Using GIS to Find Suitable Locations for Solar Power Plants Submitted By: Scott Peterson May 12, 2005 Texas A&M University Department of Civil Engineering.

Slides:



Advertisements
Similar presentations
Cognitive Modelling – An exemplar-based context model Benjamin Moloney Student No:
Advertisements

Understanding Electrical TransmissionDemonstration D1 A Guide to the National Grid Transmission Model Demonstration D1 Power losses in transmission.
Project 2.1 Cost-Benefit Framework: Secondary Benefits and Ancillary Services MIKE QUASHIE AND GEZA JOOS (MCGILL UNIVERSITY)
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
A Solar Generation Forecasting System for ERCOT Where Would the Data Come From? Jay Zarnikau | President Steve Wiese | Senior Consultant, Energy Efficiency.
Quantifying Emission Reductions from Local Government Actions Bruce Biewald Presentation to Metropolitan Washington Council of Governments Energy and Air.
Complex Power – Background Concepts
Novel Design of a Free-Piston Stirling Engine - Modelling and Simulation Researcher: Salem S. Ghozzi Supervisor: Dr. Boukhanouf R.
Computer Integrated Manufacturing CIM
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
Introduction This project deals with conversion of Vector based Probable Maximum Precipitation (PMP) data into Raster based PMP data using different interpolation.
N ON- P OINT S OURCE P OLLUTION Analysis and Prediction in ArcView David Munn Texas A&M University/Dept. of Civil Engineering CVEN 689 Applications of.
FRIENDS and WAR The mission of the Power Center for Utility Explorations is to explore all energy issues holistically and to develop innovative solutions.
Texas A & M University Department of Civil Engineering CVEN689 Applications of GIS to Civil Engineering Instructor: Dr. Francisco Olivera Application of.
E.G. please always turn off your cell phone or put it on vibrate mode for class A kind reminder on distractions such as phone use, noise (see syllabus).
Solar Energy: Location Is Everything? Scott Peterson Environmental Engineering Texas A&M Increasing population and decreasing fossil fuel reserves require.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Texas A&M University, Department of Civil Engineering CVEN 689 Applications of GIS in Civil Engineering Professor: Dr. Francisco Olivera Student: Brad.
Texas A&M University Department of Civil Engineering Cven689 – CE Applications of GIS Instructor: Dr. Francisco Olivera Logan Burton April 29, 2003 Application.
Urban Planning Applications of GIS GIS can be applied to many types of problem. Among these are representatives of both raster and vector data base structures,
Principle of Functional Verification Chapter 1~3 Presenter : Fu-Ching Yang.
Abstract The operation of today’s wastewater systems requires ongoing planning, maintenance, and management. Planning of these systems involves a thorough.
David Edgerton FCPA Director Quality + Expertise + Flexibility + Innovation = Confidence & Real Value Depreciation.
SDLC and alternative methodologies 1/14/2015 © Abdou Illia MIS Spring 2015.
ECE 2300 Circuit Analysis Dr. Dave Shattuck Associate Professor, ECE Dept. Lecture Set #24 Real and Reactive Power W326-D3.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
So where does the ADAPS optimization method fit into this framework? The seismic trace equation does not fit the linear definition, since the values on.
1. PROJECT GOAL Our final product will be an interactive public website which will allow the user to view various aspects of our current and future infrastructure.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
Smart-Grid: Power Distribution and Monitoring Application Cheryl Limas, Daniel Rendon, Advisor – Dr. David Wetz, Advisor – Gregory Turner Department of.
Self-Organizing Agents for Grid Load Balancing Junwei Cao Fifth IEEE/ACM International Workshop on Grid Computing (GRID'04)
Performance of SolarWalls in Minnesota
Project Planning and Capital Budgeting
The system will output the following: Our analysis concluded that the average breakeven point for a given fire department installing solar panels on its.
Engineering Doctorate – Nuclear Materials Development of Advanced Defect Assessment Methods Involving Weld Residual Stresses If using an image in the.
Dr. Cesar Malave Texas A & M University
Costing of energy generation of multi area interconnected systems with conventional as well as renewable sources Kaisar R. Khan McNeese State University.
Lidzbark Warmiński heating plant in RETScreen Software Justyna Pawilonis 28 March 2007 Lidzbark Warmiński.
1 Ch 3: Forecasting: Techniques and Routes. 2 Study objectives After studying this chapter the reader should be able to: Evaluate the suitability of several.
Chilling at Penn: Weather-Analysis of Load Tool (WALT) Abstract: Penn’s MOD 7 plant supplies chilled water to the entire campus for its air- conditioning.
NEW VISION OF ENGINEERING ECONOMY COURSE (VISION) MODULE 3 LECTURE 1-2 Cairo, 13 July 2005.
Evaluation of Alternative Methods for Identifying High Collision Concentration Locations Raghavan Srinivasan 1 Craig Lyon 2 Bhagwant Persaud 2 Carol Martell.
Sponsor: Dr. K.C. Chang Tony Chen Ehsan Esmaeilzadeh Ali Jarvandi Ning Lin Ryan O’Neil Spring 2010.
1 RECENT DEVELOPMENTS IN MULTILAYER PERCEPTRON NEURAL NETWORKS Walter H. Delashmit Lockheed Martin Missiles and Fire Control Dallas, TX 75265
Department of Electrical Engineering, Southern Taiwan University Robotic Interaction Learning Lab 1 The optimization of the application of fuzzy ant colony.
Chapter 2 Risk Measurement and Metrics. Measuring the Outcomes of Uncertainty and Risk Risk is a consequence of uncertainty. Although they are connected,
Texas is facing the frightening thought of rolling blackouts. New environmental legislation is threatening to close down power plants for reasons such.
Project Estimation techniques Estimation of various project parameters is a basic project planning activity. The important project parameters that are.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 Seema Thakur (st107641) Advisor: Dr. Weerakorn Ongsakul Optimal Generation Scheduling of Cascaded Hydro-thermal and Wind Power Generation By Particle.
Instructor :Kashif Mehmood
Binary Arithmetic for DNA Computers R. Barua and J. Misra Preliminary Proceedings of the Eighth International Meeting on DNA Based Computers, pp ,
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Dated: 17 February 2016 Instructor :Kashif Mehmood.
Power distribution and utilization Lecture 2 Instructor :Kashif Mehmood.
Optimizing Hydrogen Pipeline Deployment in Real Geographic Regions Nils Johnson Joan Ogden Yueyue Fan National Hydrogen Association Conference May 4, 2010.
SUBJECT : POWER DISTRIBUTION AND UTILIZATION (PRESENTATION) INSTRUCTOR:KASHIF MEHMOOD.
ANASOFT VIATUS. Challenges Supply chain optimization is necessary for achieving competitive price of final products Synchronization and utilization of.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Investigate Plan Design Create Evaluate (Test it to objective evaluation at each stage of the design cycle) state – describe - explain the problem some.
Peter P. Groumpos Professor, Electrical and Computer Engineering Department University of Patras Eleni S. Vergini PhD Canditate, Electrical and Computer.
Seminar On Energy Audit Submitted To: Submitted By:
Measurable parameters Unit 10
ECE 2202 Circuit Analysis II
Systems Design: Activity Based Costing
Cost Estimation Chapter 5
Systems Design: Activity Based Costing
Layout Optimisation Brings Step Change in Wind Farm Yield
GIS As a Tool for Pavement Management Carlos Chang Albitres
Presentation transcript:

