Joint Legislative Audit and Review Committee Pipeline Safety in Washington Oversight and Review of Washington’s Pipeline Safety Office Report Follow-up.

Slides:



Advertisements
Similar presentations
1 SAFETY ORGANISATION. 2 Safety Organisation 3 Safety Organisation - Regulator.
Advertisements

Module N° 4 – ICAO SSP framework
TERMS OF REFERNCE FOR THE IMPACT EVALUATION OF COSCAPs Dr. Ansgar Eussner, Chief, Evaluation and Internal Audit Office, ICAO.
ATS QUALITY ASSURANCE PROGRAMMES. 2 NAV CANADA: THE COMPANY NAV CANADA, a non-share capital, private sector corporation incorporated May 1995 Financially.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
SIEP HSE Management System
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
The Unique Alternative to the Big Four ® Gas Safety and Reliability Branch Management and Operations Review Report and Recommendations.
National Association of Pipeline Safety Representatives Robert Miller.
PRESENTATION SUMMARY Introduction – Living with the Red Introduction Introduction – Overview (Mike Ryan) Geography Geography – Living with the Red (M.
JLARC Study of Cost Allocation at Washington State Patrol Preliminary Report Keenan Konopaski, JLARC Staff Presentation to Joint Transportation Committee.
MFRPS Lesson Learned North Carolina
Community Services Block Grant (CSBG) Program Federal Monitoring Update James Gray Program Specialist.
1 Pipeline Safety Program Identify & Reduce Risks Before They Cause Harm Northwest Area Committee Meeting March 10, 2011 David Lykken Director of Pipeline.
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
Review of Accountability Entities Overseeing WSDOT Preliminary Report Keenan Konopaski, JLARC Analyst June 29, 2005.
Project Initiation Document (PID) Strategic Plan June 25, 2012.
Law Enforcement Consolidation Task Force OVERVIEW The Legislature enacted Senate bill 2160 which created the Law Enforcement Consolidation Task.
Archived File The file below has been archived for historical reference purposes only. The content and links are no longer maintained and may be outdated.
REGIONAL ANALYSIS ON DISASTER RISK REDUCTION EDUCATION IN THE ASIA PACIFIC REGION IN THE CONTEXT OF HFA PRIORITY 3 IMPLEMENTATION Bangkok, March 2009 Prepared.
UWF Budget Town Hall Meeting April 27, 2010 Dr. Judy Bense President University of West Florida FY Budget President Judy Bense June 14, 2012.
Republic of the Sudan The National Audit Chamber (NAC) Presentation to: INTOSAI Capacity Building Committee (CBC) Stockholm – September 8, 2015.
Mental Health Division’s Mental Illness Prevalence Study Briefing Memorandum January 7, 2004 Joint Legislative Audit and Review Committee Robert Krell,
Department of Natural Resources Fire Suppression Study Proposed Final Report Joint Legislative Audit & Review Committee June 22, 2005 John Woolley and.
United States Department of Agriculture Food Safety and Inspection Service February William C. Smith Assistant Administrator Office of Program.
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
PIPA IMPLEMENTATION What’s Been Happening in Washington State?
EARLY LEARNING COUNCIL AND SICC COLLABORATION: Addendum to September 30, 2012 Report on EI/ECSE Unique Complexities and Recommendations to Improve Service.
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
JLARC Study of Alternative Learning Experience Programs Interim Report February 8, 2005 Joint Legislative Audit and Review Committee Robert Krell, JLARC.
Performance and Outcome Measure Reviews: Department of Community, Trade and Economic Development and Employment Security Department Proposed Final Reports.
Final Follow-Up to JLARC’s 2000 Mental Health Audit: Status Briefing Joint Legislative Audit & Review Committee August 23, 2007 Fara Daun.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
 Is the process of conducting an exhaustive physical examination and thorough inspection of all operational systems and procedures of a facility.
Division of Developmental Disabilities: Analysis of How Services Are Prioritized Proposed Final Report to the Joint Legislative Audit & Review Committee.
Cheryl Simonson, CESA 6 Jacob Hollnagel, DPI. Guiding Successful Implementation of Educator Effectiveness Understand successful educator effectiveness.
Damage Prevention – Are States as engaged as they need to be ? Pipeline Safety Trust Meeting November 20, 2008 New Orleans, LA Glynn Blanton, PHMSA State.
Review of HVAC/R Testing and Licensing Proposed Final Report Joint Legislative Audit & Review Committee Keenan Konopaski September 14, 2005.
Office of Pipeline Safety Impacts of Integrity Management James K. O’Steen Deputy Associate Administrator for Pipeline Safety July 23, 2002.
An Overview: The Role of the Audit Committee in Monitoring, Oversight, and Compliance Derry Harper, Inspector General and Director of Compliance.
What APEC Task Force for Emergency Preparedness (TFEP) has progressed in the implementation of HFA Presented by Vincent Liu Program Director APEC Secretariat.
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
Gender : Topics  Definition  What kind of policy ?  Bureau for Gender Equality  Monitoring progress  Gender and the ILO Staff Union.
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
U.S. DOT Pipeline and Hazardous Materials Safety Administration Integrity Management Systems November 18, 2015 Chris McLaren - 1 -
Looking Forward + Carl’s Question Pipeline Safety Trust Annual Conference New Orleans, LA November 19, 2015.
Update on Recommendations from KPMG, Management Partners, and Task Force City Council Meeting November 16,
Response to Secretary’s Call to Action. NAPSR The National Association of Pipeline Safety Representatives (NAPSR) is a non-profit organization.
GOVERNANCE. In the year under review the DoW has a Risk Management Committee that meets to monitor the implementation of risk management initiatives and.
1 MINE HEALTH AND SAFETY INSPECTORATE PRESENTATION TO PARLIAMENT PORTFOLIO COMMITTEE ON INSPECTORATE 2011/12 ANNUAL REPORT 7 November 2012.
1 EASTERN MUNICIPAL WATER DISTRICT Risk Management and Insurance Program Doug Hefley Director of Safety, Risk and Emergency Management June.
1 MANAGEMENT OF CHANGE LEADERSHIP TOWARDS CHANGE, RENDERING STRUCTURES, FUNCTIONS AND PROCEDURES COMPATIBLE A Case Study of the Kenya Revenue Authority.
Superior Infrastructure – Phase One Lenora Chapman & Michelle Stevenson Presenting.
Office of Early Learning Quality Initiatives Overview Erin Smeltzer, M
City Services Auditor Charter Appendix F Discussion
Wyoming association of sheriffs and chiefs of police
State GHG.
EU Reference Centres for Animal Welfare
Monitoring and Evaluation using the
Maarten Steeghs Senior Advisor Agriculture and Nature Division
No regret and interim measures
ATS QUALITY ASSURANCE PROGRAMMES
PRESENTATION AND VALIDATION OF THE AGENDA AND THE MEETING OBJECTIVES.
WUTC National Sword Update
House Human Services Committee
Presentation to workshop
Presentation transcript:

