release Hazard in short Interventions to the AFP Roman Pot Stations during LHC Operation ` YETS Configuration S. Chemli for EN-MEF-DC11 Could start with TS3, then YETS

LHC-TDI-EC-0002Foreseen for September LHC-TDI-ES-0002Foreseen for September LHC-HHAAS-EC-0001Flood Sensors for LHC Lifts LHC-HHAAS-ES-0003Mitigation Measures during the PX24 Lift Replacement LHC-RP-EC-0001Change of RPTG Power Converters: LHC Warm Magnets Circuits RD1 and RD34 LHC-VAZ-EC-0005New Pumping Configuration for the Inner Triplet Left of Point 2 in the LHC YETS Configuration S. Chemli for EN-MEF-DC12

CT-PPS CMS-TOTEM Precision Proton Spectrometer Cerenkov Quartic timing detectors (cylindrical Roman Pots, 220m region, sector 4-5 and 5-6) & associated components – start: YETS 2015/2016 -> TS 2016 – ECR under preparation Pixel detector (horizontal RPs, 210m near/far, sector 4-5 and 5-6) & associated components – start: YETS 2015/2016 -> TS 2016 – ECR under preparation Clock distribution system - based on rigid RF cable to be laid from 220m region sector 4-5 via the bypass to 220m region of sector 5-6. – start: YETS 2015/2016 – ECR draft version already in EDMS (Finn Rebassoo) – First meeting with G. Canale (EN-MEF) took place last week > problems with the size of the cable drum -> not yet clear how to proceed. Already referenced as LHC-XRP-EC-0012 From M. Lamont presentation LS2 days indico

TOTEM Plan to progressively install the detector components in the Roman Pots Diamond Timing Detectors (vertical RPs of 220m near, sector 4-5 and 5-6) & associated components – start: TS > YETS – ECR - under preparation Pico-second clock distribution system (fibre based) – start: TS > YETS – ECR - under preparation From M. Lamont presentation LS2 days indico