Using GIS to Find Suitable Locations for Solar Power Plants Submitted By: Scott Peterson May 12, 2005 Texas A&M University Department of Civil Engineering Instructor: Dr. Franscisco Olivera CVEN 689 Applications of GIS to Civil Engineering Abstract: Choosing a location for alternative energy technologies is of high importance. Geographic information system (GIS) tools are useful in choosing prime locations for hypothetical power generation facilities. The initial cost of development can be estimated by employing GIS to measure the lengths of new transmission lines and connections. In this project a map showing the average solar input for the state of Texas was utilized as an example of how GIS can help choose locations. Calculating the power loss due to resistance on a point to point basis should also be feasible with GIS tools. Resistance of transmission lines can also be estimated in GIS. In the end it would be possible to make desirability maps based on the time to repayment. In the near term an experienced GIS user is necessary to accomplish these tasks; however, it is feasible to automate the process so that a few simple inputs and some data could automatically be processed to output the desirability map. Methodology: Most efforts to place solar facilities begin with a map showing the solar resources available in the area. GIS data for such a map can be found at the National Renewable Energy Laboratory (NREL). The following figures show the modification of the data available from NREL (Fig 1) so that it was useful in the project. The data was rasterized and smoothed since it is apparent that the sun does not simply stop shining once it crosses and arbitrary line (Fig 2). The rasterized data was then used to mathematically compute the parameters necessary for choosing a site. Estimates for the resistance of given lines were made based on the transmission line allocation in Fig 3, this results in a raster showing the loss of power in kW for every point in Texas (Fig 5). This estimation is based on the average loss for lines of given voltages. The total power available to a load center is then calculated by simply subtracting the resistance loss from the solar input available (Fig 6). The resistance loss as predicted was so low that it did not impact the power available within the tenth of a kW anywhere in the state. Fig 1Fig 2 Fig 3Fig 4 NREL also had a map of high voltage transmission lines available on their site. This information allowed estimates for resistance, new line, and interconnection cost. To delineate the state into cost districts and allocation was made to current power lines (Fig. 3). After the allocation values for new line cost including connection costs were calculated as measured from Dallas (Fig 4). The model used here does not allow multiple load centers to be calculated at once, so throughout the study unless mentioned the measurements are relating to Dallas as the load center. Fig 5Fig 6 Finally with the Resistance losses, and estimates for infrastructure cost it was possible to map out the areas with the highest ratio of power available to capital investment. When simply dividing the values obtained previously a somewhat unusual result was obtained (Fig 7). Subsequently the same analysis was carried out for San Antonio (Fig 8) and El Paso (Fig 9). The results for these other cities suggested that there was a problem in the reasoning behind the model. The two figures are markedly similar which sems to point to the inadequacies of the current model. Fig 10Fig 11 Fig 9 The most obvious influencing factor in this model was the costs associated with new transmission lines and interconnection to already available infrastructure. Due the the negligible impact of resistance in the previous steps this was the only factor that promised to have a large impact. With this in mind another effort was made this time assuming that all new transmission lines would be the same type (as is somewhat logical). The result in this case (Fig 10) showed a very different pattern of desirable areas. This also seemed less than satisfactory in the results. Finally an attempt to average the two methods by assuming that half of the cost was constant and half was determined by the current infrastructure resulted in what looks like a reasonable allocation (Fig 11). Fig 7Fig 8 Conclusion: The location for alternative energy generation stations is of paramount importance. Attempts to simply quantify and model the parameters involved in selecting the best area for development are quite complex. Depending on how great the influence is of certain factors the optimal location can vary significantly. GIS tools offer opportunities to more fully model in advance the factors associated with choosing a site. Current methods of selecting sites could be benefited by work on models accurately predicting the influence of resistance, initial cost, and solar input. More complex models which take into account multiple load centers are also desirable. In order to make a useful tool for planners the current implementation of the predictive model must be improved to more accurately reflect the geographic constraints. Companies in the position to have concrete data on resistance losses, and capital costs will more fully be able to utilize GIS to pick likely sites.