ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.

Slides:



Advertisements
Similar presentations
16 May06 1 Integrated Shipbuilding Environment 4 (ISE 4) Demonstration Overview Presentation for Seattle NSRP Panel Meetings May 16, 2006 Ron Wood Burt.
Advertisements

27 Apr ‘06 1 STEP translator for distribution systems for ShipConstructor ISE-2 & ISE-3 follow-up CATIA V4 to ShipConstructor piping demo ShipConstructor.
ISE 6 Phase 2 Demo Scenario Nov 20, Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat.
Development of ISE Interoperability Modules
Warship 2010 The Application of Integrated Computing Technology to the Design, Construction and Lifecycle Support of Warships The Royal Institution of.
QAD Configurator Gary Wasserman MaryAnn Guthrie 11-October-11.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
A Linguistics-Based Approach for Use Case Driven Analysis Using Goal and Scenario Authoring Vijayan Sugumaran Oakland University Rochester, Michigan, USA.
NSRP Panel Meeting – San Diego Presented by: Bryan J. Miller Topgallant® Product Data Management and Collaborative Software for Shipbuilding.
Designing new systems or modifying existing ones should always be aimed at helping an organization achieve its goals State the purpose of systems design.
Welcome to CMPE003 Personal Computer Concepts: Hardware and Software Winter 2003 UC Santa Cruz Instructor: Guy Cox.
Airbus flight control system
Ship Common Information Model (SCIM)
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Systems Analysis and Design: The Big Picture
Long Term Retention of Product Model Data
ENTERPRISE INFORMATION MODELING Majid Mohammad Sadeghi Ali Vatankhah Supervisor: Reza Vatankhah Professor : Dr. Hashemipour.
Vice President, Engineering NSRP Executive Director
Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
Integrated Shipbuilding Environment
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) ISE4 Project Demonstration April 27, 2006.
Chapter 2 – Enterprise Systems Accounting Information Systems 8e Ulric J. Gelinas and Richard Dull © 2010 Cengage Learning. All Rights Reserved. May not.
1 Improving Interoperability through the use of ISO Presented by : Ron Wood Date:August 25, 2005.
STEP Shipbuilding Demonstration Highlights Integrated Shipbuilding Environment 4 (ISE 4) 26 June 2006 Ron Wood.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
Navy Ship Advanced Modeling & Simulation - NSRP Projects Navy Ship Advanced Modeling & Simulation - NSRP Projects.
1 Integrated Logistics Environment (ILE) Project Presented by : Dr. Burton Gischner Date:May 3, 2011 NSRP Joint Panel Meeting San Diego, CA.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Leading Edge Architecture for Prototyping Systems An Overview.
Design Flow 1 Mission Req (ASSET) Initial design by space Detailed Design (Equip by Comp) Zone model Compartmention Model List of comp + req Compartmentation.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
3 February Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE Overview Presentation (to.
Using and modifying plan constraints in Constable Jim Blythe and Yolanda Gil Temple project USC Information Sciences Institute
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Ben Kassel NSWCCD Ted Briggs Intergraph Corporation An Alternate Approach to the Exchange of Ship Product.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
ISE4 Integrated Demo Ver 2 May 11, ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull.
7 Aug Integrated Shipbuilding Environment (ISE) ISE-6 Phase 2 DDG 1000 TDWG Collaboration Data Module Code (DMC) Naming Overview.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
ISE6 Context Schema Overview
ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
ISE6 Demo 11/14/2007 Ft Lauderdale Meeting Discussion.
1 DLA Aging Systems Program: Technology Investment for Sustainment Cliff Wolfe Program Manager DSCR-VE March 2005.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
March 24, ISE-6 Phase 2 Demo March 24, 2009.
1 S HIP T ECH 2011 A S HIPBUILDING T ECHNOLOGIES I NFORMATION E XCHANGE Total Ownership Cost/Quality/Energy Efficiency Completion and Validation of the.
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
1 Long Term Retention of Product Model Data Ben Kassel Naval Surface Warfare Center Carderock Division Distribution Statement A : Approved For Public Release;
JORGE JUAN RODRÍGUEZ PEDRO GARIBI DESCRIPTION OF THE IMPLEMENTATION OF WP6 TO 9 IN DELIVERABLE D9.1.
Recommended analysis task 2 MGT703 STRATEGIC MANAGEMENT DR JANE CRAIG.
Eating Our Own Caviar… Using Active Dashboards and WebFOCUS Magnify to Manage Support Operations Dan Ortolani VP Advanced Technology Services.
MVDC Collaboration MVDC Issues and Viability of Red Demo in Philadelphia.
Systems Analysis and Design
Fundamentals of Information Systems, Sixth Edition
Upgrading to S3D Technology: Automation API
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
, editor October 8, 2011 DRAFT-D
System Reengineering Restructuring or rewriting part or all of a system without changing its functionality Applicable when some (but not all) subsystems.
Shipboard Cable Trays 07/24/19 Atlanta, GA
Presentation transcript:

ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005

ISE4 Future Ship Acquisition Demo Proposal2 Revised Arrangements Demo Scenario Initial ASSET Arrangement + Requirements (LEAPS) Build Yards Design Agent AP 216 Hull Initial Arrangement Complete Arrangement + Equipment Vulnerability Analysis (LEAPS) Vulnerability Report Engineering Analysis Steel Processing

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal3 ISE4 Revised Future Ship Acquisition Demo Scenario Mission Requirements and Initial Arrangements provided by the Navy via ASSET –TWR 841 will be used as input TWR 841 Model Captured in FORAN to be treated as Concept Design –Send AP216 file to Navy (ASSET) for Analysis ASSET will pose new mission requirements and generates an initial Arrangement (AP215 Model) –List of Compartments with Requirements plus possibly some minimal Geometry Arrangement returned to Design Agent (FORAN) which sets up compartmentation and generates updated AP215 file (Part 21) Demonstrate Initial Electrical System design (KSSI) –Electronic System in Pilot House Navy selects Diesel Engine which fulfills base requirements and incorporates into ship contract

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal4 ISE4 Revised Future Ship Acquisition Demo Scenario cont’d. Two build yards (CAD Systems: ISDP and TRIBON) will be doing a collaborative design and are awarded a preliminary/detailed design contract –TRIBON will design Topside –ISDP will design below Decks Shipyards add Diesel to CPC Catalog and receive AP203 file Arrangements Model is transferred to TRIBON (P28) via AP215 exchange –Transfer requires Mediators between Part 28 and Part 21 files Designs are created in ISDP, and TRIBON –Arrangements transferred via AP218 to LEAPS and COMMANDS for Analysis –COMMANDS creates mesh and sends to Analysis tools (e.g. PATRAN, ABACUS) –FEM Analysis performed on revised model of Engine Room –Analysis report generated Design Agent sends Arrangements Model to LEAPS for Vulnerability Analysis

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal5 ISE4 Revised Future Ship Acquisition Demo Scenario cont’d. Extract Structure for Manufacturing (Intergraph) Develop neutral structural manufacturing model (ISPE) Generate yard-specific manufacturing data (EB, Avondale) –Compare EB and Avondale manufacturing outputs Ship check existing TWR design –Provide scanned shots of Engine Room from Ship Check Data Capture Project –Emphasize synergy between these NSRP funded projects, even though Demo is separate and not part of Ship Check Data Capture

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal6 Concept Design (ASSET/LEAPS) Preliminary Design (FORAN) Collaborative Detailed Design (ISDP) (TRIBON) (Electrical – KSSI) Production (Steel Processing) Operations & Maintenance (Ship Check Results) Navy Analysis (LEAPS) Engineering Analysis (COMMANDS) Flowchart of Revised New Design Demo Scenario

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal7 ISE4 Alternate Demo Proposal Initial Arrangement FORAN LEAPS Below Decks Arrangement ISDP – Des. 1 Topside Arrangement TRIBON – Des. 2 Analysis Tools PATRAN ABACUS etc. COMMANDS Results Des. 1 Results Des. 2 NAVSEA Proposes Concept Design Alternative Proposals Analyzed STEP Description of Selected Model Transferred for Steel Processing See EAD S

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal8 Engineering Analysis Demo Scenario AP 203 P21 Shipyard (Add to CPC, CAD) Vendor Equip arrangement Ship Product Model (ISDP) AP 227 P28 Equip arrangement AP 215 P28 Compartmentation AP 216 P21 AP 218 P28 AP 209 P28 CPC CAD Parts Analysis (COG, weight, location) AP 209 /218 P28 GUID, doc URL Feedback AP 209 P28 EADS Note: Feedback loop only for winner (ISDP) Equipment exchange precedes competition

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal9 Mediators Required / PLM ARM AIM P28 P21 P28 P21 P28 P21 Processing Capability Currently Available P28 Higher Priority (Needed as Soon as Possible) P28 Lower Priority (Possibly Optional)

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal10 Backup Slides

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal11 TWR Propulsion Engine (Caterpillar 3512) Model

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal12 TWR Reduction Gear Model

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal13 Demo Scenario Issues Scenario has analysis software used to discriminate among three proposed designs –More realistic than usual Demo Scenarios Must find way to work Electrical and ISPE (Steel Processing) more smoothly into Demo Steel Processing should be easily integrated with the Arrangements and Analysis scenarios, but we must determine what can be exchanged from this task

May 23, 2005ISE4 Future Ship Acquisition Demo Proposal14 Notional Mediators Required APARM -> AIMAIM-ARMARM-> 209 AIM P21 216Eng Analysis 215Arrangements 218Eng Analysis 227Eng Analysis 209Eng Analysis??