Presents H.323 Forum 2002. H.323 Forum Certification Status Update Presented by Anatoli Levine RADVISION.

Slides:



Advertisements
Similar presentations
Achieving Seamless IP Optical Network Integration OIF Interoperability Update Amy Wang, Avici Systems.
Advertisements

- GDP 2011 versus 2010 – increase by 5.5%
Lone Tree Technology, Inc.
IMTC iNOW! - The Key to Major Market Share The initiative for V/FoIP equipment interoperability Jim Yu Director of Development ITXC Corp 600 College Road.
SIP Trunking Greg Rothman Director, SIPconnect Development Cbeyond.
ISO 9001 : 2000.
Fall Forum -- Keystone, Colorado USA -- November, 1999.
TETRA Inter System Interface (ISI)
AIMS Workshop Heidelberg, 9-11 March /20 A Telecom and IP Project from ETSI Gerald Meyer
Presents H.323 Forum ETSI TIPHON Presented by: Richard Brennan - Telxxis LLC Vice-Chair ETSI-TIPHON.
GSA Update Gaming Technology Summit May 21, Las Vegas.
UPnP Device Management Andre Bottaro France Telecom Group UPnP DM co-chairman End User Device Management panel Sunday, January 11th, 2009 CCNC'09.
Analysis of oneM2M Certification Model TST 15 Source: Sookhyun Jeon, TTA, Meeting Date:
Patricia de Suzzoni, Chair of ERGEG Customer Working Group Citizens’ Energy Forum, London, September 2009 Regulatory aspects of smart metering in.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Dennis Ward ATCB FCC Overview. CFR 47 FCC Regulation Part 2 General Requirements Part 5 Experimental Radio Service Part 15 Subpart C, D, and E Unlicensed.
Gigaconference II Bob Dixon and Megan Troyer OARnet Ohio State University Internet2 Commons December 5, 2006 Internet2 Fall Member Meeting Chicago, Illinois.
UPnP Certification Guidelines Rob Ranck Executive director, UIC Global Inventures, Inc.
Retained Executive Search Worldwide Trends, Challenges and the AESC European Annual Conference Madrid: November 13th, 2014 Peter Felix, AESC President.
N EW Y ORK S TATE O FFICE OF E MERGENCY M ANAGEMENT Director Bill Davis.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
DOCUMENT #:GSC15-PLEN-48 FOR:Presentation SOURCE: ATIS AGENDA ITEM: PLEN 6.10 CONTACT(S): James McEachern
Users’ Authentication in the VRVS System David Collados California Institute of Technology November 20th, 2003TERENA - Authentication & Authorization.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 Cisco Learning Credits A Solid Business Value Proposition.
SNIA/SSIF KMIP Interoperability Proposal. What is the proposal? Host a KMIP interoperability program which includes: – Publishing a set of interoperability.
Public SIP Interoperability Event »International SIP 2004«
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
World Class Standards CCIF New York - April Grids, Clouds and Service Infrastructures ETSI Strategy & New Initiatives.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
EHR System (EHR-S) Functional Requirements Implementation Guide: Laboratory Results Interface (LRI) Kickoff March 3 rd,
Peter F. Small (Sergeant Retired – Syracuse Police Department) Public Safety Communications Technology Specialist NLECTC-NE 26 Electronics Parkway Rome,
Presents H.323 Forum Voice over Internet Presented by Galeal Zino ITXC Corp.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Update on the Project 25 Compliance Assessment Program November 6, 2007 San Francisco, CA.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Presents Fall Forum H.235 Security Status Quo and Perspectives Presented by Martin Euchner, Rapporteur Q.G/16 Siemens AG.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
Project-X 3.0 Quality Criteria. QA Criteria Milestones Ø System Integration Complete (September) ùReady to start building production servers. Ø Project-X.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
OneM2M Interop Test Event Announcement Group Name: TST 16.2 Source: Jiaxin Yin, Huawei Technologies Co., Ltd. Meeting Date: Agenda Item: TBD.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Bernd Bruegge & Allen Dutoit Object-Oriented Software Engineering: Conquering Complex and Changing Systems 1 Software Engineering November 7, 2001 Project.
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
1 © 2001, Cisco Systems, Inc. All rights reserved. H.323 Forum Conference November Larry Schessel Sr. Manager, Cisco President, H.323 Forum November.
Proposed H.323 Forum Testing Program Support Sanjay Mishra – October 24, 2002.
2nd ITU-T-Forum Summit – San Francisco - July’03 At the ITU-Forum Summit 2003.
San Francisco - July’03 At the ITU-Forum Summit 2003.
Grid Deployment Board – 10 February GD LCG Workshop Goals Give overview where we are Stimulate cooperation between the centres Improve the communication.
SCORM Status. 2 Stabilization, Clarification and Issue Resolution Bug Fixes, Corrections & Clarifications SCORM 2004 January 2004 SCORM nd Edition.
ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
ITExpo January 24, 2006 Networks C OGNITRONICS Network Media Servers Conferencing and Collaboration Mike Keefe CTO Presented by.
Influencing Standards CB Forum Workgroup, Dublin 16th may 2001.
14 March 2002Update on SDoC - USA1 Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering.
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Conformance: Connectathons, Integration Statements & RFPs Kevin.
The Engineering Design Process
Discussion points for 2 nd Interop Event Group Name: TST WG Source: Keebum Kim, TTA, Meeting Date: TP#22.
Для sales-менеджеров с техническими элементами
Timeline – Standards & Requirements
Timeline - ATIS Involvement
Gigaconference II Bob Dixon and Megan Troyer OARnet
ETSI NFV POCS and PLUGTESTS
Redmond Protocol Plugfest 2016
Welcome to YOUR Community!
Timeline - ATIS Involvement
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
Centre for Testing and Interoperability (CTI)
The EU pilot programme on Environmental Technology Verification (ETV)
Sub Working Group 2 Protocols & Messages
Presentation transcript:

Presents H.323 Forum 2002

H.323 Forum Certification Status Update Presented by Anatoli Levine RADVISION

Sponsored in part by: H.323 Forum – November 2002 – New York, NY, USA Goals of H.323 Forum Certification Program Simplify deployment of standards-compliant equipment by the service providers and on the market in general Decrease cost of deployment for both service providers and equipment manufacturers by providing single verification capability accepted by the market

Sponsored in part by: H.323 Forum – November 2002 – New York, NY, USA Current State Work done through weekly conference calls with active participation of Cisco, WireOne, RADVISION, NexTone, MediaDigm, Polycom, iBasis, ITXC, Tandberg and others – everybody are welcome to join 3 levels defined – 1a, 1b and 2: –1a – basic protocol compliance (H.323v2 primarily) –1b – advanced protocol compliance (more of H.323v4 features) –2 – real world SP deployment requirements Level 1a and 1b currently stable, Level 2 is under development

Sponsored in part by: H.323 Forum – November 2002 – New York, NY, USA Open Issues and Challenges Level 2 requirements need to be finalized The certification process should be fixed and documented Detailed test cases need to be developed Self-certification versus 3 rd party certification for Levels 1a, 1b 3 rd party certification for Level 2 Record keeping for certified equipment Making H.323 Forum Certification accepted by the Service Providers and market in general

Sponsored in part by: H.323 Forum – November 2002 – New York, NY, USA Possible Solutions Possible Solutions ETSI TIPHON partnership – TIPHON has a collection of extensive test case documents which can be referenced from H.323 Forum Certification Documents Work with test equipment manufacturers to provide self-certification test suites. Acacia is one example ( Evaluate more 3 rd party interoperability labs, like Meir Communications (US), TestingTech (Germany).

Sponsored in part by: H.323 Forum – November 2002 – New York, NY, USA Next Steps – A To Do List Finalize and fully document certification process Finalize test cases Decide on self-certification/3 rd party certification Start pre-certification process at IMTC Interop events – next event is in France, January 2003 Finalize level 2 requirements Decide on Level 2 certification implementation

Thank You! Questions? Suggestions?