26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
1 Nikhef Activities on CO 2 Cooling Bart Verlaat, Nikhef Introduction meeting with FOM director W. van Saarloos 1 Picture: LHCb-VELO evaporator.
A.P.Colijn1 CO2 Cooling for an ATLAS upgrade Plant requirements CO 2 : Properties CO 2 : Consequences of the properties CO 2 : From LHCb to ATLAS (or the.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
CO 2 Development of the Velo Thermal Control System (VTCS)
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
Cooling R&D at RWTH Aachen Lutz Feld, Michael Wlochal (RWTH Aachen University) CEC Meeting, CERN Lutz Feld, Michael Wlochal (RWTH Aachen University)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
14 May 2009Hans Postema - CERN CMS Upgrade Workshop Tracker Phase I upgrades 14 May
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
A two-stage system for the future cooling system.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
CMS Upgrade CERN April 27, 2010 W. Bertl PSI Power & Cooling: Design Status of BPIX.
CERN Cryolab CO 2 cooling for pixel detectors Investigation of heat transfer Christopher Franke, Torsten Köttig, Jihao Wu, Friedrich Haug TE-CRG-CI.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
Pixel Upgrade, CO2 cooling Upgrade Workshop FNAL 8 November November 20111Hans Postema - CERN.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
For the CMS Pixel detector
Refrigeration & air conditioning
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Safety approval of the installed copper cooling pipes
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
For the CMS Pixel detector
Forum on Tracking Detector Mechanics - Bonn, May 2016
M. Battistin CERN EN/CV/DC 9th July 2009
Aachen Status Report: CO2 Cooling for the CMS Tracker
Progress at the large scale CO2 system,
Pixel CO2 Cooling Status
Detector Technology Group
Recirculating CO2 System
Progress at the large scale CO2 system,
Progress in the development of the CO2 cooling system
Status Report on Fermilab CO2 cooling activities
Aachen Status Report: CO2 Cooling for the CMS Tracker
Second Meeting of the Material Budget & Engineering Working Group
CF testing pipe & testing plan
For the CMS Pixel detector
Presentation transcript:

26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1

Why CO2? Radiation hard Not electrically conductive, non corrosive Not flammable, not toxic Has excellent thermodynamic properties for micro- channels. Low dT/dP Low mass Low liquid/vapour density ratio Low viscosity High latent heat High heat transfer coefficient Environmental friendly Hans Postema - CERN26 May 20102

Pressure advantage Intuitively, higher pressures seem a disadvantage but: Gas flow at higher pressures needs smaller pipe diameters Pressure drops due to flow become less significant, allowing smaller pipes Small pipes can easily support the required pressures Hans Postema - CERN26 May 20103

Selection Many activities in different places Good overview requires several hours Global overviews risk to be repeating themselves through the year This presentation is a selection of some important achievements over the last few months Hans Postema - CERN26 May 20104

FPIX tube (February) Hans Postema - CERN26 May 20105

FPIX in fridge Hans Postema - CERN26 May 20106

Layout of the test section Length of the tube: 1m Inner diameter:1.4mm Wall thickness:100µm 13 temperature sensors glued on the tube Copper blocks for power supply

Improved insulation Environment influences obviously the readings of the sensors Better insulation of the tube needed Freezer must be at the same temperature as the cooling fluid Kapton tapeTubeArmaflex

Improvements Better results through insulating the tube and keeping the temperature inside the freezer at the temperature of the liquid

Temperature drop vs. tube length at 0°C Sensor 1 and 13 are before or after the heated test section

Temperature drop vs. tube length at -15°C Sensor 1 and 13 are before or after the heated test section

Comparison to correlations Temp.ThomeFriedelTest 1Test 2 Temperature drop 9°C 0.34 °C0.27 °C0.05 °C0.18 °C Pressure drop0.35 bar0.32 bar0.34 bar0.36 bar Temperature drop 0°C 0.37 °C 0.49 °C0.52 °C Pressure drop0.43 bar0.38 bar0.50 bar0.59 bar Temperature drop -15°C 0.39 °C0.49 °C0.82 °C0.89 °C Pressure drop0.61 bar0.68 bar1.25 bar1.37 bar Temperature drop -30°C 0.47 °C0.67 °C1.41 °C1.46 °C Pressure drop1.05 bar1.33 bar3.63 bar3.93 bar

Tsat=9°

Tsat=0°

Tsat=-15°

Tsat=-30°

Conclusions of tests Software of some correlations now fully debugged an operational Interesting differences between calculations and measurements remain FPIX tube can reliably cool the requested heat load of 124 W dT over tube length < 3 degrees C dT due to HTC < 3 degrees C Hans Postema - CERN26 May

18 May 2010 Reached an important milestone First time that the Full Scale cooling plant test setup was running No problem in priming the pump Pump runs very quiet and smooth, no vibrations The result of a year of work by a dozen people Hans Postema - CERN26 May

Cooling plant Hans Postema - CERN26 May

Including dummy load Hans Postema - CERN26 May

Chiller part Hans Postema - CERN26 May

View with control rack Hans Postema - CERN26 May

Hans Postema - CERN26 May

Control interface Hans Postema - CERN26 May

Next steps Commissioning of the plant at ambient temperature Test run of Atlas IBL cooling loop Installation of accumulator, required for low temperature operation Commissioning of the plant at low temperature Hans Postema - CERN26 May

Strategy (1) CO2 cooling plants cannot be bought off the shelf Relevant experience is not available in industry Current activities are generating the necessary experience “in house” Future CO2 cooling plants shall be designed and constructed “in house” Hans Postema - CERN26 May

Strategy (2) Cooling plant shall be constructed early, leaving 1 year for commissioning on the surface and 1 year for installation in UX To avoid schedule constraints, one cooling plant foreseen for detector commissioning in TIF, and one for installation in the CMS cavern Hans Postema - CERN26 May

Qualification Engineering and design shall follow the principles applied in aero-space or safety critical industrial applications Excellent workmanship shall have a priority over low-cost Extended “burn in” period necessary, comparable with satellites (1 year) Hans Postema - CERN26 May

Safety High pressure is a safety concern when combined with larger volumes (stored energy) Pipe-work and components are in PED class 1 (Pressure Equipment Directive) DN<32 requiring “Good Practice” Storage tanks or Accumulators are in class 4 requiring certification Accumulator for the full scale test setup will be produced with a CE certificate, by NIKHEF Hans Postema - CERN26 May

Schedule 2010 – Testing of Full Scale setup – Engineering and design of detector parts, pipe-work, fittings and final plant 2013 – Construction of cooling plants 2014 – Burn in of cooling plants in TIF 2015 – Installation cooling plant in UX 2016 – Installation of detector Hans Postema - CERN26 May

Participating groups CERN – Atlas CERN – CMS CERN – PH-DT CERN – EN-CV CERN – Cryolab EPFL Lausanne Fermilab IPN Lyon NIKHEF Atlas LHCb PSI RWTH Aachen SLAC Atlas University Esslingen University Karlsruhe Hans Postema - CERN26 May