1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Managing the Health and Safety of Contractors
Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles
ALO Planning & Assurance Requirements
ARES and RACES Emergency Communications Procedures Training LINCOLN COUNTY ARES / RACES PROGRAM.
1 Business Communication Systems (BCS) EXP1240 Series IP DECT Cordless System for Mobility EXP1240 Series.
Duplex Communication Road Rail Vehicle Safety Improvement Programme Best Practice briefing – November 2014.
1.  The Australian Radio Communications Industry Association represents some 300 commercial entities including approximately 1500 industry professionals.
Construction H&S Policy & Procedures 1 Health & Safety Policy & Procedures PRODUCT OVERVIEW.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Peltor Lite-Com Startbild LLPB 0410.
Crane Operations Objective
MySOS User Guide.
Substitute FAQs SubFinder Overview. FAQs Do I have to have touch-tone service to use SubFinder? No, but you do need a telephone that can be switched from.
Cranes, Hoists and Truck Hoists
1 Mark Prescott RRV Safety Improvement Programme Duplex-RRV Comms Communications Protocols.
HAHP Health & Safety Induction 2014/15
1 © 3M All Rights Reserved. 3M™Peltor ™ Communications © M Company. All Rights Reserved.
Bluetooth What is it and where is it going?. Background…..   Conceived initially by Ericsson, before being adopted by a myriad of other companies, Bluetooth.
Supporting Classroom Interaction with Networked Tablet PCs Richard Anderson Professor of Computer Science and Engineering University of Washington.
CQC Compliance Outcome 11
Contractors CDM Compliance Kit CDM Contractors CDM Compliance Kit PRODUCT OVERVIEW.
King Saud University College of Applied studies and Community Service 1301CT By: Nour Alhariqi 1nalhareqi st semester
Level 2 IT Users Qualification – Unit 1 Improving Productivity Name.
Risk Assessment – An Essential Standard
3M™ Peltor™ DECT-Com II Briefing for DECT-Com Super-Users.
BRC Food Safety Quality Management System Training Guide
Hazardous Waste and Emergency Response
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
MySOS Device User Training
Methods of communication
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
9/8/20151 Voice Mail Training for State Employees Presented by: Stacy Knickerbocker Telecommunications Specialist DOA/ITSD/NTSB
Nokia Bluetooth Headset BH-108 for Contact Centers
1 3M™ Peltor™ DECT-Com II Overview Briefing for:- Machine Controller Crane Controller RRV Operator.
Work Health and Safety (National Uniform Legislation) Act and Regulations NT WorkSafe Anna McGill.
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
Advanced Technical Writing Lecture 4 Memorandums.
Session 7 - Maintenance - contract and day-to-day Maintenance Support Presenter  Grenville Powell (Managing Director - of Shokaz Integrated Computing.
WIRELESS NETWORKING TOT AK Agenda Introduction to Wireless Technologies Wireless Networking Overview Non-Technical considerations Other Comparable.
 Introduction – Consumer Market  Benefits – Operational Cost & Flexibility  Challenges – Quality of Service & Securing VOIP  Legal Issuers  Risk.
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Communication Methods
3D LEISURE - Health & Safety Refresher Training Manual.
14 May 2014 Information Security, Information Governance and the Law – Confidence in Compliance © Contact Leonardo for reuse
How to Deliver a Successful Corporate Volunteering Day Dominic Pinkney & Catherine Evans Team UP Volunteer Centre Camden.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Wireless Networking Presented by: Jeffrey D. Bombell, American Computer Technologies.
PERFORM THE TASKS AND FULFILL THE RESPONSIBILITIES OF RANGE PERSONNEL PO/EO: REF.: B-GL /TS-000, TRAINING SAFETY.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
The Repairing Standard ELECTRICAL INSTALLATIONS AND APPLIANCES.
Communication & record keeping. Types of communication VerbalGiving instructions to others, talking to clients, taking messages WrittenConfirmation of.
What is Bluetooth? A cable-replacement technology that can be used to connect almost any device to any other device Radio interface enabling electronic.
Ping™ 6.
Occupational Radiation Protection during High Exposure Operations
Injury: Fall from height
Presentation Title: View > Header & Footer
Principal Contractor Licensing Scheme Standard
HAVS: Where do we need to be?
Need for VPN As a business grows, it might expand to multiple shops or offices across the country and around the world. the people working in those locations.
Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles
Automate New Employee Orientation Process
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Team Leader name: Date:
Technology Department Annual Update
How Do I Write a Good Technology Plan?
HAVS: Where do we need to be?
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

