Detector Status J. Brunner 12/09/2014. Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ANTARES, CNRS, D.Lefevre,
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Nummenmaa & Thanish: Practical Distributed Commit in Modern Environments PDCS’01 PRACTICAL DISTRIBUTED COMMIT IN MODERN ENVIRONMENTS by Jyrki Nummenmaa.
Optical Interfaces Lab Last Update Copyright 2014 Kenneth M. Chipps Ph.D. 1.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
Kay Graf University of Erlangen for the ANTARES Collaboration 13th Lomonosov Conference on Elementary Particle Physics Moscow, August 23 – 29, 2007 Acoustic.
Support to the event location in CS Scanning Station Fabio Pupilli LNGS Scanning Team OPERA Collaboration Meeting 20/01/2009 MIZUNAMI.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
DATA TAKING – TESTS OF ABSORPTION LENGTH MEASUREMENTS IN ANTARES MC (group meeting) HAROLD YEPES-RAMIREZ IFIC, 22/10/10 1.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
1 RUN 2008 OPERA events: Status Report M. Ieva on behalf of Bari Emulsion Lab OPERA Collaboration Meeting, April 1st - 5th, 2009.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Antares Slow Control Status 2007 International Conference on Accelerator and Large Experimental Physics Control Systems - Knoxville, Tennessee - October.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
Detector Status J. Brunner 15/10/2014. May 2014 Proudly take over commando on MS ANTARES Astronomy with a Neutrino Telescope and Abyss Environmental Research.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Update on B-analysis Introduction Towards a definition of a limited set of plots for TDR, using all available data. Based on few general.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Interdisciplinary Activity ANTARES
Aachen Status Report: CO2 Cooling for the CMS Tracker
ANTARES.
the CERN Electrical network protection system
SC of KM3 Vidyo meeting of Thursday, February 18
DT Infrastructure: LV, HV, Gas
IBBelle: Status Commissioning at MPP Transport to KEK
Final (?) line_0 configuration (follows steering group consideration 5/5/2004) Line Zero meeting, Nov
Aachen Status Report: CO2 Cooling for the CMS Tracker
LS1 status 17/03/2014.
Status of discussion after 7th meeting
Presentation transcript:

Detector Status J. Brunner 12/09/2014

Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations

Line 3 25/06/14 : Several short power cuts at IMP – Power cut of the Detector at 05:09:07.6 – Breaker of JB1 (Line 3) found open – Trials to rearm failed (S. Henry, M. Ageron) – No power consumption of line

Line 3 – Tests Optical loop measurements – No optical Loop for Line 3 –  all other lines OK Ping of acoustic releases (16/07/14) – Acoustic Releases Line 3 (both) do not respond –  other lines ok (with exception of 1 release) Suspicion : Line 3 is gone … Comex : Janus 2 + Apache ROV – 23-25/07/14, 12h dive on 24/07/14 – Check Line 3 still in place – Try to understand reason for failure – General detector survey

Line 3 – ROV operation Line 3 in place, nothing suspicious Release system ok Connector ok

Line 3 – ROV operation Junction Box inspection IL Cables not under tension Connectors seem ok

Line 3 – ROV operation Junction Box inspection IL Cables not under tension Connectors seem ok

JB Connector Layout

Line 3 Friday 25/07/14 : new trials to rearm breaker Documentation not clear Software gives ambiguous replies Correct RS232 command “ 0SB” – G. Hallewell, S. Henry, JB Rearming without problems ! Spontaneous breaker opening  not understood Acoustic Releases  Coincidence ? Optical Loop  see next slides

Optical margins D. Tezier & M. Ageron : 09/07/14 Comparison to 22/03/2011 : stable within 2dB -1db -6db

Optical margins Line 3 Ligne 3IPTXRX SCM ,818,67 S I ,9317,76 S II ,3216,84 S III ,7116,23 S IV ,3216,54 S V ,32 Reference 2011 : All values well above 30db  important loss since ! Likely reason for absence of optical loop

Line 3 Interlink cable Knot with some object (plastic bag) Try to open the know with Comex submarine  only partially successful Cable bending might explain strong attenuation Attenuation might explain absence of optical loop

Line 5 22/08/14 at 23:49:48 during Run Lines stopped working, no power cut

Line 5 Later that day : 2 lines recovered – JB power cycle Line 5 not recovered – breaker JB16 – Impossible to rearm – 15SB, FSB

Breaker Tests Successfully rearmed Never touched Successfully switched Rearming Unsuccessful

Line 5 – Optical Loop June 17db  August 19db Stable situation Optical continuity No doubt that Line 5 is there  Consider Line definitely lost 23 OMs had been dead already Loss of 52 OMs ( 52/700 = 7.5% )

Asymmetries Hard to interpret  Line 3, nothing special Line 3

Asymmetries Hard to interpret  Line 5  strange jumps Line 5

Asymmetries Hard to interpret  Line 4  change of 100V Line 5

UAC In Line 5Line 3

UPS Situation IMP June 2014 – New batteries ordered for both main UPS at IMP Successfully installed 11/09/14 ! Warranty for upgraded systems 3 years Additional two small UPS (1.6 kW) installed for dedicated equipment – Clock computer  not needed anymore – Card D of JB to avoid shutdown of JB in case of IMP power cut Stable situation reached (hopefully) Open : UPS for detector (~10,000 Euro)

Operations (plots from Damien) Neutrinos per day Averaged over 1 month 2 ½ years Total neutrinos within 2 ½ years

Operations (plots from Damien) Active data taking per month over 2 ½ years Muon rate evolution Over 2 ½ years 2016

Operations (plots from Damien) Muon rate evolution last 3 months Muon rate evolution In 2014

Detector Survey Line 1 survey during ROV operation July 2014 Likely reason for observed efficiency drop Cleaning possible ?  being investigated

Detector Survey Line 1 survey during ROV operation July 2014 Likely reason for observed efficiency drop Cleaning possible ?  being investigated

Next Operations October 8-11 : IFREMER operation “Estime” – Connect Oxygen Probe on BJS with Victor Request to IFREMER for following actions – Disconnect IC at BSS of Line 5 –  try rearming breaker Rearming ok Recover Line 5 At later stage Rearming fails Disconnect IC at JB Try rearming, if ok  exchange IC

Summary Future Sea Operation BJS (IFREMER) : 8-11 October 2014 – Needs ANTARES shutdown during Victor operation November 2014 : MEUST Cable – Needs ANTARES shutdown when arriving onshore

Operation Manager & Antares Shifts Juan Pablo : no official news – seems slowly recovering Present shift schedule stops at 18/12/2014 Have sent out call for Run coordinators – 2 positive replies so far : B. Baret & V. Kulikowski Desperate situation …..