Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.

Slides:



Advertisements
Similar presentations
MSW NESHAP Control Requirements Contains the same requirements as NSPS/EG. Requires gas collection and control system (GCCS) for same landfill as NSPS/EG.
Advertisements

National Emission Standards for Hazardous Air Pollutants: Municipal Solid Waste Landfills.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL COIL SURFACE MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART SSSS May 2006 May 2006.
METAL FURNITURE SURFACE COATING MACT QUESTION & ANSWERS 40 CFR PART 63, SUBPART RRRR July 2006.
Regulatory Drivers for Reducing Solvent Emissions Barbara Johnson, PE Kansas State University Kansas Small Business Environmental Assistance Program March.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Overview of the Clean Air Act and the Proposed Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards Public Outreach.
April 15, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
1 Year in Review: Clean Air Act Presented by: Tom Wood Stoel Rives LLP October 8, 2010 Things Are Getting Really Complicated.
When “My Bad” Means You’re Bad EPA’s Renewed Focus on “Excess Emissions” Steve McKinney Air and Waste Management Association 2007 Annual Meeting & Technical.
NCMA Workshop March 24, 2015 Booker Pullen Supervisor, Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919) Permitting.
Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Clean Air Act and Permits
Air Quality 101: Clean Air Act Overview/ Update. 2 Origins of the Clean Air Act Historic air pollution Donora, Pennsylvania, – PSD, tribes.
December 4, Utility MACT Air & Waste Management Association/EPA Information Exchange December 4, 2002 William H. Maxwell Combustion Group/ESD.
Managing Air Quality Data 101 Presented by: Chris Bellusci & Claire Lund, PE (Sanborn Head) International Conference for Environmental.
Air Quality Program Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 9/12/
NEW SOURCE REVIEW REFORM/SIMPLIFICATION JOHN A. PAUL STAPPA/ALAPCO MAY, 2002.
Where to find Information About Facilities. Overview of Title V Permits.
Indiana New Source Review Reform Plantwide Applicability Limitations (PALs) IDEM/Office of Air Quality September 7, 2004.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
Our Vision – Healthy Kansans living in safe and sustainable environments.
Air Quality 101 Kansas Air Quality Program overview.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
What Does a Tribal Air Program Look Like? James Payne Morongo Band of Mission Indians Environmental Department.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
Delivering sustainable solutions in a more competitive world 1 © COPYRIGHT 2010 ERM.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Blue Skies Delaware; Clean Air for Life NESHAPs Jim Snead October 8, 2008.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
Title V: The Big Picture
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
1 Air Enforcement Matt Haber Senior Advisor Office of Enforcement and Compliance Assurance.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
June 13, 2013 Joy Wiecks Fond du Lac Reservation 1.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
Clean Air Act SAFE 210. Purpose Protect public health and regulate air emissions Addresses both stationary and mobile sources.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
Current State Issues in Title V Permitting Matthew A. Paque Environmental Attorney Supervisor Oklahoma Department of Environmental Quality Office of General.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
Update on Methane Regulations Affecting Landfills Pat Sullivan Senior Vice President SCS Engineers Nov. 10, 2015.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
NSR—Minor New Source Review Darrel Harmon U.S. EPA Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
1 The Exceptional Events Rule (EER) Overview Tom Link EPA – OAQPS Geographic Strategies Group Westar Meeting, San Francisco, February 25, 2009.
Balancing the Three R’s: Regulations, Records, and Reports Dallas, TX ♦ May 18, 2016 Arron Heinerikson.
Developing a Tribal Implementation Plan
New Source As defined in the CAA, construction of a new source, or modification of an existing source, that will produce a significant increase in emissions.
New Source Review (NSR) Program Basics
Preparing for Permit Review
Clean Air Act Glossary.
What we’ll cover: How EPA enforces the Clean Air Act, including permits Roles for tribal governments in enforcing NSR permits.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Draft Modeling Protocol for PM2.5
The Clean Air Act By Jessi Walker Per 2.
What we’ll cover: How EPA enforces the Clean Air Act, including permits Roles for tribal governments in enforcing NSR permits.
Overview of New Source Review (NSR)
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Major New Source Review (NSR)—Part 1
Presentation transcript:

Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS

2 Region 9 Title V Permit Review Guidelines Key document in your “library”: “Title V Permit Review Guidelines” developed by EPA Region 9 Topics here correspond to many sections in Guidelines Learning concepts gives basic understanding of what a permit should contain A little encouragement You can do this! Permit review can be done even by non- technical people. It requires attention to detail, a focus on language and perseverance!