1 RRV Safety Improvement Programme DECT Duplex RRV communications System:- Contractors’ Brief

2 Contents Plant Manual Equipment Overview Implementation Communications Protocols Contacts

3 Network Rail’s Plant Manual Issue 5 published NR/Plant/0200/Infrastructure Plant Manual Mandates use of Duplex Communications System for all RRV operations Section number to go here RRV Safety Improvement Programme

4 Network Rail’s Plant Manual Issue 5 The use of Duplex Communication is mandated, and is included in Network Rail’s Plant Manual Issue 5 published 2nd March In Section 4 Communication equipment, this states: “Where personnel are required to undertake activities involving on-track machines or on-track plant on or about Network Rail managed infrastructure, mobile voice communication systems shall be provided for the Machine Controller and Machine Operator. Any such system shall be a full digital duplex communication system and as a minimum provide instant simultaneous communications, voice clarity, durability, and enhanced weatherproofing of the equipment. The communication system shall meet applicable EMC and other environmental requirements of Network Rail standards and other applicable mandatory or statutory requirements as appropriate.” Standard affected: NR/L2/RMVP/0206 (Issue 1), Safe Use of Plant for Infrastructure Work ‘Where personnel are required to undertake OTP activities on Network Rail managed infrastructure, mobile voice and radio communication systems shall be provided. Any such system shall be a full digital duplex communication system and as a minimum provide instant simultaneous communications, voice clarity, durability and enhanced weatherproofing of the equipment.’ Duplex comms systems must meet NR/L2/TEL/30156 tech spec. The only NR Product Approved equipment which meets the above requirements are: 3M Peltor DECT-Com, or 3M Peltor DECT-Com II Network Rail Contractors Compliance Date is 31 st March 2012

5 Network Rail’s Plant Manual Issue 5 Approved equipment which meets these requirements is the 3M manufactured Peltor DECT Com and Peltor Dect-Com II. In addition dBD Communications bluetooth Athena product is approved, providing two headsets. This maybe appropriate in some circumstances but does not offer the flexibility of DECT-com II, including for tandem lifts.

6 Network Rail’s Plant Manual Issue 5 How will Contractors comply with this? Principal Contractors are expected to manage the implementation of this requirement. Principal Contractors are expected to purchase, lease or hire sufficient Duplex communications equipment to comply with the Plant Manual. Following issue of OJEU notices Network Rail has awarded an Employers Facilitated Contract to: All of NR’s Contractors and Suppliers are able to purchase equipment direct from Cromwell at the agreed preferential rates. PC’s need to determine how best to deploy Duplex Comms on their sites e.g. controlled from Site Access Control or Personal Issue etc {NB: Do not ask your RRV Supplier to provide!}

7 DECT COM ii Duplex Communications Equipment overview Section number to go here RRV Safety Improvement Programme

8 DECT-Com II DECT – Digitally Enhanced Cordless Telephone 3M Peltor DECT-Com II is a wireless duplex intercom system, operating on the 1.8 GHz DECT-frequencies, which is license free in most countries. The products in the Peltor DECT-Com II family offer simple and efficient wireless duplex communication with up to 9 active users talking in full conference. Due to low power output and high frequency, it is a short range communication system. The nominal working range is approximately 150 metres outdoors in line of sight from the base. The working range may be shorter due to actual environmental conditions.

9 New DECT-Com II Up to 9 simultaneous portable units in a conference logged on to a base unit, which can also accept a headset making a total of 10.

10 Main unit There are basically two versions of the DECT-Com II main unit - Portable - Base/Portable There is also an Extension Base/Portable (for link to external communications devices) Black ring). This is rarely used.

11 Dect Com II Portable Unit 2

12 Throat mic Throat mics provide hygiene, noise reduction and the wearing of protective glasses advantages. As the microphones are tight against the user’s neck, only their voice is heard and outside noise is virtually eliminated. As there is no boom mic’, the hygiene issue with the boom mic’ is eliminated. The invisi tube earpieces should be personal issue. For Network Rail, these are available from High Motive through i- procurement

13 3M™ Peltor™ Headsets Available as a non-attenuation, medium, high attenuation and level dependant headset The same J11 connector connects any of these headsets to the Dect Com II Portables/Base or Base Extension units.

