INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 1 InGAS General Assembly Meeting Prague -

Slides:



Advertisements
Similar presentations
The PMBR steady-state and Coupled kinetics core thermal-hydraulics benchmark test problems PBMR (Pty) Ltd. – NRG – Penn State Univ. – Purdeu Univ. - INL.
Advertisements

INGAS Meeting, Regensburg, 13 October 2011Mirko BARATTA INGAS INtegrated GAS Powertrain 1 Meeting – Regensburg Subproject A2 Status (month 31-36) Mirko.
Status Workshop FZJ Prof. Singheiser 1 Linde AG Business Unit Linde Engineering “ENCAP” Enhanced Capture of CO2 Status: July 2005 Dr. Ciattaglia.
INGAS 24th Months Brussels Meeting, 27 & 28 October 2010 INGAS INtegrated GAS Powertrain 1 Brussels Meeting, 27 & 28 October 2010 InGAS Integrated GAS.
Workshop June, 19 th, 2006 – DLR, Paffenwaldring 38 – 40, Stuttgart ( parallel application of Blends Of Natural Gas and HYdrogen in internal combustion.
Oxygen and oxides 2.16 recall the gases present in air and their approximate percentage by volume  
Flexible Canning System Automotive Catalytic Converter
INGAS “30 Months Meeting ”, “Oulu, Finland”, “25-26 May 2010” INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu - Finland May 2011.
INGAS 6th Month meeting, Prague, May 2009 Institut für Chemische Verfahrenstechnik D Stuttgart, Böblingerstr. 72 6th month meeting Prague,
Emission control technology for marine applications.
CHEE 323J.S. Parent1 Automobile Emission Control Government regulations require that automobile manufacturers control the amount of carbon monoxide, hydrocarbons,
Institute of Chemical Engineering page 1 Achema 2012 Thermal Process Engineering HyTime - Low temperature hydrogen production from second generation biomass.
“Ceryx means Clean Air” The QuadCAT Four-Way Catalytic Converter An Integrated Emission Control System for Diesel Engines presented to the: February 3,
Catalytic converters A catalytic converter is a device used to reduce the toxicity of emissions from an internal combustion engine. First widely introduced.
INGAS 18-months Meeting, Paris, France, May 2010 INGAS INtegrated GAS Powertrain Institute of Catalysis and Surface Chemistry Polish Academy of Sciences.
Methane Powered Heavy Duty Engine with Low Fuel Consumption and Euro VI Emission Compliance X. Auvray 1, N. Sadokhina 1, G. Smedler 2, U. Nylén 3, M. Holmström.
Exhaust Aftertreatment Modelling University of Thessaly Mechanical Engineering Department Assoc. Prof. Dr-Ing. A.M. Stamatelos Status March 2004.
Automobile Emission Control
WP 2: Gas Processing Unit 1 Strictly Confidential Workpackage 2: Gas Processing Unit KTI Review Meeting,
WP 3: Thermal System Strictly Confidential 1 Workpackage 3: Thermal System Project Meeting, May 11, 2006.
Electro- chemical Process Engineering Rheinländer SR_NG Chemical Process + Heat Integration Steam Reforming of Natural Gas for PEM Fuel Cells Center for.
The International Experience Europe Developing Road maps for Conventional Fuels in Asia Axel Friedrich Umweltbundesamt (UBA) Germany.
OVERVIEW  Introduction (myself, project)  Microwave plasma system  P&ID (Paschen curves)  Macroscopic description of the microwave plasma  Timeline.
Elygrid Project Diego Embid Foundation for the Development of New Hydrogen Technologies in Aragon (Spain)
Instrumented Vehicle BAQ Instrumented In-Use-Vehicles, a Versatile Tool to Measure Emissions BAQ 2004 Agra, India Dec 2004 Instrumented In-Use-Vehicles,
NTB INTERSTATE UNIVERSITY OF APPLIED SCIENCES OF TECHNOLOGY BUCHS MNT INSTITUTE FOR MICRO AND NANOTECHNOLOGY Patrik Müller, Andres Bolleter, Aziz Ibzazene.
INGAS “18 Months Meeting ”, “GDF-SUEZ Paris, France”, “20-21 May 2010” INGAS INtegrated GAS Powertrain 1 INGAS 18 months meeting GDF-SUEZ, Paris - France.
Hydrogen from Renewable Fuels by Autothermal Reforming: Alcohols, Carbohydrates, and Biodiesel Lanny D. Schmidt Department of Chemical Engineering and.
ThermoNeutronics, LLC featuring energy solutions for tomorrow… Generation III Integrated Energy Technologies Property of ThermoNeutronics, LLC.
