New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Krish Ramamurthy Chief, Division of Permits Bureau of Air Quality
Steffes Engineered Flare System
Hydraulic Fracturing and Air Issues in the Oil and Natural Gas Sector
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Ramsay Group Ltd. is a leading provider of safe, reliable and effective waste gas combustion systems. Our incinerators allow our customers to operate.
1 Shale Gas Development/Production Activities and Air Quality Mike Abraczinskas, Deputy Director North Carolina Division of Air Quality Shale Gas Development/Production.
RICE MACT and Oil Analysis
The Reciprocating Internal Combustion Engine (RICE) MACT Summary
RICE MACT 40 CFR 63, Subpart ZZZZ SI Source Requirements 7/18/2013.
Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013.
Oil and Gas Air Quality Authorizations in Texas
Air Permitting in Louisiana & Texas a guide to compliance requirements presented by: Shonta’ Moore, MS Air Permitting Specialist - Environmental Division.
NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior.
Tuesday Oct. 7, 2014 Implementation of Permit Exemption Criteria Category No. 38 Tom Corbett, Governor Dana Aunkst, Acting Secretary.
New Emission Rules for IC Engines Presented by Scott Wallace Devon Gas Services, L.P.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
April 15, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Standardized Authorizations (Permits by Rule & Standard Permits)
NCMA Workshop March 19 and 24, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
Oil & Gas Permitting Issues and Guidance Revisions Statewide and Jonah/Pinedale Development Area Mark Smith Wyoming DEQ/AQD.
WESTAR Oil & Gas Conference October 2008 Lori Bocchino Wyoming Oil & Gas Permitting and New Rule/Policy Revisions.
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
The New Federal NESHAP Air Quality Rule for Oil and Natural Gas Area Sources Susan Bassett, Air Quality Team Leader URS Corporation Rocky Mountain EHS.
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
Mustang Watchdog April 22, 2014
Pinal County Air Quality Workshop Casa Grande – January 14, 2014 Kale Walch & Anu Jain – Permit Engineers.
1 Improving Environmental Protection and Reducing Administrative Burden North Carolina Division of Air Quality Improving Environmental Protection and Reducing.
The Cost of Clean Air FEES REVISED: 2011 NACAA Membership Meeting Cleveland, OH October 5, 2011.
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
Our Vision – Healthy Kansans living in safe and sustainable environments.
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy.
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
Environmental and Clean Air Regulations M IDSTREAM E NERGY L AW C ONFERENCE : M EETING THE D EMAND FOR I NFRASTRUCTURE H OUSTON, T EXAS December 7, 2012.
Navajo Nation Operating Permit Program
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
Fuels For Schools General Air Quality Considerations Diane R. Lorenzen, P.E. Montana Department of Environmental Quality October 17, 2007.
STATEWIDE WORKSHOP ON THE CALIFORNIA MOTOR VEHICLE EMISSIONS STANDARDS INCLUDING GREENHOUSE GASES August 23, 2007 Department of Environmental Protection.
SCAQMD Air Quality Permitting for Emerging Technologies Jay Chen, P.E. South Coast Air Quality Management District November 4, 2009 Southern California.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
1 Permit Exemptions Rule Revisions North Carolina Division of Air Quality Permit Exemptions Rule Revisions North Carolina Division of Air Quality Air Quality.
Aggregation Issues Jesse Lovegren, Ph.D. Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
1 Addressing Air Quality Impacts from Oil and Gas Development in Colorado WESTAR Conference October 23, 2008 Rose Waldman Colorado Air Pollution Control.
1 Region 5 Enforcement Approach George Czerniak June 13, 2007 NACAA Enforcement and Compliance Workshop.
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality.
New Air Quality General Permit G70-A Overview WVONGA Air Permitting Issues Seminar September 12, 2013 Oglebay Resort, Wheeling, WV Laura Jennings Engineer.
Air Quality Division Emissions Inventories SAW: May 3, 2016 Page 1 Point Source Emissions Inventories Air Quality Division Susan Wampler May 3,
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifications Citizens Advisory Council March 15, Tom Wolf, Governor John Quigley,
West Virginia Natural Gas Well-Site General Permit: A Quick Look West Virginia Division of Air Quality Fred Durham Director.
Updates from Ohio EPA DAPC
General Permits and General Operating Permits under construction
EPA’S New Source Performance Standard (NSPS)
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Simple but Complicated Air Quality Permitting for Generators
GENERAL PERMITS ACE ACADEMY / May 9, 2018.
Air Permitting General Permit Updates
Details of the Regulatory Framework
Air Quality Permitting Guidelines for Industrial Sources
The Air Emission Landscape for Engines Coalbed Methane Association of Alabama 29th Annual Meeting May 28, 2015.
Air Quality Permitting Guidelines for Industrial Sources
Presentation transcript:

