Doc.: IEEE 802.15-04-0630-00 Submission November 2004 Robert F. HeileSlide 1 802.15 33rd Session of meetings of the IEEE 802.15 Working Group for Wireless.

Slides:



Advertisements
Similar presentations
Doc.: IEEE Submission March 2006 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
Advertisements

Doc.: IEEE xxx-00 Submission July 2006 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE Working Group for.
Doc.: IEEE q q Submission July 2014 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE Submission March 2004 Robert F. HeileSlide th Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE /310r0 Submission July 2002 Robert F. HeileSlide th Session of meetings of the IEEE Working Group for Wireless Personal.
Doc.: IEEE Submission July 2011 Robert F. Heile, ZigBee AllianceSlide 1 73rd Session of meetings of the IEEE Working Group for.
Doc.: IEEE Submission March 2010 Robert F. Heile, ZigBee AllianceSlide 1 65th Session of meetings of the IEEE Working Group for.
IEEE r q Submission Sept 2014 B. Rolfe (BCA)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE Submission November 2010 Robert F. Heile, ZigBee AllianceSlide 1 69th Session of meetings of the IEEE Working Group.
Doc.: IEEE /241r0 Submission May 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE Submission November 2008 Robert F. Heile, ZigBee AllianceSlide th Session of meetings of the IEEE Working.
Doc.: IEEE Submission March 2011 Robert F. Heile, ZigBee AllianceSlide 1 71st Session of meetings of the IEEE Working Group for.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE Submission November 2011 Robert F. Heile, ZigBee AllianceSlide 1 75th Session of meetings of the IEEE Working Group.
Doc.: IEEE Submission November 2007 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE Submission March 2008 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE Submission November 2009 Robert F. Heile, ZigBee AllianceSlide 1 63rd Session of meetings of the IEEE Working Group.
Doc.: IEEE Submission March 2014 Robert F. Heile, ZigBee AllianceSlide 1 89th Session of meetings of the IEEE Working Group for.
Doc.: IEEE Submission November 2012 Robert F. Heile, ZigBee AllianceSlide 1 81st Session of meetings of the IEEE Working Group.
Doc.: IEEE Submission November 2014 Robert F. Heile, ZigBee AllianceSlide 1 93rd Session of meetings of the IEEE Working Group.
Doc.: IEEE Submission July 2010 Robert F. Heile, ZigBee AllianceSlide 1 67th Session of meetings of the IEEE Working Group for.
Doc.: IEEE Submission July 2007 Robert F. HeileSlide th Session of meetings of the IEEE Working Group for Wireless.
Doc.: IEEE r2 Submission May, 2000 James D. Allen, Eastman Kodak Co.Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /241r4 Submission November 2004 Reed Fisher Oki Electric IndustrySlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0111r1 Submission May 2006 LEE, CUNYSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
IEEE TGa Project Timeline
Hyatt Regency Vancouver 655 Burrard Street Vancouver, BC V7X, Canada
July 2000 doc.: IEEE /338r0 November
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted: [13.
January 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
Submission Title: TG4r Sept 2014 Closing Report
SG4a Project Timeline January 2003 doc.: IEEE /056r0
doc.: IEEE /468r0 November 11-15, 2002 Hyatt Regency Kauai
<month year> doc.: IEEE ptc November 2013
July 2014 doc.: IEEE /3/2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
July 2000 doc.: IEEE /216r0 July th Session of meetings of the IEEE Working Group for Wireless Personal Area Networks July.
Submission Title: [Proposed project timeline]
Hyatt Regency Albuquerque 330 Tijeras, Albuquerque, NM 87102, USA
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2014]
November 2001 doc.: IEEE /468r0 November
Submission Title: ULP TG Closing Report Nanjing China
Submission Title: ULP TG Closing Report Waikoloa, HI 2013
Submission Title: ULP TG Closing Report Los Angeles, CA
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group,
Submission Title: ULP TG Closing Report San Antonio, TX
Submission Title: ULP TG Closing Report Dallas Texas
January 2003 doc.: IEEE /056r0 May 2004
<month year> doc.: IEEE ptc November 2012
SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
Submission Title: [Proposed project timeline]
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
Hyatt Regency Peachtree
<month year> doc.: IEEE ptc May 2013
<month year> doc.: IEEE ptc January 2014
Submission Title: TG4r November 2014 Closing Report
IEEE SGa Project Timeline
Submission Title: [Proposed project timeline]
Submission Title: ULP TG Closing Report Waikoloa, Hawaii, USA
Hyatt Regency Union Station
Hilton Portland & Executive Tower
November 2001 doc.: IEEE /468r0 July
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
Submission Title: Opening Report for the TG6 Session in November 2008
November 2001 doc.: IEEE /468r0 November
doc.: IEEE /468r0 March 10-14, 2003 Hyatt Regency DFW
Submission Title: [Proposed project timeline]
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
04 June 2009 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4g SUN Timeline Proposal] Date Submitted:
Nov 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing Report for TG4q (ULP) Task Group, Nov.
Presentation transcript:

doc.: IEEE Submission November 2004 Robert F. HeileSlide rd Session of meetings of the IEEE Working Group for Wireless Personal Area Networks November 14-19, 2004 Hyatt Regency San Antonio 123 Losoya San Antonio, TX 78205, USA

doc.: IEEE Submission November 2004 Robert F. HeileSlide Functional Organization Chart To add your name to the WG/SG/TG reflectors please go to

doc.: IEEE Submission November 2004 Robert F. HeileSlide 3 Objectives of the San Antonio Session November 15-19, 2004 TASK GROUP 1a OBJECTIVES FOR THE MEETING 1. Complete Sponsor Ballot Recirc 2. Submit to RevCom for Continuous Approval Process TASK GROUP 3a OBJECTIVES FOR THE MEETING 1. Conduct PHY proposal down selection process 2. Other contributions (as required and as down-selection process allows) TASK GROUP 3b OBJECTIVES FOR THIS MEETING: 1. Organize and evaluate proposed changes to Assign drafting tasks 3. Prepare to go to Letter Ballot

doc.: IEEE Submission November 2004 Robert F. HeileSlide 4 TASK GROUP 4a OBJECTIVES FOR THIS MEETING: 1. Hear Preliminary Presentations 2. Complete Channel Model effort 3. Hear final report from Ranging group 4. Revise Criteria Selection Document TASK GROUP 4b OBJECTIVES FOR THIS MEETING: 1. Discuss, Review, Organize and Edit existing MAC, PHY and Security proposals 2. Prepare Task Group motion for draft approval 3. Prepare Working Group motion for draft approval Objectives of the San Antonio Session November 15-19, 2004

doc.: IEEE Submission November 2004 Robert F. HeileSlide 5 TASK GROUP 5 OBJECTIVES FOR THIS MEETING: 1. Draft Technical Requirements Document STUDY GROUP 3C OBJECTIVES FOR THIS MEETING 1. Hear Responses to CFA 2. Discuss Channel Model 3. Discuss Technical Requirement 4. Complete Work on PAR & 5C Objectives of the San Antonio Session November 15-19, 2004

doc.: IEEE Submission November 2004 Robert F. HeileSlide 6 San Antonio Session Graphic

doc.: IEEE Submission November 2004 Robert F. HeileSlide 7 Upcoming Meetings Plenary-San Antonio, Nov 15-19, 2004 Interim-Monterey, CA Jan 17-21, 2005 Plenary-Atlanta, March 13-18, 2005 Interim-TBD, May 16-20, 2005 Plenary-SFO, July 17-22, 2005 Interim-tentative Anaheim, Sept 18-23, 2005