Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.

Slides:



Advertisements
Similar presentations
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Advertisements

Helen Bowden Nurses Home “Jewel of Granger Bay” PROVINCIAL REGENERATION PROGRAMME INVESTOR CONFERENCE 26 March 2014.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
Planning Legislation – Prof. H. Alshuwaikhat ZONING Zoning is the division of a municipality, city or town into districts for the purpose of regulating.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.
November 7, 2013 Open House Manitoba Municipalities Modernization Act RM of Daly & Town of Rivers.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.
Development Contributions Planning Agreements Environmental Planning and Assessment Act 1979 Part 4, Division 6, Subdivision 2 lindsaytaylorlawyers Level.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Morphum Environmental Ltd Environmental Engineers and Consultants
September 2005Urban Planning Carleton University 1 Zoning By-Laws & Land Subdivision Official plan of a city provides the basis for: –Planning public facilities.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
MUS pilot project in Honduras Testing guidelines for planning and implementation of multiple use services.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Rental Housing Response to the Recommendations of the FFC on Rental Housing National Department of Housing 7 August 2009.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
Tshepo Makhanye Information Section: Research Unit.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
Eagle Heights Development Proposal Consists of two sets of development applications and two property ownerships: Paletta and Taylor lands. Paletta is applicant.
Corby North Eastern Sustainable Urban Extension. Corby North Eastern SUE Comprises 1.Priors Hall (Bela Partnership) 2.Weldon Park (Charles Church/Persimmon.
Surplus City Property – Request for Proposals Administration & Finance Committee February 1, 2012.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
MONDAY 2 DECEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
Moloto Road (R573) Safety Investigations
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Architectural Drafting
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Official Plan and Zoning By-law Amendment Application
PRELIMINARY DRAFT not for circulation
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Presentation transcript:

Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing plan for SIZAKELE 400

Feasibility and Review of Housing Plan SIZAKELE 400 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel: Fax: Kantey & Templer PO Box Beacon Bay, 5205 Tel: IQ Vision 110 Sarel Cillier Street Strand 7140 Tel: EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) NXUBA LOCAL MUNICIPALITY Private Bag X350, Adelaide, 5760 Tel: (046) Fax: (046)

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9Future Plans of Other Sector Departments 2.10Approval by Council 2.11Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Extent of General Plan Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1 Ownership Annexure 2Title Deed Annexure 3Surveyor General diagram

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment FLISPFinance Linked Individual Subsidy Program GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Sizakele 400 as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of ten Human Settlement Project feasibility reports for Nxuba Municipality. It is designed so that it can be part of a single document that includes the other nine projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner:Nxuba Municipality Property Description: Portion of RE/477, Nyarha Title Deed Number:T3659/1980 Servitudes: N/A Current Zoning:To follow Site Size:7.81 Ha The Sizakele 400 project site will be part of the suburb called Nyarha in Bedford within Nxuba municipality, south of the R63, see figure and According to Census 2011 data, a small number of 598 people reside on the land identified as the HSP site. Bedford is approximately 22.8kms from its nearest neighbour Adelaide. Access to the site is gained by turning into Ntlana Street off the R63 Bedford Town from Plasket / Phantse Street. It mainly comprises of dwellings of varying quality on vacant land next to the existing Tyoksville and Ndlovini settlements, see figure Visual Survey. These dwellings are mostly laid out on a grid pattern with basic water and electrical services. Future residential expansion has been identified by the SDF on this site. Including neighbouring Ndlovini, the SDF identified a total area of Ha for residential use, see figure

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 9 Locality Plan Figure 2.1.1

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 10 Aerial Photograph Figure 2.1.2

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 11 VISUAL SURVEY Figure a. Plot containing informal dwelling with a tank for rainwater harvesting and vegetable garden. b. Building materials in preparation to build an informal structure.c. Dwelling and plot belonging to typical human settlement subsidy beneficiary alongside Malime Street in Sizakele. d. Unsurveyed, open space in Sizakele.e. View along Malime Strreet showing site with gentle, well-drained slope from south to north. f. Land under threat by informal settlement in Sizakele.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 12

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 13 STATUS OF HOUSING PROJECTS AND WAITING LISTS 2.2 A project of 400 subsidies has been proposed for Sizakele. The proposed project’s delivery strategy and housing instrument is project linked housing subsidies onto an existing informal settlement. The waiting lists are awaited from the Department of Human Settlements. Therefore, the total beneficiaries are unknown until the waiting lists are verified. During the site visits on the 23 rd of October 2013, it was observed that the site has been serviced with basic services. SIZAKELE 400 Population (Nxuba SDF 2011)Not specified Population (2011 Census)598 No. Households (2011 Census)Not specified Proposed Subsidies (EC DHS)400 Waiting List (Nxuba LM)Awaiting Figure 2.2.1Statistical Background

