EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.

Slides:



Advertisements
Similar presentations
ENROUTE COCKPIT INSPECTIONS
Advertisements

FANS (Future Air Navigation System) Flight Crew Procedures
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Flight Crew Activities During a Typical Flight
Air Traffic Management
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 20, 2011 Federal Aviation Administration Data Communications DCIT #9 Flight Deck Working Group.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
DARP.
Normal and Emergency Communication Procedures
ATN/VDL Mode 2 Implementation Status
1 Arrival Scenario 1 November, Scenario Overview Sharing of Flight and Status data via AWIMSharing of Flight and Status data via AWIM –Parking.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
Tower Enroute Control Procedures
ATN Subnetwork Implementation:
CPDLC / ADS Introduction 4/22/ :49 AM
CPDLC / ADS Operations 4/22/2017 2:35 PM
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
Data Communications Implementation Team (DCIT)
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
1 Departure Scenario 1 November 14, Scenario Overview Entry of Flight Data into AWIM SystemEntry of Flight Data into AWIM System –Embry Riddle.
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Dan Allen MEM DCL Trials. 2 FedEx Corporation Operate Independently, Compete Collectively, Manage Collaboratively.
Air Traffic Control. There are different types of air traffic controllers who communicate with pilots from the time the pilot calls for a clearance to.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
Harris.com 02/01/2014 – 02/28/2015 Alex Murray | Systems Engineer DCIT 39 Plenary Health Monitoring Stats.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
AAL CDM Message Sending Process CDM A&D Meeting January 24-25, 2001 Presented by: Roger Beatty - Operations Coordinator American Airlines - System Operations.
Copyright © 2013 Boeing. All rights reserved. FaST | PNST | AOE Status: MD-11 issue AOEmodifiedEOT_RT_Template.ppt | 1.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
International Civil Aviation Organization
EWR DCL Flight Tests Capt Gregg Kastman MD-11 Flt Trng Sup
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
ATN/VDL Mode 2 Implementation Status
FANS (Future Air Navigation System) Flight Crew Procedures
Data Communications Implementation Team (DCIT)
Data Communications Program
15-19 Nov 2010 Rockville, MD – Lockheed Martin
ATN Subnetwork Implementation:
Presentation transcript:

EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup

2 EWR DCL Flight Trials MD-11: 27 flights conducted -Initial clnc (success rate 20/27, 74%): -17 CAF, 1 UM79, 2 UM80s -7 problems -Revised clnc after taxi (success rate 8/9, 89%): -4 UM79s, 4 UM80s -1 problem

3 EWR DCL Flight Trials B-767: 2 flights conducted -Initial clnc (success rate 100%): -1 CAF, 1 UM79 -No revised route clnc after taxi Several 767 flights planned for October

4 Summary of Problems FMC error (wrong tail # in AFN logon): 1 flight -Resolution: -Emphasize proper tail # for entry -Automation update? Filing errors (local coding, modify FRC DCL): 3+ flights -Resolution: -Additional training provided to NY ARTCC, EWR Tower

5 Summary of Problems DTAP reconstitution: 1 flight -Resolution: -Improve clock sync -Notify AOCs for possible re-file DSP VHF radio frequency conflict: 1 flight -Resolution: -Frequency deconfliction -Confirm EO applied to acft datalink equipment

6 Summary of Problems Errors yet to be resolved: 3 flights -AFN LOGON “REJECTED” (z-date 15 Aug) -Clnc requested, “STANDBY” received (z-date 7 Aug, 21 Aug)

7 General Observations DCL Trials continue to be value-added -Uncovered pitfalls early on for: -ARTCC & Tower procedures -FMC handling of various messages -Flight Deck logon / message handling -DTAP hardware/software Suggestion: Continue Trial expansion. More airlines and more airports will each bring forward unique issues to consider.

8 General Observations Flight crew confusion on “DCL” terminology -Despite specific CPDLC instructions, they immediately think same as ACARS procedures internationally (Hong Kong, Narita, Cologne, Paris, Mexico City, etc.) -May be confusing for other international operators Suggestion: Create a distinct term for CPDLC DCL

9 ACARS DCL in Cologne, Germany

10 ACARS DCL in Paris, France

11 General Observations ATC hesitant to use DTAP during taxi -Most altitude/freq changes during taxi still via voice Suggestion: Continued practice; more participating aircraft should help make it habit for controllers

12 General Observations Although CAF is good for trial count, the ROUTE CLEARANCE makes DCL standout from PDC. We need to continue testing UM79 / UM80s to identify: -Potential FMC problems (partial loads, joining STARs) -Potential printer issues -Potential flight deck human factors issues

13 General Observations Need to expand CPDLC UM capability: -Must have capability to join a STAR at any point -Even more critical for dynamic enroute ops -Should provide planned runway in DCL -Impacts how a SID is programmed in FMC -Provides CPDLC option to ATC for rwy change during taxi -If Oceanic controller can assign appr/rwy for TA, Clnc Del should be able to predict dept rwy - Should be able to print all messages -Invaluable comparison tool especially for legacy aircraft

14