Operational experience of high-power RF at Diamond Light Source Chris Christou, Pengda Gu, Alun Watkins Diamond Light Source.

Slides:



Advertisements
Similar presentations
ESLS 04 Daresbury Laboratory
Advertisements

IOT Measurements & Amplifier Improvements at Diamond
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
X-ray Booster IR Linac Harmonic RF RF Systems for NSLS-II J. Rose, A. Blednykh, N. Towne With help from many others at BNL and other institutions.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
CESR-B Cavities at the CLS Operating Experience J. Stampe, M. deJong, C. Regier, X. Shen.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Performance of the Advanced Photon Source 350-MHz 1MW CW Klystrons Doug Horan RF Group Accelerator Systems Division CWRF08 Workshop March 25-28,2008.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Solid State RF High Power Amplifier Developments at SOLEIL Ti RUAN, on behalf of SOLEIL RF Group CWRF10 CELLS-ALBA Barcelona Spain May
February 2010 ALBA Synchrotron Light Source Francis Perez.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Upgrades and EM simulations for the Diamond SR HP Amplifiers
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
Diamond LLRF Activities Pengda Gu For DLS RF Group.
650 MHz Solid State RF Power development at RRCAT
ALBA RF Systems Francis Perez.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Status of the Diamond Storage Ring RF Systems Morten Jensen on behalf of Diamond Storage Ring RF Group ESLS RF 2009.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Improvements to Diamond Light Source RF Amplifiers Peter Marten On behalf of the Diamond RF Group* *also C. Christou, P. Gu, M. Maddock, S. A. Pande, A.
Operation Status of the RF Systems and Taiwan Photon Source
Status of the ELETTRA RF Plants
Cost Optimization Models for SRF Linacs
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
The Survey of the Power Supply Reliability at SSRF
Status of BESSY II and bERLinPro
PETRA III, Status and Upgrade
Storage Ring RF Systems
High Energy Proton Synchrotrons
Overview of cavity reliability at Diamond Light Source
Status of RF at Diamond Light Source and overview of upgrade plans
Partial Warm-Ups at CLS
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Second SPL Collaboration Meeting, Vancouver May 2009
Accelerator Layout and Parameters
Machine Operation and Progresses in SSRF
CEPC RF Power Sources System
Operation Progress and Upgrade in SSRF
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
Status and New Developments of ALBA RF Systems
Presentation transcript:

Operational experience of high-power RF at Diamond Light Source Chris Christou, Pengda Gu, Alun Watkins Diamond Light Source

Chris Christou Alek Bogusz Pengda Gu Matt Maddock Peter Marten Shivaji Pande Adam Rankin David Spink Alun Watkins UK national synchrotron light source 3 GeV storage ring, 300 mA beam current Full energy booster and 100 MeV linac Running user beam since 2007, top-up since late statistics: 5088 hours to beamlines > 98% beam delivery RF is source of 60% of all beam trips Diamond Light Source The RF Group

SR RF Systems LLRF, DAs and Aux Supplies HV PSU IOTs and combiners Circulator and load Cryogenic plant RF test facility Superconducting cavities

Filament hours System 1 (standby) System 2 (active) System 3 (active) SR: e2v IOTD2130 Two 4-IOT amplifiers driving cavities for normal operation One amplifier for test/conditioning/standby 300 mA needs > 50 kW per IOT Further spares “on shelf” Up to 40,000 hours operation

Other RF Systems 100 MeV SLS-style NC linac 5-cell copper booster cavity

Injector RF Linac: Thales TH2100 klystrons  Rated at 37 MW, 100 Hz  Running at 16 MW, 5 Hz  Running open loop  Initial pair of klystrons replaced after 17,000 & 20,000 hours  Current pair of klystrons have run for over 30,000 hours each  Manage occasional arcs to minimise effect on machine operation  Triode gun with dispenser cathode  Changed once in August 2013 Booster: Thales TH793  Single IOT cycling to 50 kW at 5 Hz  41,000 filament hours  “Second hand” spares from SR  Very reliable at low average power

Machine Reliability

RF faults faults 2014 so far 19 faults

Cavity conditioning  Cavities are fully warmed up each shutdown  RF windows are baked each shutdown  Taken to 120°C and held for three days  Cavities are partially warmed up to 50 K several times each run  Every three weeks so far this year  Pulse conditioning every week in run-time  2.5 MV peak voltage,10% duty cycle (10ms/100ms)  Pulse conditioning with detuned cavity every week in run-time  Detune angle scanned to sweep standing wave in waveguide  NEG & TSP pumping of RF straight for H and He  Operating pressure 1 to 5 x mbar at 300 mA  TSPs fired every week, NEG cartridges regenerated every shutdown

