FCIA Firestop Industry Conference San Antonio, TX November, 2008 Betsy Titus Gary Knef Underwriters Laboratories.

Slides:



Advertisements
Similar presentations
P2P Update January 17, P2P Update  Promote performance based specifications as the preferred alternative to prescriptive specifications through.
Advertisements

Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
A Feedback and Continuous Improvement Tool to ACE Audit Readiness Keith S. Joy Quality Manager September 14, 2004.
EPSON STAMPING ISO REV 1 2/10/2000.
Introduction to SSPC CAS Program
Marcy Mealy Procurement Specialist CDBG Program
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Quality Management System
CSI Certification Presented to the Louisville Chapter of CSI November 13, 2014 Edmund L Brown, CSI, CCCA, Assoc. AIA Project Architect, Sebree Architects.
Building and Sustaining Total Quality Organizations
ISO 9000 Certification ISO 9001 and ISO
How ISO 9001 Fits Into The Software World? Management of Software Projects and Personnel CIS 6516 March 6, 2006 Prepared by Olgu Yilmaz Swapna Mekala.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
4. Quality Management System (QMS)
BUILD WITH US. ™ Contractors
Achieving Certification A To-Do list for Your Certification Project FSSC
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
JENN SHAFNER BRIAN KROUSE CLINT KEHRES. Pre ISO 9000  The BS 5750 standard required factories to document manufacturing procedures.  BS 5750 was known.
Even More SQA: Work Procedures
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
How the ISO/TS Additions have moved from 1st to 2nd edition
WHAT IS ISO 9000 ? Founded in 1946 in Geneva, Switzerland. ISO 9000 is an internationally recognised quality management system developed by ISO (International.
Objectives 4 Understand the ISO standards. Why are standards required? 4 Need standards to ensure that a term means the same for all 4 Need company standards.
Center for Offshore Safety
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
April 11, 2007 Strengthening Communities Conference Managing Your Risks Ron Dennill Northern Communities Insurance Program.
1 © Mahindra Satyam 2009 Quality Management System Mahindra Satyam’s Quality Guide ISO Slides.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
H&S Consultants Consulting Services and Project Management.
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
1/25 S tandardization & Quality Assurance Policy Management Cross- Functional Management Daily Management Suggestio n System Quality Control Circle 5S5S.
SPED Certification Program September 17, 2003 Houston, TX.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
BQ-9000 Overview Leland Tong March 16, Objectives of BQ-9000  To promote the commercial success and public acceptance of biodiesel  To help assure.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Microsoft Office User Specialist Program Presentation to MPUG – June 20, 2000 Nivo International: Brent Mason, Director of Sales Oyvind Ragnhildstveit,
Agency Construction Management :CM NOT AT-RISK
New Reactor Construction Inspection
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Responsibility & Authority Module #2 Prepared by Dr. Randy R. Rapp July 2005.
Q u a l i t y 1 Austin Energy Electric Service Delivery Quality Management System.
Quality Standards ISO:9000 ISO:9000 Quality Systems Under ISO:9000 Quality Systems Under ISO:9000 ISO:14000 ISO:14000 ISO Certification Process ISO Certification.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
DOECAP Laboratories Phased Audits U.S. Department of Defense 2016 Environmental Monitoring and Data Quality Workshop St. Louis, Missouri April 12-14, 2016.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
JPPF MEETING th MARCH 2013 BIRCHWOOD CONFERENCE CENTRE JPPF March S.GOVENDER.
The following training presentation is for all 1Prospect employees and is taken upon joining the company team. Quality Management System (QMS) Training.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
UNDERSTANDING ISO 9001:2008.
Barrier Management Symposium
COR™ Associate Auditor Program
DOECAP Laboratories Phased Audits U. S
The following training presentation is for all employees and is taken upon joining the company team. Quality Management System (QMS) Training Proprietary.
UNIT V QUALITY SYSTEMS.
Delivering structured project solutions with a flexible methodology
Achieving Certification
Quality Control Personnel Training
What is the UL QFCP? FCIA Webinar Presenters:
UNDERSTANDING FOR STANDARD
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
Steps towards Certification
Prime Factors for Successful Preservation Treatments
The Value of Accreditation
Presentation transcript:

FCIA Firestop Industry Conference San Antonio, TX November, 2008 Betsy Titus Gary Knef Underwriters Laboratories

2  GLEESON POWERS – 1 st UL Qualified Firestop Contractor  Specialty Firestop Systems  Carolina Insulation  Firestop Logistics UL Qualified Firestop Contractors Status:

