LALEucard WP 10.8.2 1 IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen,

Slides:



Advertisements
Similar presentations
Name (Lab)Presentation title (Place, date) 1 IN2P3 Les deux infinis Optical cavity Revue ThomX mécanique (25/01/2011) Optical cavity Yann Peinaud & Mickael.
Advertisements

4-H Food Stand Machine Cleaning 2014 BC WI 4-H Food Stand.Machine Cleaning 1.
Ultrasonic washer and HPR The 3nd IHEP-KEK SC collaboration meeting Ultrasonic Washer and HPR device for 9-cell 1.3GHz Cavity Zhongquan.Li, Jiyuan Zhai,
How to Properly Mop a Floor Prepare the area by moving an obstacles before mopping begins. Sweep, vacuum or dust mop the floor to remove any large debris.
Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
© 2013 Toshiba Corporation Toshiba Electron Tubes & Devices Co., Ltd. November, 2013 Scope of Disclosure Owner Comparison of fabrication techniques in.
Type 0 flex assembly to the stave 2011/06/08 François-Xavier NUIRY CERN PH/DT/PO 1.
20. June 2005SDW2005: Plasma Cleaning S. Deiries, ESO 1 Plasma Cleaning A new method of ultra-cleaning detector cryostats Sebastian Deiries, Armin Silber,
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
1 shower. Time = 20 minutes. First 5 minutes running in order to warm up. 1 brushing of teeth. Time = 3 minutes. Water running constantly. 1 wash of pots.
Introduction To the pr EN ISO Project norm
AIR BEARING SYSTEM.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
E. Doyle 7/20/06 rev 9/13/06 1 / 16RF Coupler Assembly Facility SLAC TTF3 Coupler Assembly Facility Specifications Based on TESLA facility built at LAL,
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Orsay, Sergio Calatroni - CERN 1 CERN facilities for Superconducting RF S. Calatroni, J.-P. Delahaye, J. Tückmantel, B. Vullierme.
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Test Results of TTF-V Couplers for ILC H. JENHANI (CEA/IRFU) 1.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
1.3GHz Input Coupler for ILC
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Dennis Coyne HAM-SAS Bidder’s LIGO Laboratory, Caltech
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
Orsay, May 5th 2011EuCARD- WP IN2P3 Les deux infinis IN2P3 Les deux infinis Orsay, May 5 th 2011 EuCARD Meeting WP10.8: Plasma Discharge Cleaning.
Preparation of Supplies for Sterilization. Objectives Explain the steps involved in cleaning, disinfecting, wrapping, and packaging sterile packs and.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, B. Mercier and.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
R&D for Fundamental Power Coupler in SRF Mass-Production
CERN – Zanon discussions
Cryomodule test stand at ESS site
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Maximum count per cycle
FRESCA2 Update on the dipole design and new calculations
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
High Power Couplers and… pushing the limits of SC cavities
IMP Cryomodule Assembly and Alignment
Cryomodule Assembly Plan
V. Veshcherevich Cornell University
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen, B. Mercier and C. Prevost Eucard WP 10.8 (Orsay, 5 May, 2011) Eucard WP10.8

LALEucard WP IN2P3 Les deux infinis  Introduction  Automatic Cleaning System  Plasma Discharge Cleaning  Schedule Eucard WP 10.8 Summary

LALEucard WP IN2P3 Les deux infinis Introduction Warm coupler part Cold coupler part Coupler preparation 3 Weeks Coupler parts after manufacturing Cryomodule assembly Eucard WP 10.8 Cleaning Desorption Conditioning Assembling

LALEucard WP IN2P3 Les deux infinis Global goals Cleaning Assembling Desorption Conditioning Time in days Assembly schedule  For mass production (ILC, couplers?) : improve quality and reduce the time of the preparation Eucard WP 10.8  Actual process  5 days  No repeatability  Pollution risk from manual handling  Automatic Cleaning System  3 hours  Full repeatability and control of each parameters  No handling but risk of pollution due to the machine  Main challenge

LALEucard WP IN2P3 Les deux infinis Cleaning Eucard WP Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Oven Bench Rinsing sink Ultrasonic bath Mobile clean room ISO 5 (class100) In-situ baking oven 13 RF conditionning area LAL infrastructure

LALEucard WP IN2P3 Les deux infinis  Integration:  Service hatch  The machine can be load and started by outside  No clean-room contamination due to the machine Automatic Cleaning System 360 ° +/- 180 ° Eucard WP 10.8 Wall Clean room ISO 4 Hall (dirty environment) IN OUT Clean Dressing Room ISO 6 (class1000) Material Air Shower Air Shower ISO4 (class10) Dirty Dressing Room Cleaning Machine Bench Rinsing sink Ultrasonic bath 1 2 3

LALEucard WP IN2P3 Les deux infinis  Logical Synoptic of the full cleaning cycle  Ultrasonic washing  Rinsing  Resistivity measurement  Air drying Automatic Cleaning System Eucard WP 10.8 Bellow Ceramic Cold parts Test waveguide

LALEucard WP IN2P3 Les deux infinis  Motion:  A first rotation around the axle of the device  A second rotation around the axle of each pieces:  Dust free & UltraPure water resistant  Special materials  Stainless steel  PVDF  Titanium  No friction  Ball bearings  Magnetic coupling Automatic Cleaning System 360 ° +/- 180 ° Eucard WP 10.8 Wall Clean room ISO 4 Hall (dirty environment) IN OUT

LALEucard WP IN2P3 Les deux infinis  Design of the chamber Automatic Cleaning System Eucard WP 10.8 Cleaning chamber (316L electro polished) Slide Transductor Coupler holder Motor Belt Pulley Track Actuator

LALEucard WP IN2P3 Les deux infinis  Design of the main motion Automatic Cleaning System Eucard WP 10.8 Ball bearing 316L balls PVDF tracks Ball thrust bearing 316L balls PVDF tracks Magnetic disks 316L Left arm 316L Right arm 316L Coupler supports 316L Nuts Nitronic 60 Nuts T40 Axles 316L

LALEucard WP IN2P3 Les deux infinis Automatic Cleaning System Eucard WP 10.8  Coupler holder test  Test bench production  end of May  Particules tests  beginning of June (2weeks) Ultrasonic bath UltraPure water + detergent Bench plate Motor

LALEucard WP IN2P3 Les deux infinis Thank you