JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
TRD August 2007 A. Marín (GSI) 6/11/2015 STATUS TRD COOLING TRD STATUS MEETING August 2007 STATUS TRD COOLING TRD STATUS MEETING August 2007.
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
Detector Cooling Project Thermosiphon Project Status Report
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
C 3 F 8 detection in N 2 pixel volume environment Rusty Boyd, Martin Doubek, Jan Godlewski Greg Hallewell Sasha Rozanov,Vic Vacek ATLAS ID Sonar Coolant.
ATLAS Tracker Group PPD Staff Talk 28/Nov/2005 Steve McMahon 1 Steve McMahon : An Introduction Backgrounds and Pre-History –Imperial College London
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 Pixel Detector General –July Evidence of galvanic corrosion in EU barrel cooling tubes. Recovery plan implemented, this problem now solved but…..
 Roof integration  USA15 cavern integration Sylwia Wojnarska CERN - European Organization for Nuclear Research Warsaw University.
ATLAS and CERN/ST 2nd April 2003 Marzio Nessi. 02/04/2003 Today ATLAS project Detector Components Construction Detector Integration and Installation ATLAS.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Cooling System Solutions
Michele Battistin Elena Perez Rodriguez 10 November 2010
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Pipe and station integration ALEX BITADZE CERN- European Organization for Nuclear Research ATLAS Experiment
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
CSN1 4 Aprile 06L.Mandelli1 Stato Generale di Atlas Aprile 06 Sottosistemi –Toroidi –Solenoide –Mu Barrel –Mu EC –LAr e Tiles –TRT –SCT –Pixel –LV1 –DAQ.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Overview of recent CO 2 cooling developments As an example for LHCb-Velo and UT cooling? Kick-off meeting 28 may 14 Bart Verlaat 1.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
Interventions on electrical distribution and racks’ infrastructure still to be done during LS1 and their impact W.Iwanski.
Short summary of ATLAS week. Really a lot has happened since the last ATLAS Plenary in Paris! Giant steps in the detector hardware construction, assembly,
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Flexible lines production and planning
Status of the cryogenic system for B180
Insertable B Layer Cooling System
Installation plans from mid 2005
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Presentation transcript:

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 1 JCOV NOVEMBER 2005 ATLAS cooling systems installation plans Jan Godlewski CERN EP-ATI The H.Niewodniczanski Institute of Nuclear Physics Polish Academy of Science

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 2

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 3

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 4 Cooling units in UX15 – installation status  Calorimeters cooling units (LAr and Tiles)  Units installed  On the detector piping for Barrel is done  Connection from the Barrel to the units manifolds is proceeding since mid of November  Pneumatic lines from control racks in USA15 to cooling units installed  Control rack in USA15 installed  Vacuum pumps cooling unit  Unit installed  Cooling pipes on the cryorings are being installed  Pneumatic lines from control racks in USA15 to cooling units installed  Control rack in USA15 installed

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 5 Inner Detector cooling systems  Evaporative  Distribution racks (4 units) Two racks will be finished by the end of November Next two before Christmas  Piping between USA15 and distribution racks in UX15 are being installed  Pneumatics lines between USA15 and UX15 installed  New compressor from Haug should be delivered to CERN this week. Will be installed in SR1 and tested before installation in USA15  Work on evaporative system installation (compressors, condenser, reservoirs, pump, etc.) is ongoing

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 6

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 7 Inner Detector cooling systems (cont)  TRT mono-phase cooling and ID cables cooling  Cooling units – under assembly  Piping between the units and distribution racks/manifolds – contracted  Distribution racks for TRT – under assembly  Manifolds for ID cables – are being manufactured  Pneumatic piping between USA15 and UX15 – installed  Control rack in USA15 - installed

JCOV 24 NOVEMBER 2005 J.Godlewski EP-ATI 8 SR1 evaporative system – compressor unit