3 UL Qualified Firestop Contractors How do you find a UL Qualified Firestop Contractor? UL’s Qualified Contractor Program

4

5 Qualified Contractor Promotions How do you find a UL Qualified Firestop Contractor?  UL’s on-line directory lists Qualified Contractors  Contractor’s promotional material includes: UL Qualified Firestop Contractor Program Certificate UL Qualified Firestop Contractor Program Marking UL’s Qualified Contractor Program

6 November 2006 UL Qualified Firestop Contractor Program Status: Contractors Passing DRI Exam November 2007 November Contractors 33 Contractors 45 Contractors 47 companies have passed DRI exam

7  GLEESON POWERS – 1 st UL Qualified Firestop Contractor  25 Contractor Companies Applied for Contractor Program & Actively Getting Ready for UL Audit UL Qualified Firestop Contractor Program Status:  47 Contractor Companies Successfully passed DRI Exam  4 UL Qualified Firestop Contractors

8 MASTERSPEC Specification  Gives architects a requirement to specify  Gives GCs a means to identify and select specialty firestop Contractors  Allows Contractors to differentiate themselves as specialty firestop contractors  Increases Contractor’s “win rate” for premium bids MASTERSPEC UL’s Qualified Firestop Contractor Program:

9 UL Qualified Firestop Contractor Program Promotions: UL/FCIA Symposium LA in January ’08

10 UL Qualified Firestop Contractor Program Promotions: UL/FCIA Symposium LA in January ’08 UL/FCIA Symposium San Francisco March ‘08

11 UL Qualified Firestop Contractor Program Promotions: UL/FCIA Symposium LA in January ’08 UL/FCIA Symposium San Francisco March ‘08 Hilti Workshops & Symposiums

12 UL Qualified Firestop Contractor Program Promotions: UL/FCIA Symposium LA in January ’08 UL/FCIA Symposium San Francisco March ‘08 Hilti Workshops & Symposiums 3M Meetings

13 AHJ Meetings U.S. & Canada UL Qualified Firestop Contractor Program Promotions:

14 AHJ Meetings U.S. & Canada UL Qualified Firestop Contractor Program Promotions: ULC Advisory Council May ‘08

15 AHJ Meetings U.S. & Canada UL Qualified Firestop Contractor Program Promotions: ULC Advisory Council May ‘08 Articles

16 AHJ Meetings U.S. & Canada UL Qualified Firestop Contractor Program Promotions: ULC Advisory Council May ‘08 Articles Architect Shows Construct Canada Nov ’07 Specifiers Canada Feb ’08 CSI June ‘08

17 UL’s Contractor Program requires :  Management System (MS) specifically focused on the proper selection and installation of firestop systems so that knowledge is applied throughout the Contractor firm as evidenced by audit of Contractor’s MS  Demonstrated knowledge of selection and installation of firestop systems as evidenced by written exam of a “Designated Responsible Individual” (DRI) UL’s Qualified Contractor Program provides a credible solution UL’s Program Fills the Gaps

18 The Processes The essential processes for:  Review of construction document requirements and specifications  Selection, purchasing, storage and handling of materials  Installation, application and field quality assurance procedures – transmitting design and installation requirements to the field  Inspection and testing – testing to verify that installed designs meet requirements  Control of nonconforming materials  Installer inspections and correction processes  Training and qualification of staff  Audits of own work and processes for continued improvement

19 SuppliersCustomers Activity Man, Machine, Methods, Materials InputsOutputs Controls and measures of activities within the process Firestop Contractor’s Overall Process Value of Management System

20 Benefits to Stakeholders Business owners: Building Owner Architects Engineers General Contractors Building Inspectors Firestop Installation Contractors Business objectives: UL’s Contractor Programs: Increase confidence in the installation Contractor that materials are installed to requirements Differentiates specialty Contractors utilizing management system processes to provide consistent installations that meet requirements

21 Next Steps Requirements - Review & understand the UL Qualified Firestop Contractor Program Requirements Checklist - Review the Checklist & conduct a self-assessment of your management system. Exam - DRI completes and successfully passes UL exam Apply - Apply for the UL Qualified Firestop Contractor Program - complete and return the Application. Quote & Contracts - We send you a quote and contracts; You accept the quote and return the contracts & deposit Discuss - Discuss with UL Auditor any questions on Requirements, Checklist and your management system. Audit – We schedule and conduct the audit of your facility and job sites. Qualification Achieved – Your firm added to list of Qualified Contractors; you are authorized to use the UL Certificate & Marking

22 UL’s Qualified Contractor Program provides a credible solution Questions?