New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012

Air Quality permits are required for the following:  Subject to any substantive requirement  Rule 6 requires a rule 13 permit for a combustion device (incinerator)  Criteria pollutants: PTE of 6 lb/hr and 10 tpy or 144 lb/day of each individual pollutant  Hazardous air pollutants: PTE of 2 lb/hr or 5 tpy of HAPs on an aggregated basis  Toxic air pollutants: Any TAP with PTE in amount greater than shown in Table 45-13A 10/24/2012 DAQ General Permit G-70A

What is an Air Quality General Permit? General permits under 45CSR13 authorize the construction, modification or relocation of a category of sources by the same owner or operator or involving the same or similar processes or pollutants upon the terms and conditions specified in the general permit 10/24/2012 DAQ General Permit G-70A

Why is the G-70A General Permit being developed?  General Permit G-70A is being developed for natural gas well affected facilities and natural gas production at the well pad What are the benefits?  Streamlined process  Consistent requirements  Reduced permitting time  Lower cost for the application 10/24/2012 DAQ General Permit G-70A

 G-70A general permit language will be the same for all facilities  G-70A general permit registrations will be unique for each facility  G-70A will be a Class II General Permit  Class II General Permits require the registrant to publish legal advertisement with a 30-day public notice period DAQ General Permit G-70A 10/24/2012

Is the G-70A general permit required for NG well completion operations? No, only the two-day notification is required. Extended use of completion combustion devices however, may require additional permitting. DAQ General Permit G-70A 10/24/2012

Emission sources included:  NG well affected facility  Storage vessel affected facility  Pneumatic controller affected facility  In-line heaters  Gas Production Unit Burners  Heater Treaters  Natural Gas fired Engines  Tank Truck Loading DAQ General Permit G-70A 10/24/2012

Air Pollution Control Devices Included:  Completion combustion devices  Enclosed combustion devices: Thermal vapor incinerators, catalytic vapor incinerators, boilers, process heaters  Vapor recovery devices: Carbon Adsorption Systems Vapor Recovery Systems  Flares  For engines: NSCR, SCR, Catalytic Oxidation DAQ General Permit G-70A 10/24/2012

State Air Pollution Regulations include:  45CSR2 (Control of PM from fuel burning units)  45CSR4 (Prevention & control of objectionable odor)  45CSR6 (Control of PM & smoke from flares, etc.)  45CSR10 ( Control of SO 2 from fuel burning units)  45CSR13 (Permits)  45CSR16 (NSPS requirements)  45CSR22 (Fee program)  45CSR30 (Title V) - ONLY FOR DEFERRED, NON-MAJOR SOURCES  45CSR34 (Emission Standards for HAPs) DAQ General Permit G-70A 10/24/2012

Federal Air Pollution Regulations include:  NSPS, Subpart OOOO (Standards of Performance for Crude Oil and Natural Gas Production, Transmission & Distribution)  NSPS, Subpart JJJJ (Standards of Performance for Stationary Spark Ignition Internal Combustion Engines)  MACT, Subpart ZZZZ (National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion Engines) DAQ General Permit G-70A 10/24/2012

What will NOT be included:  Any NG production facility that is a “major source”  “major source” - PTE 100 tpy of criteria pollutant, or 10 tpy individual HAP, or 25 tpy Total HAPs  Dehydration units  NG processing plants  NG sweetening plants  NG compressor stations  NG transmission and storage facilities DAQ General Permit G-70A 10/24/2012

Next Steps:  G-70A will undergo public notice prior to being issued. The public notice will appear in Charleston Newspapers, Dominion Post, The Herald Dispatch, The Wheeling Intelligencer, The Journal, the State Resister and possibly more.  G-70A will also be posted to DAQ website during public review period.  G-70A general permit, registration applications, instructions and forms will be available when issued at 10/24/2012 DAQ General Permit G-70A

Future Plans:  DAQ plans to update G-35A (NG compressor stations with Glycol dehydration units) to include NSPS, Subpart OOOO language and amended MACT, Subpart HH language  DAQ plans to update G-30D (NG compressor stations) to include NSPS, Subpart OOOO language  DAQ plans to update G-33A (engines > 25HP and < 500 HP)to include NSPS, Subpart OOOO language Other DAQ NG General Permits 10/24/2012

Laura Jennings Division of Air Quality th Street, SE Charleston, WV Phone: ext /24/2012 Questions?