Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/2006 1 Advanced VIRGO Input optics LIGO-G070361-00-Z.

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
CNMFrascati 12/01/061 High Power Laser System for Advanced Virgo C.N.Man Design goals Present technology Other activities in the world Virgo+ and Laser.
High Power Input Optics for Advanced Virgo Julien Marque, Benjamin Canuel, Richard Day, Eric Génin, Flavio Nocera, Federico Paoletti The European Gravitational.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Optical simulation – March 04 1 Optical Simulation François BONDU VIRGO Tools Goals Example: tuning of modulation frequency A few questions.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Measurement of the laser beam profile at PSL to Mode Cleaner interface for the 40 Meter Prototype Interferometer A table of contents 1. Introduction 1.1.
Stefan Hild, Andreas Freise, Simon Chelkowski University of Birmingham Roland Schilling, Jerome Degallaix AEI Hannover Maddalena Mantovani EGO, Cascina.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Plans for Advanced Virgo
ILIAS WG1 meeting, 19/06/07 IB Faraday Isolator 1 IB in vacuum Faraday isolator E. Genin, S. Hebri, S. Hamdani, P. La Penna, J. Marque EGO.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
LIGO-G Advanced LIGO Detector upgrade is planned for »Factor of 10 increase in distance probed (‘reach’) »Factor of 1000 increase in event.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
Paolo La Penna The New Virgo Injection BenchN5-WP1 4 TH MEETING, Hannover, 7/04/2005 The New VIRGO Injection Bench Paolo La Penna European Gravitational.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
LSC-VIRGO joint meeting - Pisa1 Input mirrors thermal lensing effect Frequency modulation PRCL length in Virgo Some results from a Finesse simulation.
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
LIGO-G R High power optical components for Enhanced and Advanced LIGO Optics/Lasers WG, March 21, 2007 Volker Quetschke, Muzammil Arain, Rodica.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 eLIGO Input Optics Characterization and Performance Kate Dooley University of Florida.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G M LIGO R&D1 Initial LIGO upgrade to 30 W: Implication for the Input Optics UFLIGO Group.
AdV Thermal Compensation System Viviana Fafone AdV/aLIGO joint technical meeting, February 4, 2004.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
LIGO-G Z High Power Components for Advanced LIGO University of Florida Rupal Amin, Joe Gleason, Rachel Parks Christina Leidel, Mike Marquez, Luke.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.
THE INPUT OPTICS OF ENHANCED AND ADVANCED LIGO D.B. Tanner, M.A. Arain, A. Lucianetti, R.M. Martin, V. Quetschke, L.F. Williams, Wan Wu, G. Mueller, and.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
Advanced Advanced Virgo BASELINE DESIGN advanced Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration.
The VIRGO detection system
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
High power fibered optical components for gravitational waves detector Matthieu Gosselin, PhD Student at EGO ELiTES : 3 rd general meeting February 10.
G Z 1 eLIGO/advLIGO FI update Antonio Lucianetti, K.L. Dooley, R. Martin, L. F. Williams, M.A. Arain, V. Quetschke, G. Mueller, D.B. Tanner, and.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Laser Adaptive Optics for Advanced LIGO
INJ ASPERA Technology Forum 21/10/ High power optics for the AdV INJ system Benjamin Canuel European Gravitational Observatory.
Advanced Virgo INJ: Faraday isolator, Electro-optical modulator, high power beam dump and Input mode-cleaner E. Genin for AdV INJ team European Gravitational.
The Proposed Holographic Noise Experiment
Outline ideas/status K.A. Strain
The LIGO input optics D.B. Tanner, M.A. Arain, A. Lucianetti, R. Martin, V. Quetschke, L.F. Williams, Wan Wu, G. Mueller, and D.H. Reitze University.
Evolution of the Virgo detector: The Virgo+ plans
Design of Stable Power-Recycling Cavities
Virgo – Injection SYStem
R&D Highlights Seismic Isolation Suspensions ISC/40m
The views of Virgo collaboration groups on upgraded/advanced Virgo
Presentation transcript:

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ The Advanced Virgo injection system l Advanced VIRGO: in 2011 VIRGO should be ready to be upgraded to a detector with about 200 W input power l 200 W Laser source: two options are open (see Nary’s talk):  Solid State Laser source (SSL)  Fibre Laser (FL) source l The layout of the optics downstream of the laser has not been decided. Open options are:  In-air elements (Faraday, EOM, mirrors, waveplates, polarizers, …)  Suspended resonant input mode cleaner  In vacuum suspended optics (Faraday, polarizers)  Matching telescope  Photonic fibre input mode cleaner  Integrated fibre elements In any case: components withstanding 200 W

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Standard solution (LIGO) 200 W SSL LASER IN AIR HP INPUT OPTICS RESONANT SUSPENDED INPUT MODE CLEANER SUSPENDED OPTICS (FI) AND INPUT TELESCOPE EOM FIFI

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Possible fibre alternative Possible fibre solution :  Fibre integrated components (EOM, FI, …)  Fibre IMC  In vacuum Faraday isolator  Matching telescope

