US NAVY CIVIL ENGINEER CORPS OVERVIEW LTJG Joshua Sharp 19 January 2012
NF MARIANAS 2 What Is Today’s Navy Civil Engineer Doing? Expeditionary / Facilities Rotation –Expeditionary Construction Platoon Commander, Naval Mobile Construction Battalion 5 –Construction Management Assistant Resident Officer in Charge of Construction, Guam Naval Hospital Replacement Project –Public Works Assistant Public Works Officer, Naval Base Guam
NF MARIANAS 3 Guam Naval Hospital Replacement FACILITY IMPROVEMENTS Full diagnostic capability w/ MRI Efficient patient staff circulation patterns High traffic clinics located near the main entrance and circulation spines AWARD INFORMATION Design – Bid – Build Award amount $158M Designer: Sherlock Smith and Adams (SS&A): Montgomery, AL Contractor: Watts Webcor and Obayashi a JV (WWO): Honolulu, HI LEED SILVER $1.2M in energy savings. Rainwater used as non-potable water saving 1.4 MG/yr. 823 KG/yr reduction in potable water use.
NF MARIANAS 4 Project Overview PHASE I - Construct New Hospital ECD: JUL 2013 PHASE II - Demolish Old Hospital ECD: OCT 2014
NF MARIANAS 5 Questions?