Item 3b Guadalupe River Monitoring WY 2010 Jen Hunt, Ben Greenfield, Sarah Lowe, Lester McKee Sources, Pathway, and Loading Work Group May 6th, 2010.

Slides:



Advertisements
Similar presentations
The Clean Estuary Partnership and the RMP Comparing two stakeholder programs producing science in support of policy James M. Kelly, Chair Bay Area Clean.
Advertisements

AN OVERVIEW Jay A. Davis San Francisco Estuary Institute.
Item #6b 1 Towards a Bay Area Watershed Model Presented to the SPLWG May 14, 2008 John Oram & Lester McKee.
Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.
Guadalupe River Hg Monitoring WY 2010 Jen Hunt Sources, Pathway, and Loading Work Group May 27, 2009 Item #3.
Guadalupe River Small Tributaries Loading Study: Do we continue? If so How!! Lester McKee San Francisco Estuary Institute, Oakland, CA San Francisco Estuary.
Contaminant Fate WG 5 Year Plan RMP CFWG Meeting January 15, 2008.
RMP Dioxin Strategy Susan Klosterhaus Sources Pathways and Loadings Workgroup Item #9.
1 Update on Small Tributaries Loading Strategy Richard Looker, Chris Sommers, Arleen Feng, Jay Davis, and Lester McKee Sources Pathways and Loadings Workgroup.
Draft data - do not cite or quote Outline Management context Management context RMP objectives RMP objectives Specific questions for the next five years.
Developing Water Quality Solutions for SF Bay
Contaminants at the Estuary Interface Jon Leatherbarrow 1 Rainer Hoenicke 2 Lester McKee 1 1 San Francisco Estuary Institute 2 California Resources Agency.
Concentrations and loads of PCBs and OC pesticides in the Guadalupe River watershed Jon Leatherbarrow 1,2, Lester McKee 1, John Oram 1 1 San Francisco.
Regulatory State of the Bay Status and Trends Tom Mumley San Francisco Bay Regional Water Quality Control Board.
Suspended Sediment Loads from Bay Area Small Tributaries Mikolaj Lewicki and Lester McKee Sources Pathways and Loading Workgroup May 14 th 2008 Item #3a.
1 PCBs and PBDEs on the Guadalupe River WYs 2003 – 2006 John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings Workgroup November.
Measurements of Mercury Concentrations and Loads in a Large River System Tributary to San Francisco Bay, California, USA Nicole David, SFEI Lester McKee,
High Flow Studies (WY 2005) Lester McKee Sources Pathways and Loadings Workgroup.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A, Cabot Blvd. Hayward Years 1-3 – Partial Data Review: Continuation to Year.
Dioxin Sources, Loadings, and Inventory Data for San Francisco Bay RMP Technical Review Committee Meeting March 18 th, 2008.
Pollutant Loads to the Bay: Measuring the L in TMDL Lester McKee Sources Pathways and Loadings Workgroup and Watershed Program Manager SFEI RMP Annual.
Item #4 Slide 1 A Mass Budget of Polybrominated Diphenyl Ethers in San Francisco Bay, CA John J. Oram, Lester J. McKee, Christine E. Werme, Mike S. Connor,
Draft Strategy RMP Modeling Strategy John Oram Jay Davis.
Comparative Analysis of Loads of Mercury in Coyote Creek and Guadalupe River Lester McKee RMP SPLWG Chair San Francisco Estuary Institute
Mercury and PCBs TMDL Implementation Tom Mumley San Francisco Bay Regional Water Quality Control Board.
San Francisco Estuary Institute Small Tributaries Loading Study #2 Zone 4 Line A, Cabot Blvd. Hayward Year 2 – Draft Data To-date Sources Pathways and.
Regulatory Update Carrie Austin, SF Bay Water Board Michelle Wood, CV Water Board.
Impairment Assessment and Conceptual Model of Legacy Pesticides: DDT, Chlordane, and Dieldrin RMP Annual Meeting May 4, 2004 Jon Leatherbarrow, Chris Werme,
The South Bay Salt Pond Restoration Project and Bay Water Quality SFEI Letitia Grenier, Jay Davis, Robin Grossinger.
In Pursuit of Urban Runoff in an Urbanized Estuary: Losing sleep over troubled water In Pursuit of Urban Runoff in an Urbanized Estuary:Losing sleep over.
1 PCB and PBDE loads at Mallard Island on the Sacramento River: WYs John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings.
RMP Program Objectives & Management Questions Question 3: Describe sources, pathways, loadings, and processes leading to pollutant-related impairment in.
1 Guadalupe Watershed Model Year 2 update Presentation to SPLWG May 27, 2009 Michelle Lent, John Oram, Lester McKee Item #7.
Starting a New Small Tributaries Loads Study WY 2007: Zone 4 Line A - Progress to-date Lester McKee and Rand Eads Sources Pathways and Loadings Workgroup.
1 Guadalupe Small Tributaries Loads Study WYs (PCBs and PBDEs) John Oram and Lester McKee Sources Pathways and Loadings Workgroup November 13 th.
Urban Runoff Management: So Far, So Good. So What? Geoff Brosseau The RMP 2007 Annual Meeting Perspectives on the Impact of the Clean Water Act on San.
Advances in Understanding Pollutant Mass Loadings Lester McKee Jon Konnan, Richard Looker, Nicole David, Jay Davis Article on Page 77 of the Pulse.
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
SF Bay Region Atmospheric Mercury Monitoring Funded by: RMP, USEPA w/ services by: NADP/MDN, Contra Costa, San Francisco, San Jose.
Imperial River: Water Quality Status and Basin Management Action Plan.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, EOA, Inc. Illicit Discharge Stormwater Inspector Training Workshop April 24, 2013.
RMP NOV 08 Watershed Monitoring and the RMP Lester McKee and Meg Sedlak Presentation to North Bay Watershed Association September 10 th, 2010.
TMDLs on the Clearwater River Fecal Coliform Impairment of the Trout Stream Portion of the Clearwater River By Corey Hanson Water Quality Coordinator Red.
1 Small Tributaries Loading Study #2: Zone 4 Line A, Cabot Blvd. Hayward Year 1 – Draft FINAL report Lester McKee and Alicia Gilbreath Sources Pathways.
BACKRIVER TMDL PROJECT Technical Outreach Prepared by MDE/TARSA Prepared for the Baltimore Harbor Stakeholder Advisory Group September 10, 2002.
Chowan River TMDL Development Tidewater Area 08/26/04.
NorCal SETAC 2001 Seafood Contamination and Consumption.
Slide 1 Mercury Control Program for the Sacramento-San Joaquin River Delta Estuary San Francisco Bay RMP Annual Meeting October 7, 2008 Michelle Wood.
Benefits of the Redesigned RMP to Regional Board Decision Making Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
Are Local, Near-Ground Emissions of Mercury and Copper Significant Sources of Water Pollution? Geoff Brosseau, BASMAA Doug Steding/Christopher Conaway,
A Watershed Year for RMP & CEP: Sources Pathways & Loadings 2002/03 Lester McKee & Jon Leatherbarrow May 2003.
Small Tributary Loads The “Guadalupe River Study” Lester McKee, John Oram, Jon Leatherbarrow SFEI Autumn Bonnoma, Mark Stephenson, Wes Heim MLML Item #8.
SFEP/EPA Proposal Background- prior NBWA grant EPA Funds and Process SFEP Process EPA Approval and Schedule NBWA Proposal-$1.5 Million Other Funds.
1 Regional Data Review : What have we learned in eight years? Lester McKee Sources Pathways and Loadings Workgroup Monday December 8 th 2008 San Francisco.
PCBs and Mercury Source Identification Study Jon Konnan - EOA, Inc. October 15, 2015.
1 Richard Looker 2008 RMP Annual Meeting October 7, 2008 The Water Board’s Regulatory Approach and the RMP Mercury Strategy Hg.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Water Quality in San Francisco Bay J.A. Davis San Francisco Estuary Institute.
1 Develop/update spreadsheet model for regional loading and trends Michelle Lent, John Oram, and Lester McKee Sources Pathways and Loadings Workgroup May.
Watershed Monitoring and Modeling in Switzer, Chollas, and Paleta Creek Watersheds Kenneth Schiff Southern California Coastal Water Research Project
1 Dynamic modeling in a representative watershed (Guadalupe) Michelle Lent, John Oram, and Lester McKee Sources Pathways and Loadings Workgroup May 6 th.
Integrated Approach for Assessing and Communicating Progress toward the Chesapeake Bay Water-Quality Standards Scott Phillips USGS, STAR May 14, 2012 PSC.
Commonwealth of Virginia TMDL Program Update Citizen for Water Quality Annual Summit September 22, 2001.
1 Optimizing sampling methods for pollutant loads and trends in San Francisco Bay urban stormwater monitoring Aroon Melwani, Michelle Lent, Ben Greenfield,
Sources, Pathways, and Loadings Regional Monitoring Program for Trace Substances Annual Meeting, March 23 rd 2002 Lester McKee Watershed Program Manager.
MRP Pollutants of Concern Selenium and PBDE Provisions Monday November 20, 2006 Richard Looker - RWQCB.
STORMWATER MANAGEMENT
Beaver River Watershed PCB Investigation
SETAC North America 28th Annual Meeting
PCB Impairment Assessment/ Conceptual Model
Presentation transcript:

Item 3b Guadalupe River Monitoring WY 2010 Jen Hunt, Ben Greenfield, Sarah Lowe, Lester McKee Sources, Pathway, and Loading Work Group May 6th, 2010

Guadalupe River WY 2010 Mercury monitoring funded by the Santa Clara Valley Water District for 2 locations on the Guadalupe River Monitoring to assess progress towards attaining legacy and urban stormwater runoff mass load allocations for the TMDL PCB, PFC, and Dioxin monitoring funded by the RMP

Item 3b Why Guadalupe? Known source of Hg to the Bay Previous POC (Hg, PCB, PBDE) monitoring at GR 101 High loadings of both PCBs and mercury detected in previous studies Identified as a Status Monitoring Location in the MRP USGS discharge station USGS/SCVWD/SFEI collaboration.

Item 3b STLS Informational Needs Impairment: Which are the “high- leverage” small tributaries that contribute most to Bay impairment by pollutants of concern? Loads: Determining average annual loads or concentrations of pollutants of concern from small tributaries to the Bay. Provide data for modeling efforts.

Item 3b Guadalupe River Watershed Precipitation Gages

Item 3b San Jose Precipitation Year Average =14.37

Item 3b Mount Umunhum Precipitation Year Average = 48.56

Item 3b October 13 th Storm

Item 3b Mercury Sample Collection Samples for Mercury analysis collected from October 8, 2009 to April 28, THg (50 samples at 2 sites) 50 DHg, TMeHg, DMeHg (25 samples at 2 sites)

Item 3b PCB Sample Collection Samples for PCB analysis collected from October 8, 2009 to February Samples (20 samples at 2 Sites)

Item 3b Dioxin Sample Collection Samples for Dioxin analysis collected from October 8, 2009 to February Samples (14 samples at GR101 and 6 samples at GRFOX)

Item 3b Preliminary Mercury Data

Item 3b Preliminary PCB Data