Joint Legislative Audit and Review Committee Pipeline Safety in Washington Oversight and Review of Washington’s Pipeline Safety Office Report Follow-up June 16, 2004 Heather Moss, JLARC Staff

JLARC - Oversight and Review of Washington's Pipeline Safety Office June 16, Overview Legislature mandated JLARC review –1999 Bellingham explosion –WUTC delegated interstate oversight JLARC made recommendations in three areas: –Conducting Inspections –Mapping Pipelines –Assessing Fees WUTC has made progress in each area and plans additional efforts

JLARC - Oversight and Review of Washington's Pipeline Safety Office June 16, Inspections 2003 findings: Good job in developing program, but need to identify additional risk reduction strategies –Rec. 1: Focus on risk –Rec. 2: Integrate best practices In response: UTC established a task force to improve excavation techniques, adopted new gas safety rules, will enhance risk assessment training for inspectors

JLARC - Oversight and Review of Washington's Pipeline Safety Office June 16, Mapping 2003 findings: Extensive emergency response network already exists; the WUTC should identify how else it will use mapping information –Rec. 3: Integrate mapping with related efforts In response: UTC gradually developing GIS structure, next step is to identify specific local data needs; not yet investigating additional uses of system

JLARC - Oversight and Review of Washington's Pipeline Safety Office June 16, Fee Methodology 2003 finding: Fees charged to pipeline operators did not reflect actual costs of inspections –Rec. 4: Align fees with workload In Response: UTC changed the fee methodology to align inspection costs with fees charged to each operator

JLARC - Oversight and Review of Washington's Pipeline Safety Office June 16, One Year Later… In response to JLARC recommendations, UTC has taken a number of actions to improve pipeline safety efforts Some future proposed activities hold promise: –Developing a risk reduction strategy –Implementing enforcement policies –Using mapping to support inspections