NQA-1 Evolution 2008 – 2015 Mike Nicol DOECAP ASP Workshop Sept

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Transition from Q1- 8th to Q1- 9th edition
IAEA 1 The IAEA has revised the 1996 Safety Standards 50-C/SG-Q: QA Requirements and Safety Guides Published in 1996 Promotes structure: –Management –Performance.
Page  ASME 2014 Standards and Certification Training Module A – Administrative A2.Standards and Certification Products ASME S&C Training Module A2. Standards.
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
1 Continuing Evolution of U.S. Nuclear Quality Assurance Principles, Practices and Requirements PART II - A Tutorial August 2005 This document.
EPSON STAMPING ISO REV 1 2/10/2000.
Presented By – Robert G. Burns, PE
ACADs (08-006) Covered Keywords Byproduct material, source material, controller, custodian, ORM, sealed source, exempt source, special nuclear material.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Nuclear Quality Standard Association
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The ISO 9002 Quality Assurance Management System
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Management System
Chapter 10: Quality Management Systems Jennifer Sadorus Heather Heller.
RIM ) - REWRITE OF SECTION XI, DIVISION II, USING RISK INFORMED METHODOLOGY - FRANK J. SCHAAF,JR, P.E. ASME CHAIRMAN, SWGRIM CONSULTANT, STERLING REFRIGERATION.
Quality Assurance/Quality Control Policy
Technical requirements  Sampling  Analysis  Reporting of the results.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Supply Chain Quality Assurance –Procurement of Hazmat Packaging
5.2 Personnel Use competent staff Supervise as necessary
Photocopies Occasionally need uncontrolled copies
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
External Operations Experience Update: NRC Information Notices: Qualification of Safety-Related Components and Antifreeze Agents in Fire Water Sprinklers.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
Technology Services – National Institute of Standards and Technology Conformity Assessment Body Armor Technical Workshop October 2005 Gordon Gillerman.
Software Quality Assurance Activities
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
QUALITY ASSURANCE TRAINING DOE O 414.1C AND 10 CFR 830, SUBPART A
| Folie | Folie 2 ISO approach to GHG-inventory QA/QC UNFCCC Workshop on National Systems April 2005, Bonn Doris.
ISMS QMS Integration Dr. Thomas Helms, Parsons DOE SRS SWPF Project.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
This file contains the PowerPoint presentation for the significant changes to the JFMM applicable to all Volumes with the exception of the Nuclear Addendum.
Module 4 Activity: Compare Quality Essentials to ISO 15189:2012 Checklist Sections.
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
Quality Assurance Policy in DOE Debbie Rosano Director, Office of Quality Assurance (AU-33) September 14, 2015 Presented to: 2015 Analytical Services Program.
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Alun Gallie Manager, Training Package Development and Implementation.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
ISO Registration Common Areas of Nonconformances.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
HPT Rev. 0 Page 1 of 28 TP-1 TVAN Technical Training Health Physics (RADCON) Initial Training Program Radioactive Materials Handling and Accountability.
Quality Standards ISO:9000 ISO:9000 Quality Systems Under ISO:9000 Quality Systems Under ISO:9000 ISO:14000 ISO:14000 ISO Certification Process ISO Certification.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
EPRI Update Procurement and Supply Chain
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Module 1 IAEA Safety Standards on Management Systems.
UNIT V QUALITY SYSTEMS.
Flooding Walkdown Guidance
IEEE SC 2 May 12, 2014 Robert Konnik
November 8, 2017 Presented by: Ron Schrotke
TRTR Briefing September 2013
I&C requirements and configuration management
38th Nuclear Safety Standards Committee 37th Radiation Safety Standards Committee 38th Waste Safety Standards Committee Joint Session 26 – 27 November.
Presentation transcript:

NQA-1 Evolution 2008 – 2015 Mike Nicol DOECAP ASP Workshop Sept

ASME NQA-1 Updates and Revisions NQA-1-1979 was 1st Edition Updated Editions published ~ every 3 years (1983, 1986, 1989, 1994, 1997, 2000, 2004, 2008, 2012, 2015) Addenda published every year Starting in 2012 Editions published every 2 years with no addenda publication

NQA-1-2008 Issued 3/19/2008 as 9th Edition Performance based requirements deleted in 2004 Edition added back in (e.g. QA staff responsibilities) Appendix 7A-2, Guidance on Commercial Grade Items and Services, revised and designated in Subpart 2.14 as requirements

NQA-1-2008 (Continued) Part II Introduction significantly revised to clarify applicability Subpart 4.6, Application Guidance on the Use of NQA-1-2000 for Compliance With 10 CFR 71 and/or 10 CFR 72 Requirements

NQA-1a-2009 Endorsed by DOE and NRC Three Commercial Grade Item definitions Requirements 3 and 7 specify Subpart 2.14 for CGD Expansion on Requirement 11 for computer program testing; Appendix 11A-1 folded in Minor technical changes to Subpart 2.1, Cleaning of Fluid Systems

