CPPP Stakeholder Meeting Springfield, Missouri November 18, 2010 Associated Electric Cooperative Inc.

Slides:



Advertisements
Similar presentations
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
Advertisements

EU Developments Transmission Workgroup 6th October 2011.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Public Service Company of New Mexico
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Queue Reform at the Midwest ISO NARUC February, 2008.
October 30, 2014 Terry Wolf, Manager of Transmission Services.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
September 10, 2014 Associated Electric Cooperative 1 Joe Wilkinson Director, Member Services & Corporate Communications.
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Interconnection of Distributed Generation
Clean, Reliable, and Low Cost Energy for the for theCaribbean December, 2006 Confidential.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
Transmission Planning at the California ISO September 10, 2015.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Updated 1/28/2011.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
1 Benefits of Transmission Ownership Bob Johnston CEO of MEAG Power.
G&T Update – Western Farmers Electric Cooperative OAEC MR/PR Fall Meeting (2015)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
November 16, 2012 Terry Wolf, Manager of Transmission Services.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Nebraska Wind Conference Wednesday, November 16, 2011
Status Update for Reliability/Market Power Mitigation Assessment
SEARUC Conference Little Rock, AR June 4, 2007
I-5 Corridor Reinforcement Project
Overview of Northwest Wind Integration Action Plan
Unscheduled Flow Administrative Subcommittee Report
SunZia Project Description
WECC Annual Meeting 9/11/2018 Cameron Warren
2017 Attachment O Customer Meeting
2018 Attachment O customer meeting
2016 Attachment O True-up customer meeting
Unscheduled Flow Administrative Subcommittee Report
WECC Annual Meeting 9/11/2018 Cameron Warren
Presentation transcript:

CPPP Stakeholder Meeting Springfield, Missouri November 18, 2010 Associated Electric Cooperative Inc.

CPPP Actual Area

Agenda IntroductionIntroduction AECI Planning OverviewAECI Planning Overview TVA Planning UpdateTVA Planning Update EKPC Planning UpdateEKPC Planning Update BREC Planning UpdateBREC Planning Update Potential Regional ProjectPotential Regional Project Inter-Regional Planning UpdateInter-Regional Planning Update oEIPC oSIRPP oAECI – SPP Joint Planning oFERC/NERC/EPRI/DOE Updates General DiscussionGeneral Discussion

Introduction FERC Order 890 requires non-jurisdictional entities to participate in a regional planning process.FERC Order 890 requires non-jurisdictional entities to participate in a regional planning process. To meet this requirement EKPC, BREC, TVA and AECI formed CPPP.To meet this requirement EKPC, BREC, TVA and AECI formed CPPP. BREC evaluating options.BREC evaluating options.

AECI Planning Overview

AECI service area

Member owned and controlled Three tiered system Three tiered system AECI delivers power to AECI delivers power to 6 regional G&Ts 6 regional G&Ts G&Ts serve 51 G&Ts serve 51 Distribution Coops Distribution Coops Dist Coops serve Dist Coops serve 850,000 meters 850,000 meters

AECI/Member G&T cooperatives’ Transmission Statistics Miles of line – Approximately 9,500 (69 kv and higher)Miles of line – Approximately 9,500 (69 kv and higher) Substations -750Substations -750 Integrated NetworkIntegrated Network –174 Interconnections –21 Interconnection Agreements

AECI uses a mix of generating resources GAS/OILpeaking 655 MW COAL 2,619 MW GAScombined-cycle 1,603 2,143 MW HYDROELECTRIC 478 MW Unionville - 45 MWEssex MWNodaway MW Holden MW St. Francis MW Thomas Hill - 1,153 MW Chamois - 68 MW GRDA Unit MW New Madrid - 1,200 MW Chouteau ,062 MW Dell MW WIND GENERATION 307 MW

AECI TRANSMISSION PLANNING PROCESS Electric Load Forecast Study (ELFS) conducted in even numbered yearsElectric Load Forecast Study (ELFS) conducted in even numbered years Coordinated Long-Range Member G&T System Plan conducted in odd numbered yearsCoordinated Long-Range Member G&T System Plan conducted in odd numbered years

AECI Long Range Plan Project Update

‘09- ‘19 AECI LRP Project Update (CONTINUED) Since January AECI Board has passed 27 issue papers related to EHV/Primary System ImprovementsSince January AECI Board has passed 27 issue papers related to EHV/Primary System Improvements Approx. $250 M of EHV/Primary System currently in some phase of constructionApprox. $250 M of EHV/Primary System currently in some phase of construction Approx. $120 M of this allocated for Chouteau 2 generation and additional 345 kV capacity between Oklahoma and MissouriApprox. $120 M of this allocated for Chouteau 2 generation and additional 345 kV capacity between Oklahoma and Missouri

Coordinated Long-Range Member System Plan Details October ’10 – Develop NT (years 1 or 2) & LT (9 to 10) loadflow cases from LTSG 1. October ’10 – Develop NT (years 1 or 2) & LT (9 to 10) loadflow cases from LTSG 2. November ’10 – Incorporate Electric Load Forecast Study results into loadflow cases 3. January ’11 – Identify problems/send preliminary results

Coordinated Long-Range LRP (Continued) February ’11 – Hold stakeholder meetings 4. February ’11 – Hold stakeholder meetings 5. August ’11 – Solutions – present to stakeholders 6. September '11 – Final Report 7. October '11 - Member G&T Board Approvals 8. December '11 – AECI Board Approval

Questions?

AECI-SPP Joint Planning

Various Working Groups (TWG, ESWG, MDWG, etc.)Various Working Groups (TWG, ESWG, MDWG, etc.) STEPSTEP ITP 20ITP 20 ITP 10ITP 10 ITP Near Term Assessment – Not sure if it has a nameITP Near Term Assessment – Not sure if it has a name Aggregate StudiesAggregate Studies Generation Interconnection Affected SystemGeneration Interconnection Affected System Special Study/Coordination as needed to address localized issuesSpecial Study/Coordination as needed to address localized issues Twice yearly meetings addressing Operational - Planning topicsTwice yearly meetings addressing Operational - Planning topics

Questions?