Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. Upgrading PeopleSoft HR & SA to Version 8.9 USM Regional PeopleSoft Conference June.

Slides:



Advertisements
Similar presentations
Test Long and Prosper presented by Janet Gray July 26, 2005.
Advertisements

EmpowHR 9.0 Upgrade Status Meeting Thursday, June 12, :30 A.M. – 4:00 P.M. (EDT)
What do we mean by Real-Time Business? Gaurav Tomar Usha Raghavan
Presentation to ASTRA January 6, 2011 Kent Olson, Director, Division of Accounts & Reports.
Refresh, V.10, July 2, 2010 Name Title, Date Copyright © 2011 Infor. All rights reserved. INFOR – A LOOK INTO THE FUTURE NameJamie Bridgman TitleAccount.
Application Maintenance – Tips and Tricks for Keeping Your Application Current October 8, 9:30 AM USM Regional PeopleSoft Conference Cumberland,
University of Southern California Enterprise Wide Information Systems Instructor: Richard W. Vawter.
 SAP AG CSU Chico Working with IMG Copyright 1996, 1997, James R. Mensching, Gail Corbitt Contents of this file are for the exclusive use of the.
1 MAIS Student Administration Advisory Group and Central Office Upgrade Planning Group SAAG Meeting #33 April 4, 2007.
Microsoft Dynamics AX Technical Conference 2013
Best Practices for Supporting Oracle Hyperion EPM and Business Intelligence Solutions Mitra Veluri Senior Principal Technical Support Engineer David Valociek.
DBS to DBS i 5.0 Environment Strategy. Agenda Recommended Reference Information Roles & Responsibilities Environment Activities by Phase o Pre-Planning.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Cisco Technical Support Presentation Using the Cisco Technical Support.
© copyright 2014 BMC Software, Inc. DevOps consultant Niek Bartholomeus Going DevOps with BMC.
National Finance Center’s 2008 Customer Forum EmpowHR 9.0 Billy Dantagnan Teracore.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Effective Methods for Software and Systems Integration
Coppin State College PeopleSoft Architecture: Installing & Configuring Or “What I wish I knew a year ago!”
DBSi 5.0 Deployment Overview
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
PeopleSoft Proprietary and Confidential, Copyright 2004 PeopleSoft, Inc. For Internal Use Only, Do not distribute outside of PeopleSoft. Campus Solutions.
Systems Development Dr. Ashok Agarwal.
Overview  Established in 2005, Chennai India  Began US operations in 2012, Austin, TX and Chicago, IL  ISO 9001:2008 Certified and gearing towards.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Software License Agreement Negotiation 101 Ray Hsu, C.P.M. Assistant Director, Procurement Services University of Washington.
Roles and Responsibilities
THE PROTOTYPING MODEL The prototyping model begins with requirements gathering. Developer and customer meet and define the overall objectives for the software.
DBS to DBSi 5.0 Environment Strategy Quinn March 22, 2011.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Software Testing Life Cycle
Oracle Open World 2014 Integrating PeopleSoft for Seamless IT Service Delivery: Tips from UCF 1 Robert Yanckello, Chief Technology Officer University of.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Pass SOX security audits and Improve XA security CISTECH Security Solutions Belinda Daub, Senior Consultant Technical Services
Presented and hosted by Smooth Sailing: How to Upgrade Sage 300.
End HomeWelcome! The Software Development Process.
Sept. 21, 2014 Peoplesoft 9.0 Campus Solutions Features and Enhancements Bundle #38 Kickoff Webinar Thursday, September 3, 2pm.
Business Intelligence Appliance Powerful pay as you grow BI solutions with Engineered Systems.
Linux Panel Panel Moderator: Sandra Vucinic. Panel Members Michael Brown - Glen Raven, Inc. Mark Farnham - Rightsizing, Inc. Rich Niemiec – TUSC Sandra.
UpgradeX and CloudSuite What you need to know. WHY?
1. S318417: OAUG SysAdmin SIG Angelo Rosado, Oracle Senior Product Manager Kenneth Baxter, Oracle Strategy Product Manager Biju Mohan, Oracle Principal.
©2002 B&R Software Technology - Automation Studio.
Business Continuity Planning with Strohl Systems Software (800)
© 2010 VMware Inc. All rights reserved vSphere 4.1: Install, Configure, Manage.
Coppin State College PeopleSoft 8.x Architecture: Installing & Configuring Or “What I wish I knew a year ago!”
Implementing SiteManager in a non-P/L/C State Dawn E. Scheel, P.E. TxDOT.
Coppin State University Enterprise Portal – Lessons Learned / Demonstration November 11, 8:30 a.m. USM Regional Conference Towson, Maryland.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
Software Maintenance Speaker: Jerry Gao Ph.D. San Jose State University URL: Sept., 2001.
Upgrading from r4.1.4 to r7: Making a Smooth Transition Roger Suttmeier Support Distribution Manager June 14, 2006.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for IP Routing.
T Project Review Muuntaja I1 Iteration
1 © 2004 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Cisco Technical Support Seminar Using the Cisco Technical Support Website.
T Project Review Sotanorsu I2 Iteration
Enterprise Resource Planning - PeopleSoft. An ERP system is a business support system that maintains in a single database the data needed for a variety.
De Rigueur - Adding Process to Your Business Analytics Environment Diane Hatcher, SAS Institute Inc, Cary, NC Falko Schulz, SAS Institute Australia., Brisbane,
1 Presented by: Val Pennell, Test Tool Manager Date: March 9, 2004 Software Testing Tools – Load Testing.
Microsoft Dynamics Sure Step Rana Abdul Rahman. What we will cover What is Sure Step? Benefits of Sure Step methodology Project phases as per sure step.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
People Inc. from P&A Software
WFS Wesleyan Financial System
Skills/Competencies :
Dynamics GP – You Own It … Why Not Use It
InGenius Connector Enterprise Microsoft Dynamics CRM
Project Management Information and Tracking Advanced Concepts
Klopotek is transitioning to a Global Organization
People Inc. from P&A Software
Centura Health Lawson 8 Upgrade
UpgradeX and CloudSuite
Presentation transcript:

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. Upgrading PeopleSoft HR & SA to Version 8.9 USM Regional PeopleSoft Conference June 10, 2005 Jill Palla & Louis LeClerc, The Cedar Group

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 2 Agenda  Hardware Requirements  Installation & Certification  Functional Upgrade  What is new in 8.9?  Main Tasks  Technical Upgrade  What is new in 8.9?  Main Tasks  Preparing for Go-Live  Combined vs Separate  Project Management  Q&A

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 3 Hardware  Sizing  HRCS 8.9 SYS Database size  Your current production database size  Number of environments required for the upgrade project  Requirements  All hardware, OS, rDBMS, 3 rd party software, LDAP supported?  Most likely the supported HW/SW components listed above will require separate environments and/or machines to support the installation

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 4 Installation & Certification  Self-install or PeopleSoft install?  Make sure you will be supported  Is your environment ready for an install?  HRCS 8.9 vs HRCS 8.9 MP1 “re-install”  Environment naming conflicts  Licensing & license codes for HR vs SA modules, more specifically with self-service modules

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 5 Functional Upgrade – What is new in 8.9?  Navigation  Security  Core Person model  Module Specific Functionality  CC: Core Person, search/match, LDAP  AD: Test loads, prospect load  SR: Self-service, open activation  AA: Self-service  SF: Self-service, equation engine, credit history  FA: enhanced packaging, enhanced FFELP  CR: search/match, work experience

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 6 Functional Upgrade – What is new in 8.9?  Examples of 8.9 changes  Real time demo

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 7 Functional Upgrade – Main Tasks  Identify functionality coverage/review customizations  Fit/Gap or upgrade “IDP”  The old “phase II” functionality that never made it in prod…  Redesign/adapt security  End-user training & training documentation  Business process guides  Paper forms and other documents  Consider data archiving  Conduct integrated/full/system test – prepare scripts

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 8 Technical Upgrade – What is new in 8.9?  Componentization  Core Person model – Service-Oriented Architecture  Setup Manager  Performance Monitor  RIP 2-tier navigation  Folders instead of Menus for security  Automated patches & fixes

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 9 Technical Upgrade – Main Tasks  Customization Documentation (got doc?)  Compare process (technical fit/gap)  Technical review of (core person effects):  Customizations  Interfaces (specifically test loads)  Reports  Direct links or interface to 3 rd party systems  Develop & Unit test any changes  Attend necessary technical training  Develop the upgrade master plan

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 10 Preparing for Go-Live – The Master Plan  Upgrade process tested in series of iterations, no matter if using a lab or onsite approach  Goal: build a master checklist with timings of all tasks, functional & technical  All technical developments and functional setups must be tested with a complete set of upgraded data (not just DMO data or “generated” data  Security profiles mapped and/or upgraded  End-users, functional and technical team trained  Documentation up-to-date  Go/NoGo: Full system test completed with upgraded data

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 11 Combined or Separate?  HR8.3 => HRCS8.9  SA8.0 => HRCS8.9  Some HR setup has to be done even for plain SA  Combination considerations:  Licensing  UserIDs & EmplIDs  All other shared data (Dept & Misc CC tables)  Interfacing between HR and SA  Performance & sizing  Upgrade timing, patches & fixes timing

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 12 Project Management  Resource Planning  Technical Upgrade Team  Functional Upgrade Team  Development Team  HW/SW/OS/Network/etc Support Team  Academic Calendar Considerations  Application Support Schedule  Community Outreach  Communications  Training

Copyright 2005 – Cedar Enterprise Solutions, Inc. All rights reserved. 13 Question & Answer Upgrading PeopleSoft HR & SA to Version 8.9 USM Regional PeopleSoft Conference June 10, 2005 Jill Palla & Louis LeClerc, The Cedar Group