NQA-1a-2009 (Continued) Minor technical changes to Subpart 2.2, Packaging, Shipping, Receiving, Storage, and Handling plus scope expansion from power plants to nuclear facilities Subpart 2.7, Computer Software QA, requires Subpart 2.14 for software CGD Security features added to software design requirements (vulnerability protections)

NQA-1a-2009 (Continued) Subpart 2.14 revised in its entirety (combining prior Subpart 2.14 and Requirement 7 CGD) Appendix 17A-1 List of Typical Lifetime Records expanded Subpart 4.2, Graded Application of NQA to R&D versus QA for Nuclear R&D

NQA-1b-2011 Requirements 1 – 18, Article 100 titles revised from Basic to General Subpart 2.5, Installation, Inspection and Testing of Structural Concrete, Steel, Soils, and Foundations Title changed from power plants to nuclear facilities Substantial update (32 locations changed) Subpart 4.3, Use of ISO-9001-2000 to Meet NQA-1-2000, updated to ISO-9001:2008 and NQA-1-2008/2009

NQA-1b-2011(continued) Subpart 4.5, Use of NQA-1-2000 for Compliance with 10 CFR 830 Subpart A and DOE O 414.1, updated to NQA-1-2008/2009 Added Subpart 4.7, Comparison of NQA-1-2008/2009 and IAEA GS-R-3, 2006-STI/PUB/1252

NQA-1-2012 Minor technical changes to Subpart 2.2, Packaging, Shipping, Receiving, Storage, and Handling plus, 405, Shipments From Countries Outside the US added Subpart 2.3, Housekeeping, scope expanded from power plants to nuclear facilities Subpart 2.8, Installation, Inspection, and Testing of Mechanical Systems Scope expanded from power plants to nuclear facilities Substantially rewritten

NQA-1-2012 (Continued) Subpart 2.20, Subsurface Investigations Scope expanded from power plants to nuclear facilities Substantially updated Added Subpart 2.22, Management Assessment and Quality Improvement for 10 CFR 830 and DOE O 414.1 Nonmandatory Appendices changed to Subparts Subpart 3.1-16.1, Corrective Action, substantially revised Subpart 3.1-18.1, Audits, minor subparagraph revisions

NQA-1-2012 (Continued) Added Subpart 3.2-2.14, Guidance on CGD of Computer Programs and Computer Services Subpart 4.2.1, Guidance on Graded Application of QA to Nuclear R&D, revised and enhanced

NQA-1-2015 Parts I, II, III and IV Introduction; clarified Purpose, Applicability, Responsibility Requirement 2, QA Program, 400 Records of Qualification, corrected for Lead Auditors and Inspection and Test personnel Requirement 3, Design Control 401 Use of Computer Programs for Design Analysis, clarified 800 Software Design Control, 801 – 802 replaced by Subpart 2.7

NQA-1-2015 (Continued) Requirement 11, Test Control, Computer Program Test Control elements replaced by Subpart 2.7 Requirement 18, Audits, grace period of 90 days allowed for scheduled audits and evaluations Subpart 2.1, Cleaning of Fluid Systems Expanded from power plants to nuclear facilities Technical content updated Subpart 2.4, Installation, Inspection, Testing of PI&C Equipment deleted

NQA-1-2015 (Continued) Subpart 2.7, Computer Software, substantially revised including elements of software design control and testing Subpart 2.16, Calibration and Control of M&TE deleted Subpart 3.1-3.1, Guidance for Design Control 401, Use of Computer Programs for Design Analysis added Additional enhancements added Subpart 3.1-7.1, Guidance on Control of Purchased Items and Services, 705 Determining Authenticity added

NQA-1-2015 (Continued) Subpart 3.1-18.1, Guidance on Audits 204 Shared External Audits added Audit scheduling guidance deleted (moved into Requirement 18) 600 Response and 700 Follow-up Action revised and refer to new Subpart 3.1-18.2 Subpart 3.1-18.2, Guidance on Classification and Handling of Audit Issues added Subpart 3.1-2.7.2, Guidance on Parts I and II Requirements for Software added

NQA-1-2015 (Continued) Subpart 4.1.5, Guidance to Modify an ANSI/ANS-15.8 Program (Research Reactors) to meet NQA-1-2012 Subpart 4.2.7, Guidance on Peer Review added

NQA-1-2017 Vision 2017 Revise Requirements 4 & 7 for S/CI Revise Requirements 4, 7, 18 for NQA Certification Program New Subpart on Graded QA New Subpart on Calibration and Testing Facilities New Subpart to replace OCRWM QARD New Part 5 Requirements and Guidance on QMS

NQA-1-2008 through 2015 Evolution Questions?

2015 Analytical Services Program Workshop Charleston, South Carolina Thursday Morning, September 17, 2015 Break 4/24/2017