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ All fibre solution 200 W FIBRE LASER HP INTEGRATED FIBRE INPUT OPTICS PHOTONIC FIBRE INPUT MODE CLEANER SUSPENDED OPTICS AND INPUT TELESCOPE FI EOM FI

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Present advanced VIRGO reference solution LIGO :  Solid State Laser source  In-air components  Suspended resonant IMC  In vacuum Faraday isolator and suspended optics  Matching telescope  Lots of R&D already done

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ VIRGO present activity l A program for developing High Power Input Optical components has been funded (February 2007): l All what is necessary for setting up the HP power source is being purchased:  HP Ytterbium laser (IPG 200 W)  Optics  Beam analyser  Detectors  Cavities  Clean air, beam dumps  Vacuum chamber  … l First tests:  Tests on DKDP samples could start in Fall Simulation and tests of thermal effects in Faraday isolators are being performed (see Slim’s talk)  Even if Advanced VIRGO polarizers reference solution is likely calcite, tests on Brewster polarizers (General Optics substrates and Lyon coatings) for VIRGO+ will start in fall 2007

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ HP- IO components for Advanced Virgo SINGLE MODE PROBE HP PUMP /2 /2 POL HP power meter Phd BeamAnalyser CCD Test cavity ACQUISITION BeamAnalyser Phd

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ HP- IO components for Advanced Virgo SINGLE MODE PROBE HP PUMP /2 /2 POL HP power meter Phd BeamAnalyser CCD Test cavity ACQUISITION BeamAnalyser Phd /2 /2 EOM

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ EOM l In VIRGO+ EOM made of KTP crystal will be used  Same as present VIRGO  Thermal focal length (about 30 m) corrected by the in air tuning telescope l Reference solution: Advanced LIGO EOM:  RTP EOM crystal: –About 10 times lower absorption (0.005 m -1 vs 0.05 m -1 ) –Lower dn z /dT –Higher damage threshold –wedged (about 3°) EOM crystals l We will in any case perform tests on KTP EOM (already for VIRGO+)

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ HP- IO components for Advanced Virgo SINGLE MODE PROBE HP PUMP /2 /2 POL HP power meter Phd BeamAnalyser CCD Test cavity ACQUISITION BeamAnalyser Phd /2 /2 DKDP Faraday

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Faraday isolator l An in-vacuum Faraday isolator will be used even with a fibre IMC l Good experience already acquired in Virgo:  Thermal lensing  Thermal effects on isolation l Many things understood ad a lot of simulation performed l Results can be compared with those of LIGO l Ready to start soon high power in-vacuum tests (Slim’s talk) l Reference solution for Advanced Virgo: Advanced LIGO Faraday Isolator

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Fibre solution Fibred components: (like integrated fibred EOM, FI) Apparently more advantageous: l Reliability l Alignment l Neither acoustic nor seismic noise l High power l Telecom tested solutions l Easily integrated with a fibred input mode cleaner l … But : l More experience needed soon l Very short time to make high power tests

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Possible adaptation for HP-IO fibred components SINGLE MODE PROBE HP PUMP /2 /2 POL HP power meter Phd BeamAnalyser CCD Test cavity ACQUISITION BeamAnalyser Phd Fibredcomponents

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Working program Start requirements computation (EOM, IMC, telescopes, stabilization, …) Start simulation and design of a possible resonant IMC Start simulation and design of a possible matching telescope Take advantage from LIGO R&D Perform our own R&D and develope experience At the same time we need:

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Input Optics (Faraday, EOM, Polarizers, …) Requirements:  Faraday (in air and in vacuum) –Level of power impinging on them –Level of optical isolation –Insertion loss allowed –Beam distorsion allowed –Compensation (lensing, isolation)  EOM: –Minimum modulation depth –Stability of sidebands –Level of power impinging on them  Polarizers, mirrors, splitters (scattering issues)  How things will change depending on the choices for the ITF (for example if there will be DC detection).

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Input Mode Cleaner Requirements: Which are the different options open  Suspended  Fibre In case of suspended IMC:  Length, Finesse, transmission, use of dihedron  Frequency pole for HF noise  Scattered light on the mirrors and on their support,  Seismic isolation of the mirrors  Filtering

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Input/output telescopes Requirements: l Which are the different options:  Long, short  Standard lenses  Parabolic, off-axis  Adaptive matching l Stability, Matching, Insertion loss by aberrations l Seismic isolation l Scattering: maximum reflection by AR coatings l Depending on:  Different possible IMC  ITF configuation

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ What is being done  In-air HP-IO components: Activity started: EGO, Pisa, Naples  In vacuum suspended optics: Activity started: EGO, Pisa, Naples  Integrated fibre elements: To be decided: Possible within the EGO, Pisa, Naples R&D (coordinated with NIce activity)  Suspended resonant IMC: Very little action taken  Matching telescopeNo action taken

Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ WG2 involved people l 21 People included in the WG2 mailing list l Work effectively performed by only a few of them l All of them are also involved in the Virgo Commissioning and/or in the Virgo+ ugrades l More collaboration with WG1 is needed: very important for defining requirements l Injection system configuration: not yet assessed l Manpower, at least up to now, is not sufficient l After the start of the Science Run more time/people will be available