TE/MPE-TM 14.11.2013 GRZEGORZ SEWERYN THE UPGRADE OF TT SENSORS C-50 TO THE REDEL CONNECTOR 1.

Slides:



Advertisements
Similar presentations
GCSE ICT Networks & Security..
Advertisements

A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
New HV test specification for the LHC N. Catalan for the EI section.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
Transmission Oil Pump Audit Test Stand Project Overview.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow.
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Transferring data.  Most commercial computer users need to allow their employees to share data.  It also needs more than one employee to access the.
TE/MPE/EE Short ‘Halfway’ Update ELQA – LS1 Activities MPE/The Electrical Engineering section Knud, on behalf of TE/MPE/EE – 20 September LSC Reminder:
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
Formal Lab Reports Prince Andrew High School. Title Page At the bottom right corner of the title page, include: Title Presented to Teacher’s name By Student’s.
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
BLM internal beam abort request :24:50 Bernd Dehning CERN BE-BI MPP, B. Dehning.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
MPE Workshop for LS1 / 22 & 23 Nov  DFB Instrumentation Upgrade  Cabling Issues  R2E Consolidation  Current Lead Insulation Project  DFB Instrumentation.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
PES 1000 – Physics in Everyday Life
Considerations from machine protection and the ELQA teams
Cryomodule test stand at ESS site
"Drawer Mechanics - MiniDrawer"
Cryo equipment strategy in the R2E context
ELQA Electrical Quality Assurance
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
HF Test station at P5 A.Mestvirishvili.
T1 Electronic status Conclusions Electronics Cards:
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Mini-drawers, FE-ASIC , Integrator
Possible causes for SPS ZS2 misalignment
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
MPE main activities planned for LS2
Status of ELQA equipment and related software
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Some proposals on HV circuits realization for segmented straw detector
DT Infrastructure: LV, HV, Gas
LS1 TE/MPE/EE CABLE ACTIVITIES
Things to be Aware of the Intake Air Temperature Sensor
How Computers Work.
Presentation transcript:

TE/MPE-TM GRZEGORZ SEWERYN THE UPGRADE OF TT SENSORS C-50 TO THE REDEL CONNECTOR 1

TE/MPE-TM GRZEGORZ SEWERYN Overview Summary 2 1. What is the proximity equipment? 2. The need of DFB instrumentation upgrade 3. Decision on whether to exchange connectors in the tunnel or in the laboratory 4. Replacement of Cannon C-50 to REDEL connector 5. Number of Cannon C-50 connectors to be modified 6. Validation of the replacement: Continuity and HV test bench 7. Conclusion

TE/MPE-TM GRZEGORZ SEWERYN 1 What is the proximity equipment? 3 1. Connection box which routes the current lead temperature sensors and V-taps used for circuit protection 2. Drawing of the PE High current module

TE/MPE-TM GRZEGORZ SEWERYN  During ELQA tests of RB circuits, lot of HV breakdowns were observed!  The breakdown usually damaged the cryo conditioner card reading the temperature sensor.  TE/CRG claimed that the defect was mostly coming from the C50 connector which is not appropriate for HV  As a common agreement, it was decided to upgrade this C50 connector with a proper HV connector  Together with TE/CRG, it was decided to replace the Cannon C50 connector by the REDEL SLGH51 (Lemo) connector  After LS1, TE/CRG will consolidate their conditioner card, and the RB circuit will be tested at 2.1kV 4 2 The need of DFB instrumentation upgrade Cannon C50 Proximity Equipment

TE/MPE-TM GRZEGORZ SEWERYN 3 Do we upgrade it in the tunnel? 5 During a dedicated meeting among our section, we discussed the possibility of upgrading the PE in the tunnel or in the Lab: Advantages Disadvantages 1.Only one cable disconnection is needed (C50-1) 2.No need to dismount the box from the Frame 3.No risk of damaging the fragile cable segment 1.Poor illumination 2.Very bad access to the PE 3.Dust, noise… 4.More human resources needed

TE/MPE-TM GRZEGORZ SEWERYN 4 Replacement of Cannon to REDEL connector 6 Cannon connector (300V) Redel connector (3,2kV)

TE/MPE-TM GRZEGORZ SEWERYN 5 Number of Cannon C-50 connectors to be modified  16 connectors will be exchanged, all of them have been already delivered.  While mounting on the Proximity Equipment, a small metal plate, attached to the REDEL connector, will compensate the difference in size of the previous connector. 7 Fig 3. Redel connector with aluminium plate Fig 4. Redel connector modification, with aluminium plate in AutoCAD.

TE/MPE-TM GRZEGORZ SEWERYN 6 Validation, Continuity and HV test bench  A dedicated test bench was made for the Redel and Cannon C-50 connector tests.  The test bench consists:  Laptop with dedicated software  HV crate  Digital multimeter 8 Laptop with dedicated software HV crate Digital multimeter PE-Box

TE/MPE-TM GRZEGORZ SEWERYN 9 6 Validation, Continuity and HV test bench  A dedicated test procedure was written  After each test, a report is done and stored for future reference in ELQA dedicated folder in DFS

TE/MPE-TM GRZEGORZ SEWERYN 10  Up to date, three crates are fully upgraded and successfully tested.  There are 13 more crates that need to be upgraded  The estimated date for the completion of the project is February 2014  We do not foresee any delays 7 Conclusion

TE/MPE-TM GRZEGORZ SEWERYN 11