3 Outline What permit should contain Applicable requirements Permit conditions Practical Enforceability Monitoring Startup, shutdowns, malfunctions

4 How to Think About Permit Review Permit links emission unit with “applicable requirement” under Clean Air Act Your job as reviewer is to ensure permit includes correct requirements and does not exclude any that apply

5 How to Think about Permit Review Prioritize review. Focus on – Units with highest emissions – Units with highly toxic pollutants – Units with history of noncompliance – Units with high number of startup, shutdown, malfunction (SSM) reports – Units with air pollution control devices

6 What Permit Should Contain All applicable requirements – Examples: state and federal rules, state permit terms Standard permit conditions required by part 70 – Examples: permit expires after 5 years, duty to provide information Practically enforceable language – Examples: requirements to keep records, eliminating vague permit conditions

7 What Permit Should Contain (cont.) Source-specific monitoring, where needed – Example: testing or recordkeeping to show compliance with emission limits or work practice standards Reporting and recordkeeping – Example: Reports of excess emissions Schedule of compliance, if source is out of compliance Origin and authority citation

8 Introduction: Applicable Requirements Applicable requirements are CAA requirements that apply to Title V source – Include regulations issued before permit but with future compliance dates Three broad types: – State Implementation Plan (SIP) – New source review (NSR) permits – Federal requirements: NSPS, MACT, NESHAPs

9 Introduction: Applicable Requirements (cont.) State implementation plans (SIP) contain rules adopted by state and approved by EPA. Look for rules in “approved SIP” New source review (NSR) permits. All past NSR, PSD, state construction permits issued to facility are applicable requirements

10 Introduction: Applicable Requirements (cont.) New Source Performance Standards (NSPS). Apply only to new sources in specific categories that were constructed after the date specified in the rule. Listed in 40 CFR Part 60. – E.g., Subpart J – Standards for Petroleum Refineries National Emission Standards for Hazardous Air Pollutants (NESHAPs). Pre-1990 standards listed in Part 61. Post-1990 standards listed in Part 63. – E.g., Subpart CC – MACT for HAPs from Petroleum Refineries

11 Introduction: Applicable Requirements (cont.) Other applicable requirements – Compliance assurance monitoring (CAM) – Acid rain rules for “affected” utilities – Some rules requiring phase-out of ozone- depleting refrigerants Requirements that are NOT applicable – National ambient air quality standards (NAAQS)

12 Why review applicable requirements? Sources don’t always know which requirements apply – In past, overlooked applicable NSPS or NSR requirements – Have incorrectly suggested units are exempt from CAM State permits sometimes exclude requirements or include incorrect requirements (e.g., requirements not approved by EPA Correctly stating requirement necessary to know if additional monitoring required

13 How to Know If a Requirement Is “Applicable?” Look for applicability section describing types of units to which rule applies. In NSPS and NESHAPs, usually first section in rule Often, only certain types of emission units are covered (e.g., “affected facilities”) Most rules apply to sources in certain categories, (e.g., electric generating units, petroleum refining, municipal waste combustors, other)

14 How to Know If a Requirement Is “Applicable?” (cont.) NSPS rules apply only after specific dates (e.g., constructed or modified after May 4, 1987) Many NESHAP rules apply only to “major” sources in a specific category (e.g., major source engaged in petroleum refining)

15 How to Determine If a Source Is “Major” Based on a source’s potential to emit (PTE) – Include all emissions at facility – Assume plant operates at full capacity, 8760 hours/year, unless restricted by enforceable operating limit

16 How to Determine If a Source Is “Major” (cont.) Major source of HAPS has PTE of – 10 tons/year for a single HAP, or – 25 tons/year for any combination of HAPs Also, any source with a PTE of 100 tons/year of any pollutant is “major” VOC, NOx and CO have smaller thresholds in certain nonattainment areas

17 Basic Information Sources Air pollution control training courses on the web – Approved SIP requirements on the web – See each EPA regional website. Region 5’s site Federal rules (NSPS, NESHAPs) EPA OAQPS Permits site

