ERCOT Staff Analysis of Weather Sensitivity Code Changes February 8, 2005.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Results from the 2013 Survey of LSEs to Obtain Retail DR and Dynamic Pricing information Public Summary Frontier Associates LLC June
ERCOT Analysis of 2005 Residential Annual Validation Using the Customer Survey Results ERCOT Load Profiling Presented to PWG - October 26, 2005.
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015.
ERCOT Staff Comments Regarding the Proposed Suspension of Residential 2005 Annual Validation RMS Presentation August 10, 2005.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
-- Presentation from PWG -- Workshop on Profile ID Assignment and Annual Review Process June 23, 2005.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
Why Normal Matters AEIC Load Research Workshop Why Normal Matters By Tim Hennessy RLW Analytics, Inc. April 12, 2005.
Residential Survey. Survey Objectives Develop a more accurate algorithm to predict the presence and use of electric heat for residential customers. Algorithm.
SCR 740 Implementation of Web Services for ESIID level data Jackie Ashbaugh EAA Data Management.
1 Update from ERCOT Retail Market Services to RMS Additional Material February 12, 2004.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
1 AEIC Annual Load Research Conference September 12, Reno, NV ERCOT Residential Profile ID Assignments – Dealing with Assignment Accuracy and Migration.
Profiling Working Group January 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January 11, 2006.
1 Presented to ERCOT Retail Market Subcommittee January 9, 2002 Profiling Working Group Darryl Nelson, Chair Load Profiling Operating Guides (LPOG)
1 ERCOT LRS Detail Sample Design PWG Presentation April 24, 2007.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
Residential Survey Task Force Update to RMS April 12, 2005.
Advanced Meter Settlement Background and NPRR. Overview PUC Rule (wholesale settlement) Project – Wholesale Settlement Project Filed Deployment.
Profiling Working Group December 11, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting December 11, 2003.
April 15, 2003 UFE 2002 ANALYSIS. April 15, 2003 LOAD AND UFE – ERCOT PEAK 2002 This is a graphic depiction of load and UFE on the ERCOT Peak Day for.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
June 10, 2009 RMS PR90006, Commercial Systems Information Lifecycle Management (ILM) Hope Parrish, ERCOT.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
Demand Response Status Report Calvin Opheim October 9, 2007.
Settlement Accuracy Analysis Prepared by ERCOT Load Profiling.
1 ESI ID SERVICE HISTORY AND USAGE DATA EXTRACT SYSTEM CHANGE REQUEST (SCR 727) February 24, 2003.
1 UFE Workshop Sponsored by COPS October 19, 2004.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
DSWG – March 9, 2015 Four-CP Response in ERCOT Competitive Area Carl L Raish.
Comparison of New Load Profile Models 14-Month Models vs 21-Month Models ERCOT Load Profiling Staff.
1 History of UFE (shortened version of presentation provided at UFE Taskforce Workshop on 9/14/2004) UFE Taskforce Meeting February 21, 2006.
Load Profiling Working Group RMS Presentation 8/01/2002 by Ernie Podraza Reliant Energy Retail Group Chair PWG.
1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012.
MARS 867_03F ROR vs. Settlement vs. 810 Scenarios ERCOT September 2008.
1 ERCOT Load Profile Transition Option 1 – 4 Analysis August 21, 2006.
AMS Indicator ERCOT Recommendations
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
Profiling Working Group April 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting April 14, 2004.
DEWG Meeting Summary Report to COPS 09/10/2007 Jim Galvin- Luminant Energy.
1 New MO Projects June COMS Extract, Report & Web Services Monitoring & Usage Statistics Jackie Ashbaugh.
PRR 568 – Day 17 to Day 10 Analysis Implementation Recommendation TAC December 2005.
DSWG - June 25, Four-CP Response for Transmission- and Distribution- Connected ESIIDs in ERCOT Competitive Area Carl L Raish.
PRR 568 – Settlement Timeline September day Analysis COPS October 25, 2005.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting December 3, 2007.
1 ERCOT COPS Round 2 Sample Design Review April 10, 2007.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
PWG Long Term Strategy How do we maximize scarce resources?
Demand Response Options Review Carl Raish November 27, 2007.
PWG Demand Response Follow Up Jackie Ashbaugh October 23, 2007.
Hypothetical Examples of How Residential Photovoltaic (PV) ESI IDs Could be Settled ERCOT Load Profiling.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting June 11, 2007.
PWG Profiling Working Group December 18, RMS Presentation by Ernie Podraza, PWG Chair Annual Validation 2002 DLC Implementation.
Distributed Renewable Generation Profiling Methodology ERCOT Load Profiling March 4, 2008.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
-- Presentation from PWG -- Profile ID Assignment and Annual Review Process November 17, 2005.
02/01/2008 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
Data Processing Module 4.
Principal Load Profiling and Modeling
Reflecting Losses in DR within ERCOT August 22, 2012
Presentation transcript:

ERCOT Staff Analysis of Weather Sensitivity Code Changes February 8, 2005

2 Analysis Background Analysis based on currently active IDRs Includes both NOIE and IOU ESIIDs Includes prospective changes based on ERCOT’s 2004 assignment review Analysis period is market open to present

3 Current Weather Sensitivity Code Assignments and Change History About 28% of current ESIIDs classified as weather sensitive, 23% for IOUs and 63% for NOIEs About 26% of current ESIIDs have had one or more code changes since market open

4 Weather Sensitivity Code Changes 80% of IOU, 70% of NOIE ESIIDs with no assignment changes About 14% of current ESIIDs are changing as a result of 2004 review

5 Year-by-Year Weather Sensitivity Code Changes 2003 had a significant migration (88% of changes) to WS 2004 had a significant migration (69% of changes) to NWS 57% of ESIIDs with 2004 changes were reverting to pre-2003 code 2002 WS Review was not Performed by ERCOT

6 Potential Action Items Continue using current methodology … current data loading rates lower the impact of applying proxy days Assign all IDRs to WS … WS proxy day routine okay for most ESIIDs and falls back to NWS proxy day if no suitable days are found Assign all IDRs to NWS … reduced processing for proxy day routine, may not introduce that much inaccuracy However … if Initial Settlement is moved from 17 to 10 days, the proxy day routine will be invoked more often … a less accurate routine will increase profiling error Conduct analysis to improve WS assignment methodology –Look at R-square distributions –Use multiple-year window for the analysis –Incorporate additional variable(s) e.g. summer ratio, kW/kWh minimums –Outlier analysis e.g. some ESIIDs have large year-to-year changes in R-square –Apply dead-bands