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land on which the site is located is Erf RE/477, Nyarha. Some beneficiaries reside on this erf with no demarcated plots. The SG plan was approved in Enquiries with the Surveyor General reveal that the property is registered under title T3659/80 and is owned by Nxuba Municipality. This erf was identified in the SDF (2011) for residential expansion, see section 2.8.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 15 Extent of General Plan Figure 2.3.1

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 16 ENGINEERING (Kantey and Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING Await K&T TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 17 Engineering (Kantey and Templer) Figure Await K&T

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 18 ENVIRONMENT 2.5 The site is an invaded property with existing gravel roads and buildings. The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. The site falls within CBA 2 as per SANBI data (2007) and therefore is subject to BLMC 2 guidelines according to the ECBCP. BLMC 2 permits the land to be used for Conservation, Game Farming and Communal Livestock. Settlements are not recommended for these areas, however this must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project. No cultivated land is on or around the site that my influence future development. Watercourses cross the western boundary of the site, therefore, floodlines need to be determined before development can take place. Housing development needs to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). Should the development require a buffer less than 32m, a basic assessment will be required for: –The expansion of: (i)jetties by more than 50 square metres; (ii)slipways by more than 50 square metres; or (iii)buildings by more than 50 square metres (iv)infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line. It appears that the layout to which the existing dwellings conform has been set back from the watercourse but floodlines need to be determined as they might affect the proposed Human Settlement Project.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 19 Environment Figure 2.5.1

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 20 GEO-TECH (Kantey and Templer) 2.6 Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas. Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. In terms of the geotechnical information available, the proposed housing projects appear. (Outeniqua Geotechnical Services cc, 2013 )

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 21 Geo-tech (Kantey and Templer) Figure The Site

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 There are two primary schools and one secondary school located north of the site which are within 1km walking distance. This means that these schools are within walking distance of the site, see figure There is one clinic north of the site in Nyarha which is within the 1km walking distance to the site. The site is within 2-3km of the main town of Bedford where more facilities are found, including a hospital. When social facilities are measured against the population threshold of the Bedford and Nyarha area, according to the 2011 SDF, the only facility that was needed was 1 police station. (Nxuba SDF 2011, pg 39) There is an appropriate level of social facilities within 0km walking distance from the site for the proposed number of residents who are already present in the existing informal settlement. Residents must travel to Bedford CBD, two kilometres away, in order to access higher order health, police and education facilities. No new social facilities are required to support the proposed human settlements project.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 23 Distribution of Social Facilities Figure 2.7.1

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 The 2011 Nxuba SDF makes the following proposals for Bedford: Future residential extension is proposed throughout Bedford, with bigger parcels of land identified around Goodwin Park and Nyarha (see figure 2.8.1). The proposed site for Sizakele No 40 was earmarked for residential expansion. The majority of the SDF’s residential expansion proposals are around the Goodwin Park area, Ha, and infill housing at Nyarha (including Sizakele at Ha). The proposed Human Settlement Project is in line with the SDF.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 25 Current Spatial Development Framework Figure (Source: Bedford SDF, Nxuba Spatial Development Framework, 2011) The Site

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 26 Future Plans of Other Sector Departments 2.9 The following table indicates future plans of other sector departments proposed in the various settlements as contained in the IDP Note : Projects may not be in the settlement itself, however if they were taking place within the same ward, they were noted. No budget was reflected in the IDP for some projects.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 27 APPROVAL BY COUNCIL 2.10 Await council resolution

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 28 SUMMARY AND RECOMMENDATIONS SUMMARY The site was inspected on 23/10/2013 and the conclusions below ground-truthed. The ownership of the land on which Sizakele is located is registered to Nxuba Municipality. A new general plan, erf diagram and title deeds will have to be prepared for the new extension. There are adequate engineering services according to the SDF. Floodlines may be a cause of concern for development on the proposed Human Settlement Project and if it is intended that development should be closer than 32 metres to the banks of a watercouse, then an EIA may be triggered. Using ECBCP guidelines in determining the BLMCs that apply to the CBA that covers the site, settlements are not recommended for the site. It is recommended that the site be assessed by a qualified Botanist to verify and ground-truth the CBA nature of the site prior to the Human Settlement Project implementation. A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. The project comprises of 400 housing subsidy units onto invaded, previously vacant land and plots next to abutting residential development to the west, north and south. The beneficiary list is still to be verified. No new social facilities are required to support the proposed human settlements project. The Human Settlement Project is in line with the SDF, as residential expansion is proposed for the site RECOMMENDATIONS The project is feasible, pending a technical assessment by a Botanist to verify the CBA nature of the site. In light of this assessment it is recommended that the award of subsidies houses can proceed.

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 29

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 30 ANNEXURE 1: OWNERSHIP PRINTOUT

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 31

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 32 ANNEXURE 2: TITLE DEED

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 33

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 34 ANNEXURE 3: SURVEYOR GENERAL DIAGRAM

SIZAKELE 400 FEASIBILITY STUDY CNdV africa (Pty) Ltd24 November 2015 page 35