IOT conditioning  Condition selected IOTs every shutdown  Emergency conditioning following ISC fault when appropriate  Using in-house spark box  Ramp to 45 kV and hold  2 ISC trips so far in 2014  ISC trips in 2013  Not tested 350mA in 2014  High power RF conditioning is an option  IOT internal short was the biggest single cause of beam trips in 2013  Increase in beam current to 350mA was disrupted by IOT reliability  350mA requires 65kW per IOT  Two weeks of 350mA running caused ~1/3 of all IOT trips  IOT 2/1 was replaced in May 2013

IOT fault tolerance  Can maintain beam when single IOT is switched off  240 mA with IDs, 250 mA without  No interlocks violated  Beam disturbance of several hundred microns in the horizontal plane  Can we introduce fast switching to give a resilient system?  Suitable fast solid state switches available  Behlke, …  LLRF is critical  Speed of response and multiple cavities  Protect IOT and save beam within 500 turns zoom

Cavity probe blips Before After 1 MHz ‘filter’ 10 Hz filter Add capacitor = 50 kHz BW P fwd Cavity Probe P rev Probe blips  Appear as fall in cavity voltage  LLRF increases power  Can trip on P max or P rev interlock  Address with LLRF bandwidth control Long events(~5 µS) can still cause cavity trips a circuit to detect blips and reduce LLRF gain is being developed 220 kW270 kW 1µs

Beam current upgrade  Desire for storage ring beam current to be raised  Driven by ever increasing beamline flux demand  Radiation shielding is rated for 500 mA operation  500 mA operation requires a third cavity and lower external Q Typical three cavity configuration 1.4MV, Q 0 = 6x10 8, Q ext = 1.2x10 5 Detailed three-stub tuner modelling is ongoing

Verification of 3-stub tuner models Control of Qext is vital for optimal operation at high power Model verification continues Note field at coupling tongue Need to establish electrical length to tuner

Verification of 3-stub tuner models Measurements of Qext for three independent stub insertions has allowed exact geometry to be established Measurements of 3-stub tuner operation now agree well with the model Stubs can be set for arbitrary beam currents and amplifier powers required for all modes of user beam operation

 Cavity 4 contract placed with RI Research Instruments GmbH  Use SSRF coupler tongue design and CLS pump-out box to give Q ext = 1.2x10 5  Vertical test at Cornell University carried out in July 2013  Rapid conditioning to full field  Q 0 exceeded specification  Q 0 > 1x10 9 at V acc < 6.67 MV/m  Q 0 > 5x10 8 at V acc < 9.33 MV/m Cavity 4 procurement

 Cavity 4 delivered to DLS in May 2014  Currently installed in the RF test bunker  Acceptance tests have begun  First cooldown scheduled for May 13 th  High power tests to begin in June Cavity 4 procurement

Location of new cavity Are we at risk of catastrophic failure if all three cavities are in a single straight? Interlock protected neighbouring straights in Diamond’s only previous vacuum event Put new cavity in remote location? Third harmonic cavity in RF straight?

Cryogenic issues for high current operation As beam current rises and number of insertion devices increases we will bring the new cavity into operation and introduce a third harmonic cavity What are the implications for the cryogenic system? Capacity of installed cryogenic system is 500 W Cold Box load is 82% of capacity with 2-cavity 300 mA operation and 1.8 MV on cavity in RF test facility Must consider the following factors for high-current operation Losses in third cavity Change in configuration of multichannel lines Introduction of third harmonic cavity Continued operation of cavity in test facility If we are to install the new cavity remote from the RF straight Machine restrictions may force us some distance from the cryogenic system We will need another valve box for the remote cavity Gas storage space for cool-down of all three cavities will also be an issue

RF noise on infrared beamline The high voltage power supply for the IOTs is a switched mode supply and as such generates noise on the voltage at the IGBT switching frequency and its harmonics Visible in HV spectrum Infra-red beamline notice the noise in their interferograms Broad-band measurement, so shifting frequency is not an option

Removing the switching noise Switching noise can be removed by disabling the PWM operation Works for klystrons (at SLS) but IOT current drifts with power and system is destabilised during dither at integral module changeover Power drawn from IOTs depends on beam current Varies during a fill and at different points in the top-up cycle Power drawn from IOTs depends on configuration of insertion devices Out of control of RF group! Must control switching of integral modules Dither must be removed by introducing a large hysteresis in HVPS current-control Possibly remove switching entirely and take up slack with LLRF loop Occasional shuffling of modules to ensure longevity Weekly during periodic maintenance or during to-up when kickers dominate disturbance Trials scheduled for June 2014… PWM off

Summary Diamond is a user facility and the RF group must cater to the beamline users Reliability is paramount Multiple single points of failure in SR RF system Noise or drifts are noticed immediately by beamlines Injector faults will disrupt top-up We are preparing for future machine developments RF system must develop as beam current increases Continuity of supply must be ensured for IOTs, klystrons and critical smaller components