Chatfield Reservoir Water Budget Jim Saunders and Jamie Anthony WQCD, Standards Unit 13 Dec 2007.

Slides:



Advertisements
Similar presentations
What? Remote, actively researched, monitored, measured, has a huge impact on global climate and is relatively cool?
Advertisements

Unit Hydrographs Ch-7 (Streamflow Estimation)
PROCESS-BASED, DISTRIBUTED WATERSHED MODELS New generation Source waters and flowpaths Physically based.
Estimating Allowable Phosphorus Load to Chatfield Reservoir Jim Saunders WQCD Standards Unit 10 April 2008.
Michael J. Brayton MD/DE/DC Water Science Center Hydrologic Controls on Nutrient and Pesticide Transport through a Small Agricultural Watershed, Morgan.
Hydrograph Interpretation.
Transforming the Runoff
Water Resources Planning and Management Daene C. McKinney River Basin Modeling.
Confluence at the Confluence Chatfield Watershed Authority September 22, 2014.
Perched River Seepage ESHMC Meeting January 13-14, 2009 Stacey Taylor.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
Hydrology & Water Resources Engineering
Hydrologic Statistics
WaterSmart, Reston, VA, August 1-2, 2011 Steve Markstrom and Lauren Hay National Research Program Denver, CO Jacob LaFontaine GA Water.
Simulating the Hydrologic Response
Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis.
Statewide Map-based IDF Analysis Norman Gonsalves for Caltrans.
Flow Estimation in the Wood River Sub-Basin. Study Motivation To estimate an historical record at the mouth of the Wood River. –Enables comparison of.
Return Flows Discussion Continued ESHMC Meeting 6 May 2008 Stacey Taylor.
The Colorado Surface Water Supply Index (SWSI) Performance Since 1981 Nolan Doesken Colorado State Climatologist Colorado Climate Center Colorado State.
Rhode Island Water Resources Board Water Availability An Overview of Water Supply and Water Resources May 5, 2011.
Nonpoint Source Pollution u Some basic principles u Example study of total pollution loads in the Corpus Christi Bay System –rainfall-runoff relationship.
Estimating Future Floods to Manage Flood Risk Michael Anderson California State Climatologist Extreme Precipitation Symposium 2012.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
HEC-HMS Runoff Computation.
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
 These slides were presented to the Hood River Basin Water Planning Group on May 1, 2013 by Jon Rocha and Jennifer Johnson.  Slides contain animations.
1 Upper Mississippi River System Flow Frequency Study Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers Alexandria, Virginia.
Engineering Hydrology (ECIV 4323)
Evaluation of Load Translator for Chatfield Reservoir Jim Saunders WQCD Standards Unit 14 February 2008.
Review of SWRCB Water Availability Analysis Emphasis on Dry Creek Water Availability Analysis.
MPCA Groundwater Roles
Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011.
PID. The proportional term produces an output value that is proportional to the current error value. Kp, called the proportional gain constant.
Flatford Swamp Hydrologic Restoration Feasibility Study (H089)
What is OASIS? Water resources simulation/optimization model
Total Loads and Water Quality in the Corpus Christi Bay System Presented by: Ann Quenzer and Dr. David Maidment Special Thanks: Corpus Christi Bay National.
Chatfield Reservoir Hydrologic Scenario Development Jim Saunders WQCD Standards Unit 13 March 2008.
Chatfield Reservoir Phosphorus Budget Jim Saunders and Jamie Anthony WQCD, Standards Unit 13 Dec 2007.
U.S. Department of the Interior U.S. Geological Survey Montana StreamStats An overview of Montana StreamStats and methods for obtaining streamflow characteristics.
Christie Beeman and Jeff Haltiner Philip Williams & Associates Hydrograph Modification: An Introduction and.
Water Resources Planning and Management
Basic Hydrology: Rainfall-Runoff – I
In the City of Austin Bryan Barnett. Overview Atrophic Effects on the Hydrologic Cycle Potential Effects on the Surface Excessive Run-off High transport.
CE 374 K – Hydrology Second Quiz Review Daene C. McKinney.
March Urban Flood Risk Management. March Objectives Understand the Nature of Flooding & Flood Damage Alleviation Understand the Nature of.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
Blockhouse Ranch: A Dam Feasibility Study Haley Born November 17, 2011.
Trends in floods in small catchments – instantaneous vs. daily peaks
CEE 3430, Engineering Hydrology David Tarboton
Totally Fit: Presentation to the Board
Water supply Flood prediction and forecasting. Water quality
Basic Hydrology & Hydraulics: DES 601
Klamath ADR Hydrology Report
Conclusions & Future Work
Utah, will we have enough water?
Calculating Hydrologic Parameters for Estimating Surface Water Flow at Ungaged Locations Richard Hoffpauir Water Resources Engineering.
Nonpoint Source Pollution
Hydrologic River Routing
Hydrologic Simulation Models
Provo River Watershed Modeling with WMS Ryan Murdock.
Write the equation for the following slope and y-intercept:
Graph 2x + 4y = 16 by finding the x and y intercepts.
WRE-1 BY MOHD ABDUL AQUIL CIVIL ENGINEERING.
WATER RESEARCH OF PINEVIEW RESERVOIR
Objectives: To graph lines using the slope-intercept equation
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Hydrologic modeling of Waller Creek
Presentation transcript:

Chatfield Reservoir Water Budget Jim Saunders and Jamie Anthony WQCD, Standards Unit 13 Dec 2007

Roadmap for Technical Review MonthTopic Sep-07Technical comparison of existing control regulations Oct-07Existing chlorophyll target, incl magnitude, frequency, duration Nov-07Evaluation and discussion of concentration translator Dec-07Water budget and appropriate concentrations for each flow source as precursor to common set of phosphorus loads Jan-08Phosphorus load estimates; produce common set by source Feb-08Evaluation and discussion of load translator Mar-08Hydrologic considerations for TMAL Apr-08Discuss chlorophyll-phosphorus-load linkages as basis for proposal Jun-08WQCD to finalize proposal and circulate Jul-08Notice due Nov-08WQCC RMH

Purpose of Water Budget  Identify and quantify flow sources  Rank sources in terms of importance (for determining phosphorus concentrations and loads)  Aim is to understand hydrology well enough to support development of a phosphorus budget

Inflows  USACE computed inflow is “gold standard”  Surface inflows Gaged (South Platte, Plum Creek) Ungaged (Deer, Massey) Direct runoff  Alluvial inflow (chiefly Plum Creek)  Direct Precipitation

Gaged Surface Inflows

Add Precip (directly to surface)

What’s Left?...~7%  Ungaged surface flow, mostly from low elevation  Alluvium  Both are more likely to be controlled by factors in common with Plum Creek than with the South Platte

Further Parsing of Flows  Strong association between Plum Creek and residuals; slope and intercept useful

Interpreting Graphs Intercept is residual when no flow in Plum; =alluvium Slope is proportional increase in Plum Cr runoff; =ungaged area

Overview of Graphical Analysis YearsSlopeInterceptR2R

Take Home from Graphs  Parsing a very small % of inflow (~7%)  Alluvial contribution (intercept) relatively stable; use constant for each 5-y block  Added runoff (slope) similar to ungaged area (24% of Plum Creek area) for first 20 years  Trend in slope over last decade is puzzling; we’re still seeking an explanation

Chatfield Annual Water Budget

Conclusions and Comments  Water budget provides a solid basis for estimating phosphorus loads Some snags with high resolution approach (measured inflows tended to exceed computed inflows in last 10 years), but still a solid basis Alternative could be developed on basis of two gages and precip (>90% of computed inflow)  Fortunately, uncertainty affects only very small components of inflow  Open to ideas about approach