Discussion on Draft Restoration (Black Start)procedures.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Understanding Electrical TransmissionDemonstration A1 A Guide to the National Grid Transmission Model Demonstration A1 How is electricity generated and.
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Workshop on Crisis & Disaster Management of Power Sector
THE ELECTRIC SUB STATION
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
Jay Britton
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
ELG4125 Transmission and Distribution Systems
1 1 “MEASURING THE INFORMATION SOCIETY” Geneva, February GUIDE TO INFORMATION SOCIETY MEASUREMENT Andrew Wyckoff OECD.
Implementing the New Reliability Standards Status of Draft Cyber Security Standards CIP through CIP Larry Bugh ECAR Standard Drafting Team.
Peak RCCo Performance Metrics Draft –November 2013.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Transfer Service Meeting, October 19, 2005 Bonneville Power Administration Long-Term Transfer Service (GTA and OATT) Customer Kick-Off Meeting Garry Thompson.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
SRLDC BANGALORE 20 th March This Presentation Covers … … … Definitions Emphasis of Black Start Restoration in IEGC Causes of Blackouts Restoration.
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP.
Comments on Guidelines on Transmission Tariffs General ETSO welcomes the new draft as positive step –There are many important improvements to the previous.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Distribution Systems-General
. Thematic Working Group 4 Possible Elements – Chapter VI: Constraints, gaps and related financial, technical and capacity needs CGE Workshop to exchange.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
SLIDE 1 VICTORIA REGION RESTART July 2013 PRESENTED BY PETER BIDDLE.
SLIDE 1 SOUTH AUSTRALIA REGION RESTART July 2013 PRESENTED BY PETER BIDDLE.
SLIDE 1 SRAS REVIEW TASMANIA REGION July 2013 PRESENTED BY PETER BIDDLE.
Electrical Power System
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
GC0104 – Demand Connection Code (DCC)
Sub Station.
Electromagnetic Oscillations and Alternating Current
Electromagnetic Oscillations and Alternating Current
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
GUIDELINES Evaluation of National Rural Networks
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Ensuring Security of Supply in Estonian Transmission Grid
Deliverability Maps for 2017 Peaking Capacity RFP
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Chapter 1: Introduction
Electromagnetic Oscillations and Alternating Current
Electromagnetic Oscillations and Alternating Current
5QC Update IPSG Meeting Lisbon, 15 November 2007
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
CHAPTER – 41 A.C. TRANSMISSION AND DISTRIBUTION
National Institute of Wind Energy(NIWE)
Presentation transcript:

Discussion on Draft Restoration (Black Start)procedures

Chapter I- Introduction Chapter II-Details about – The generating stations with Black Start facility –Survival power requirement –Startup power requirement –Generating substations /Substations with Synchronising facility –Railway traction substations Chapter III-System restoration approach Chapter IV Details the procedure

Broad Guide line Adopted In Developing the Procedure Geographical areaSystems coveredSection covering the procedure AndrapradeshAndrapradesh and NTPC Ramagundam 4.1 KarnatakaKarnataka and Kaiga APP4.2 KeralaKerala and Rajeev Gandhi CCPP 4.3 TamilnaduTamilnadu, Pondy, Neyveli TSII,TSI Epansion,MAPP 4.4

Broad Guide line Adopted In Developing the Procedure Each state has been divided in to subsystems on the basis of the natural separation taking place during disturbances Source for providing startup powers has been identified for each subsystem both from with in the subsystem and also from outside the subsystem for early restoration of the power system.

Procedure details the following Source of startup power in case of – total blackout of the region, – blackout of the entire state system –blackout of the subsystem alone Identifying the loads for each subsystem Points of synchronization with other sub systems Actions to be taken by various generating stations and substations.

The procedures given in this document are general in nature and provide a guideline for the restoration team Depending on the availability of transmission elements, Type & size of Generators and and the extent of blackout, restoration team, on real time basis, should adopt the best procedure suited for the situation Based on this document Constituents have to prepare station wise detailed switching instructions so that the operators will have clarity and restoration will be faster

Issues to be clarified AP Subsystem I –During partial blackout of Ramagundam extension of startup power supply through 132kv system from KTS I and II AP Subsystem II –Self starting of VGTPS II Karnataka Subsystem III –Capacity of Almatti generators for charging lines up to Raichur Tamilnadu system Subsystem I –Capacity of Valathur generators for charging lines up to TTPS

Information Required Maximum, Minimum, Average MW and MVAR loading of all ICT’s of 400KV and 220KV substations Substations feeding Traction stations with phase details

Comments of constituents Ramagundam –Since the voltage will be high during extension of Startup power AP should provide some loads to control the voltage at Ramagundam. –Synchronisation of this subsystem with the other subsystem should be done only at 400 KV Level AP –Subsystem 5 and 6 to be merged in to one subsystem –VGTPI can be started using VGTPII DG set –VGTPII can not be self started –Priorities of various alternatives suggested to be reviewed by AP –Chittoor to be included in the startup plan

Comments of constituents Karnataka –Almatti can not extend startup power to Raichur Kaiga –Nagjheri-Hubli-Narendra-Kaiga path as a third alternative start up path for Kaiga Kerala –No change proposed Tamilnadu –Valathur-Paramakudi-TTPS can be considered as one alternative startup path for TTPS –List of stations with Startup facility and synchronisation facility updated –Madurai PCL can not be used as a startup facilitator –Singarpet and SP Koil are directly connected and can be used for extending Startup power to MAPS