18 Reviewing State Implementation Plans Check that permit term references approved SIP If permit includes sunset/sunrise clause, check that new rule assures compliance For more information, see page III-6 and III-7

19 Reviewing New Source Performance Standards in the Permit Check cites of NSPS rules Permit should provide enough information to justify exemptions from an NSPS Permit should address whether unit has been modified Permit should include correct monitoring requirements For more information, see page III-11 to III-14

20 Reviewing NESHAP Standards Check applicability of potential NESHAPs Permit should provide enough information to justify exemptions from a NESHAP Permit should address whether unit has been modified Permit should include correct monitoring requirements For more information, see page III-15 to III-16

21 Reviewing New Source Review Permit Terms Three versions of permits issued by states – Prevention of Significant Deterioration (PSD) in attainment areas – Major New Source Review (NSR) in nonattainment areas – State preconstruction permits to all other sources In some areas, EPA issues PSD permits All NSR permits must be included in Title V permit, regardless of when NSR permit was issued For details, see p. III-21 to III-27

22 Small-Group Activity – Applicable Requirements A permit for a pulp mill references the NSPS, Subpart BB for Kraft Pulp Mills Where would you find this requirement? How would you determine if it applies to the facility?

23 Practical Enforceability Objective: allow inspector to determine compliance To be practically enforceable, permit terms should – Establish a clear legal obligation for source – Allow compliance to be verified through data such as records or reports This is not highly technical! See p. III-45 to III-53

24 Practical Enforceability (cont.) Look for – Short-term emission limits (30 days or monthly rolling averages) – Requirement to keep records and submit reports to verify compliance with limits on operating hours or throughputs Examples – “emit less than 49 tons/year on a rolling monthly average” instead of “annual average of 49 tons/year” – “keep records of monthly throughput” instead of no record-keeping requirement

25 Monitoring Permit must add monitoring where monitoring in underlying requirement – Is wholly absent – Is only a one-time stack test, or – Does not specify requency Otherwise, permit cannot add monitoring, even if underlying monitoring could be improved

26 Monitoring (cont.) Monitoring is important because – Often the only way to determine if unit is in compliance or if control device is operating improperly – Many older requirements have little or no monitoring – An area in which permitting agency has discretion to improve existing monitoring

27 Monitoring (cont.) Examples of requirements that may lack monitoring – Older NSPS or SIP requirements that require no monitoring or one-time testing – NSR permits Where to get ideas on improving monitoring – For control devices: CAM reference material – For uncontrolled units: Title V technical reference document at same website, Region 9 guidelines or state periodic-monitoring guidance documents

28 Cautions when using Region 9 Guidelines for Monitoring Do not cite to 1999 EPA Periodic Monitoring Guidance. Struck down by DC Circuit Instead, cite state’s periodic monitoring guidance, if available, or part 70’s periodic monitoring rule [section 70.6(a)(3)(i)(B)]. See p. III-75 to III-87

29 Startup, Shutdown, Malfunctions (SSMs) SSM rules exist in SIPs, NSPS and NESHAP rules Many regulations do not require compliance with emission limit during SSM event Excess emissions during SSM events can be huge if they occur repeatedly or are allowed to continue unabated

30 Concerns with SSMs Emissions during upsets and SSM may release toxic and carcinogenic chemicals that community health and safety Exemptions in regulation and lack of reporting allow upset and SSM emissions to be kept off books and to exceed permit and regulatory limits Excess emissions due to upsets and SSM are largely avoidable

31 Review of SSMs Check plant’s history, look for – Recurring malfunctions (preventable and foreseeable). – Reports of SSM events, what caused them, and how long it took to correct problem If problem exists, request that permit add monitoring of SSM events to ensure malfunctions are caused only by “sudden, unavoidable breakdowns of technology, beyond the control of the owner or operator” and not – Malfunctions due to human error – Undersized or poorly maintained control equipment

32 Review of Major Points How to think about permit review Applicable requirements: SIPs, NSPS, NESHAPs, NSR permits – How to determine if they apply – How to know if a source is “major” Practical enforceability Monitoring Startup, shutdown, malfunctions (SSMs)

33 Permit Review: You can Do it! You decide how technical to make your review – much of it can be non-technical Many resources are available You don’t need to find and fix all problems Anything you can do to offer constructive comment is success!

Thank you… …and good luck!