Purification of Exhaust Gases Removal of pollutants from exhaust Removal of pollutants from exhaust gas after they leave the engine cylinder can be done.
INGAS 6 months Meeting, Prague, May, 2009 INGAS INtegrated GAS Powertrain 1 CVUT-JBRC Scope Experimental Facilities – General Features – InGAS Customizing.
INGAS meeting, Oulu, May 25 th /26 th, 2011 INGAS INtegrated GAS Powertrain 1 SP B0 Status presentation, outline E.ON Ruhrgas - Engine tests on oil influence.
INGAS 6-months Meeting, Prague, Czech Republic, May 2009 INGAS INtegrated GAS Powertrain 1 Institute of Catalysis and Surface Chemistry Polish Academy.
Technology For 2007 And Beyond Dr. Steve Charlton Executive Director – Advanced Engineering Cummins Inc.
INGAS INtegrated GAS Powertrain INGAS “reviewer meeting”, “Brussels”, “April 2011” 1 Reviewer Meeting, Brussels, 8 th April, 2011 SPB2 Aftertreatment for.
INGAS 18 months Meeting, Paris, May 2010 INGAS INtegrated GAS Powertrain 1 18 Month Meeting Paris, Subproject A2, Turbo DI CNG Engine Alois Fürhapter,
01/04/2014 / Page 1 (Disclosure or reproduction without prior permission of FERRET is prohibited). A Flexible natural gas membrane Reformer for m- CHP.
INGAS SPA2 Meeting, Regensburg, October 13 th 2011 INGAS INtegrated GAS Powertrain 1 SPA2 Meeting Regensburg, Month 37, Turbo DI CNG Engine Alois Fürhapter,
INGAS - Integrated GAS Powertrain Project number: Project number: DAIMLER AG INGAS 18 months meeting, Paris, 20./ InGas 18 months.
INGAS 18 th month meeting, Paris, May INGAS INtegrated GAS Powertrain 1 Politecnico di Milano Dipartimento di Energia Research Activities Nov.
INGAS INtegrated GAS Powertrain INGAS – SPB2 – 24-Month Meeting Brussels 27/28 October INGAS 24-Month Meeting Brussels October Integrated.
INGAS “24 Months Meeting ”, “Brussels, Belgium”, “27-28 October 2010” INGAS INtegrated GAS Powertrain 1 INGAS 24 months meeting Brussels - Belgium 27 -
INGAS meeting, Naples, Nov INGAS INtegrated GAS Powertrain 1 Continental Automotive GmbH Advanced development (AD) at INGAS SPA2 Meeting
INGAS 6 month meeting, Prague, May 2009 INGAS INtegrated GAS Powertrain 1 Politecnico di Milano Dipartimento di Energia Research activity from Nov.
DIMETHYL ETHER- AN ALTERNATIVE FUEL INTRODUCTION World present oil resources may be wiped out in 42 years World present oil resources may be wiped out.
Shaping the Future Exhaust After Treatment Systems.
1 Initial Study Task Mark Herring / Jordan Camp. 2 May 13, 2003 Topics Purpose of Initial Study Task Schedule and Format Task Description.
INGAS 18 months meeting, Paris, 20./ DAIMLER AG INGAS INtegrated GAS Powertrain InGas 18 months meeting May, 20th/21st 2010 Paris, France SPB2.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
INGAS 12 months Meeting, Naples, 5-6 November 2009 INGAS INtegrated GAS Powertrain 1 12 Month Meeting Naples, Subproject B2, Status AVL (month 7-12) Marko.
Effects of Oil Derived Poisons on Catalyst Performance and Emission Test Considerations Presented to; GF-5 Engine Oil Emissions Systems Compatibility Task.
INGAS - Integrated GAS Powertrain 24 months Meeting, October, 2010 Project number: October 2010 Project number: October.
Using COMSOL for Chemical Reaction Engineering Your name COMSOL.
1 Lean Ships General Principles The Project is funded in the H2020 Work Progamme of the European Union Contract No.:
Process engineering Quality controls.
Thermag VII Torino Italy
Ventilation Air Methane – Converting a Greenhouse Gas into Energy
LeanShips Project General Principles
STEP 1 Low-Temperature Oxidation
Manufacturing of the first FCC-hh beam screen prototype for ANKA
86 CATALYTIC CONVERTERS CATALYTIC CONVERTERS.
SE Catalytic converter is a classic example of green technology
Baltic Sea cooperation for reducing ship and port emissions through knowledge- & innovation-based competitiveness BSR InnoShip Baltic Sea cooperation for.
WP 2: zero-drift contact temperature sensors Claire Elliott
RDE Regulation Commission Meeting
Development of a Suitable Test Protocol
Catalyst Deactivation
LeanShips Project General Principles
Presentation transcript:

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 1 InGAS General Assembly Meeting Prague - Czech Republic May 2009 InGas 6th months meeting: SPB2/Ecocat

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 2 Ecocat is taking part in: –WP2.1 (requirements/boundary conditions) –WP2.2 (advanced catalyst development) –WP2.3 (exhaust heating/catalyst concepts) InGas 6th months meeting: SPB2/Ecocat

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 3 WP2.1 (requirements/boundary conditions) –The planned objectives in this WP are collection and definition of relevant information about fuels, exhaust, engine characteristics, ECU functions and testing conditions in order to ensure common working basis and guidelines for different partners. –In the beginning Ecocat’s role is to deliver reference catalysts to the partners –In task TB2.1.2 (Catalyst testing/ageing conditions) the reference catalysts have been prepared, which will be used as a reference matrix for the further catalyst (both substrate and washcoat) development InGas 6th months meeting: SPB2/Ecocat

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 4 InGas 6th months meeting: SPB2/Ecocat Reference samples: Ceramic ICeramic IIMetallic Dimensions (mm)118x70118x50118x50,8 Volume (dm 3 )0,770,550,56 Wall thickness (Mills/ µ m) 63,550 Cell density (cpsi)

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 5 InGas 6th months meeting: SPB2/Ecocat Reference samples –Washcoated with stoichiometric NG coating –Washcoat thickness has been specified to 50 g/m 2 –Pd-Rh technology; 200 g/cft Pd:Rh 39:1 –Sent to: Daimler (2 ceramic + 1 metallic) Kracow (1 ceramic) Politecnico Milano (1 ceramic) Universität Stuttgart (1 metallic) Reference catalyst powder –Pd containing catalyst powder (6,3 wt-% Pd) –Sent to: Krakow (20 g) Politecnico Milano (20 g)

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 6 InGas 6th months meeting: SPB2/Ecocat WP2.2 (advanced catalyst development) –The main work packet objectives during the project are: The development of new catalyst formulations for methane oxidation with a light off temperature below 350°C A high thermal and sulphur stability, Development of a modelling tool for methane oxidation Delivery of kinetic data, control strategy for methane (lambda = 1, lambda >1) and NOx abatement (lambda>1) Development of coating methods for catalyst up scaling and canning.

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 7 InGas 6th months meeting: SPB2/Ecocat Preliminary washcoat development –Has been started in order to improve catalyst formulation for requirements introduced in the project –In Ecocat the development is based on the wide knowledge and the results achieved during the earlier projects in the area –Both the basic laboratory tests like light off and lambda window tests will be used besides the verification in real engine –Engine tests are planned to be done in commercial 1.2 LD bi-power vehicle using CNG as a fuel

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 8 Light off temperatures in laboratory tests (λ=1) for aged samples (20h/LS- 1030°C) : Ø 14mm x L 75mm; SV /h InGas 6th months meeting: SPB2/Ecocat

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 9 RAH ageing description InGas 6th months meeting: SPB2/Ecocat STOICHIOMETRIC CRUISE POWER ENRICHMENT 4% CO Time (sec) AIR INJECTION 4% O °C 1050 °C

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 10 RAH temperature profile –40 h ageing corresponds about km on road (< 1.4 l vehicle) InGas 6th months meeting: SPB2/Ecocat 10 mm 10 mm Substrate

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 11 Engine test results for fresh and aged Pd-Rh samples –1,2 liter E4 bi-power vehicle –Ø 100mm x L 150mm; 1,18 l; NEDC InGas 6th months meeting: SPB2/Ecocat

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 12 InGas 6th months meeting: SPB2/Ecocat In task TB2.2.4 (Coating methods/Up-scaling) coating methods are identified and applied for an up-scaling of the new catalyst formulations on full-size monoliths After the new catalyst formulations were developed in task TB2.2.1, the coating ability with up-scaling at full-size will be identified and thereby will be investigated in an engine bench In the beginning the successful coating will be evaluated in terms of stability and reactivity.

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 13 InGas 6th months meeting: SPB2/Ecocat WP2.3 (exhaust heating/catalyst concepts) –Planned objectives & starting points Definition of the EAT concept with heat exchanger and catalyst /integrated or serial concept) Development of a modelling tool for the whole EAT system Simulation of the behaviour of the EAT depending on operating conditions Evaluation of the selected concept on a laboratory scale for methane and NOx removal Building of 2 prototypes for laboratory investigations and 2 prototypes for engine/vehicle testing

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 14 InGas 6th months meeting: SPB2/Ecocat Work in Ecocat –Ecocat has delivered metal foil samples to USTUTT to be used on preliminary test for building the heat exchange unit –The preparation of preliminary small scale samples are in progress in USTUTT –Fixing trials by brazing or welding are in progress in Ecocat –After the validation the next step would be to make a complete heat exchanger package for a lab scale reactor

INGAS “General Assembly Meeting ”, “Prague, Czech Republic”, “25-26 May 2009” INGAS INtegrated GAS Powertrain 15 InGas 6th months meeting: SPB2/Ecocat Next –Continue the laboratory scale development for new catalyst materials Pd-based for methane Promoters, stabilizers –Own engine tests: activity and durability –Coating development for the new materials