Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
BPM Upgrade Presented by: Nadine Kurita Contributors: S. Smith, S. Ecklund, J. Sebek, D. Martin, R. Hettel, R. Johnson, N. Reeck, M. Kosovsky, D. Arnett.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
12/13/2004 SN PEP-II MAC REVIEW 1 of 49 RECENT HOM CALCULATIONS HOM Dampers: Last Measurements and New Computer Designs Sasha Novokhatski PEP-II MAC Review.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Radial Ion Pump, BPMs, & HOM Bellows Machine Advisory Committee Meeting December 14, 2004 Nadine Kurita Machine Advisory Committee Meeting December 14,
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
SR Vacuum Systems and Front Ends
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
PEP-II Vacuum p1 New HER IR Vacuum Chambers Machine Advisory Committee Meeting December 14, 2004 Presented by Rodd Pope Machine Advisory Committee Meeting.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
XFEL beamline loads and HOM coupler for CW
Design Fabrication and Processing Group H. Padamsee
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Vacuum System Failures at HERA
CEPC Vacuum System Dong Haiyi 2017/11/5.
The PEP-II Interaction e+e- Factories Workshop
Challenges for FCC-ee MDI mechanical design
PEP-II Status and Plans e+e- Factories Workshop
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
EIC Accelerator Collaboration Meeting
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk, M. Kosovsky, N. Kurita, R. Pope, N. Reeck, A. Sheng, B. Smith

Interaction Region Vacuum Chamber Upgrades p.2 of 25 Outline m Forward Q2 Chamber m Q1/Q2 HOM Bellows m HER Q4 & Q5 Vacuum Chambers; HOM Absorbing Bellows m LER Q4 R Temporary Chamber m LER Q4 & Q5 Vacuum Chambers m DS-7 Transition m LER 2062 Chamber m LER 2143 Collimator m Interaction Region HOM Absorbers m Additional Diagnostics m HOM Straight Bellows

Interaction Region Vacuum Chamber Upgrades p.3 of 25 m Replaced Q2R with a Q2L chamber in 2002  Improve Beam Stay-Clear and reduce HOM generation (see mask at right)  Chamber failed (following operation) due to material flaw in the GlidCop m Original Q2R chamber reinstalled in 2003  Does not maintain Beam Stay-Clear  No evidence that it creates increased HOMs m New Q2R installed March 2006  Opportunistic installation in conjunction with Q1/Q2 bellows seal  Still no effect on HOM generation observed Forward Q2 Chamber

Interaction Region Vacuum Chamber Upgrades p.4 of 25 m Identified as a critical upgrade at previous review m Technically very challenging  Limited space available  Anticipated high power loads m Design compromises travel during installation to accommodate new HOM absorption arrangement m 61 mm maximum tile/slot length m Absorbing tiles are open to the convolutions  No additional tile set needed in bellows cavity m HER Arc Bellows features  Spring, Stub, RF shield m (See M. Sullivan talk) Q1/Q2 HOM Bellows

Interaction Region Vacuum Chamber Upgrades p.5 of 25 Q1/Q2 HOM Bellows m RF Seals replaced 22 February 2006 (see M. Sullivan talk) Installed design New stub in fabrication Materials in hand (AlN-SiC tiles, GlidCop, bellows) Working aggressively to complete new bellows modules Hope to install during current shutdown

Interaction Region Vacuum Chamber Upgrades p.6 of 25 HER Q4 & Q5 Chambers m HER Q5 & Q4 Chambers  General issues  Mechanical & HOM failures in the NEG screens  Beam Stay-Clear (BSC) & Luminosity cone restrictions  Thermal motion of magnets l Original Q4 & Q5 are rigid chambers that have minimal to no clearance to their respective magnets  Global alignment errors between the 10-meter Collimator and Q5 L and between Q5 R and High Power Dump.  History of mask and flange failures due to SR heating  NEG heating during high current operation

Interaction Region Vacuum Chamber Upgrades p.7 of 25 m Design goals (achieved)  LER: 4.5A, HER 2.2 A operation  Respect the defined BSC/Luminosity cone and existing magnet envelopes.  Maintained a 2mm gap to poles and a 3mm gap to coils  Reduce operating thermal gradients  Improve kinematics and stabilize BPMs  Added a bellows between Q4, Q5  Added a flex flange between Q2L & Q4L  Replaced beampipe supports  Decrease the RF leakage to the pumps  Screen hole diameter reduced to 3 mm and depth increased to 6mm HER Q4 & Q5 Chambers Q5 NEG RF Screen

Interaction Region Vacuum Chamber Upgrades p.8 of 25 HER Q4 & Q5 Chambers m HER Q5 L Chamber  Installed Fall 2005 m HER Q4 & Q5 R and HER Q4 L Chambers  Installed beginning in August 2006  Installation revealed vertical misalignment of ~9 mm at HER High Power Dump (corrected) Q5 L installation m Aluminum clamshell design  Profile matched to available space  Excellent assembly distortion control  Straightness in y-z (vertical) plane = +/-.030”  Straightness in x-z (horizontal) plane = +/-.011”  End to end roll = 9 mRad

Interaction Region Vacuum Chamber Upgrades p.9 of 25 Performance of Q5 L Chamber m HER Q5 L  Installed Fall 2005  Beam induced heating of NEG dramatically reduced HER Current (Mar 05-Aug 06) Temperature of Q5 L NEG (Mar 05-Aug 06)

Interaction Region Vacuum Chamber Upgrades p.10 of 25 Q4 side, 10” flange Q5 side 12” flange GlidCop Stub Inconel Spring Finger GlidCop RF Shield Finger Welded Bellows Cooling – not shown Absorbing Tile m Mechanically decouples Q4 & Q5 vacuum chambers m Absorbing tiles above and below beam orbit Q4/Q5 Bellows with Absorber

Interaction Region Vacuum Chamber Upgrades p.11 of 25 LER Q4 Right Temporary Chamber m LER Q4 R chamber replaced by a straight drift tube on 22 February 2006 m Concern that the chamber outgassing and/or sparking caused beam aborts (found to be not true).

Interaction Region Vacuum Chamber Upgrades p.12 of 25 LER Q4 & Q5 Chambers m Two major issues addressed in redesign  Beam induced NEG heating (leading to NEG outgassing)  Thermal motion of the Q2,4,5 raft/magnets m New design for LER Q4 & Q5  Improved RF screens  Added “Flex Flange” at chamber inboard ends  Improved mask cooling; also additional cooling added Old ScreenNew Screen “Flex Flange” detail

Interaction Region Vacuum Chamber Upgrades p.13 of 25 LER Q4 & Q5 Chambers m Status  Chamber fabrication and assembly complete  Q4 vacuum processing complete; Q5 chambers are on bake  Ready to begin installation of Q4 when project engineer returns on 26 October “Flex Flange” prior to final assembly

Interaction Region Vacuum Chamber Upgrades p.14 of 25 LER Q4 & Q5 Chambers m Status  Chamber fabrication and assembly complete.  Q4 vacuum processing complete; Q5 chambers are on bake.  Ready to begin installation of Q4 when project engineer returns on 26 October

Interaction Region Vacuum Chamber Upgrades p.15 of 25 DS-7 Octagonal-to-Round Transition m Chamber absorbs a large amount of LER SR originating near the IP ( A, 3.1 GeV) m Previous DS-7 chamber not well cooled m New chamber incorporates GlidCop body and improved cooling m Installed Nov 2005

Interaction Region Vacuum Chamber Upgrades p.16 of 25 LER 2062 Chamber m Vacuum leak developed on 10 Dec sealed temporarily. m LER 2062 chamber replaced 1 May 2006 m Buttons in nearby chambers fell on 2 & 5 May, prompting effort to remove LER Collimator m Repaired chamber reinstalled on 16 May chamber

Interaction Region Vacuum Chamber Upgrades p.17 of 25 LER 2143 Collimator m LER 2143 Collimator removed 16 May 2006  Intended to control backgrounds in BaBar  HOM generator affecting downstream LER  Damage to the collimating surface being evaluated

Interaction Region Vacuum Chamber Upgrades p.18 of 25 Interaction Region HOM Absorbers m High current running prompts a desire to manage HOM heating in the LER m Two HOM absorbing chambers to be added to the LER (3044 & 1153) m RF Shield 3.5 mm slots in 2.5 mm thick GlidCop Uses Ceralloy 13740Y (Aln-SiC) tiles Matches existing LER Octagonal cross section Install November 2006 Absorption (calculated by S. Novokhatski, S. Weathersby): Monopole – % Dipole – 54% Other Dipole – 88% Quadrupole – 89% Design selected for high absorption over a broad frequency range All absorption curves relatively flat – no major spikes or troughs

Interaction Region Vacuum Chamber Upgrades p.19 of 25 Interaction Region HOM Absorber (1153) HOM Absorber Octagonal to LER Arc Transition (New) Elliptical to Octagon Transition Octagonal Bellows e+e+ Octagonal to Elliptical Mask (New) Elliptical VAT Valve (reinstalled) Improved masking at 1153 location

Interaction Region Vacuum Chamber Upgrades p.20 of 25 Additional Diagnostics m Vacuum gauges added  9 additional hot filament gauges distributed through the Interaction Region  These gauges are less sensitive to non-vacuum beam effects

Interaction Region Vacuum Chamber Upgrades p.21 of 25 Additional Diagnostics m Fast(er) data sampling  SLAC standard history buffers store at 6 minute intervals  Data Archiver stores specified channels at 1 second intervals

Interaction Region Vacuum Chamber Upgrades p.22 of 25 Additional Diagnostics m (Really Fast) Abort Logger  Multiple channels for  10 seconds surrounding a beam abort  To date, only in place in IR-2; all other IRs added this downtime m Digital Video Recorder, Rotating Mirror, …

Interaction Region Vacuum Chamber Upgrades p.23 of 25 m Goal – to create a HOM absorber in a defined modular space  HOM absorber will damp and absorb the power, preventing neighboring components from absorbing excessive HOM power m Design optimized with MAFIA simulations m Installed one unit on 1 May 2006 m Three additional units deployed in Oct 2006 HOM Straight Bellows

Interaction Region Vacuum Chamber Upgrades p.24 of 25 Modes that leak past the RF shield finger still see the absorber HOM Straight Bellows m Measurements confirm that the straight bellows-absorber in Region damped 40% of the available HOM power m Very good agreement with calculated performance of a 7cm length absorber

Interaction Region Vacuum Chamber Upgrades p.25 of 25 Summary m The Interaction Region Vacuum System is receiving a major reworking in 2006  Principal efforts are centered around high current running  Management of synchrotron radiation and higher order mode heating has been addressed  Diagnostic capabilities have been developed and implemented to improve our abilities to understand future problems should they arise m We feel that the Interaction Region vacuum system will be ready to meet the demands of planned PEP-II operations

Interaction Region Vacuum Chamber Upgrades p.26 of 25 HER- Downstream, “Forward”, “Right” HER- Upstream, “Backward”, “Left” IPQ2RQ4RQ5RFrangible LinkHigh-Power Dump IPQ2LQ4LQ5LFrangible Link “Luminosity Chamber” 10M Collimator 19.5M 9.4M8.4M 5.7M 3.6M 2.3M 3.6M 5.7M 7.7M8.5M10.1M11.4M 0.0 M