14 1 x DC2812 Dect Com II Base unit without external input (Red Ring Unit) 1 x DC2068 Dect Com II Base power supply holder (For Base Unit) 1 x 12 volt power cable (For Base Unit) 1 x DC2811 Dect Com II Portable handset (Green Ring Unit) 1 x DC2064 Dect Com II Charging holder 2 x J-TTM03/NP2/NB Throat mics Typical Single RRV Kit Contents

15 Implementation Section number to go here RRV Safety Improvement Programme

16 Implementation:- SuperUsers Super Users Consider nominating DECT Super Users who will become expert in use and setting up of the equipment. (This will probably be someone who regularly carries out the MC/CC role for you) Brief MC/CC/Operators The Super User can support briefing of all MCs, CCs and RRV Operators. Use of this equipment is incorporated into NR OTP Training material.

17 Implementation: Things to Consider Charging facilities Green Ring Portable Units have a battery life of 40 Hours. The Charging chassis’ can be fixed to a wall. You should establish a charging point and nominate someone to look after it. Batteries will last for 500 re-charges and can be replaced. Black & Red Ring Base Units have a 5 hour battery life. They should be plugged into the cigar lighter socket on the RRV when in use. (They can also be charged via the mains).

18 Implementation: Things to Consider Maintenance of Kit Periodic software and firmware upgrades may be required. For best results, certain functions should be locked out or applied, such as Auto talk, eliminating the need to double click PTT1 to join a conference. Batteries will need replacing after 500 charges. Installation is simple. (Replacements will be available on the system to buy). Marking of each kit is highly recommended. Units should go to site already paired (paired units to be marked KIT1 1A/1B, KIT2 2A2/B,KIT3 3A/3B etc).TANDEMS to be marked KIT1 1/A1/B/1C (clearly marked and not scratched in). Consider PAT testing for mains chargers

19 Hygiene Microphones can be protected by ‘Mic Tape’. This should be changed by each User prior to use. Headset Hygiene Kits are also available from Cromwell. Consider what arrangements you need to establish to make Hygiene Kits and Mic tape available to your staff. Cool Pads – self adhesive pads which stick to the earmuff cushions to aid absorption of perspiration. Periodically wipe with an anti bacterial wipe as used for cleaning a telephone. Throat mics and Lightweight Headsets are fairly cheap. You may wish to personally issue these to your regular CCs and Operators Implementation: Things to Consider

20 Implementation: Things to Consider Throat mics NOTE: When a throat mic’ is used, there are hygiene, noise reduction and the wearing of protective glasses advantages. As the microphones are tight against the user’s neck, only their voice is heard and outside noise is virtually eliminated. As there is no boom mic’, the hygiene issue with the boom mic’ is eliminated. The invisi tube earpieces should be personal issue. Security Consider the Security arrangements for the kit. How are you going to ensure it is kept together and in good condition? It is strongly recommended that DECT kit is not left on RRVs.

21 Implementation: Planning Works Planning Battery life of Green Ring Portable Units is approximately 40 hours. In the event of jobs being 52 hours, or longer such as for long weekend working, or blockades, exchanging handsets every 24 hours eliminates battery issues on the long shift. –This means ordering additional handsets from your supplier with the kit labeled e.g. KIT 1(1A,1B.1C) where handset A/B are used for the first 24 hours and then handset C/B are used for the remainder of the shift.

22 Black Ring Base Units Black Ring Base Units can be connected to Motorola GP30 back to back radios via the lead provided. These are rarely used. This allows someone else with another back to back radio to speak into the DECT conference. (and conference members to speak out) This external person might be the Engineering Supervisor or another Machine Controller waiting to receive an RRV from a ‘send and receive’ movement. Black Band Extension Lead Socket DC GP30 Motorola Cable Connected

23 Black Ring Base Units Machine Controller 1 Send & Receive Movement Onboard RRV Connected Machine Controller 2 Able to contact with the DECT Conference throughout movement Ready to join DECT conference when RRV comes within range. Or sent with the RRV from MC1 Black Ring Base Unit

24 Mark Prescott RRV Safety Improvement Programme Duplex-RRV Comms Communications Protocols

25 Radio Communications - Protocols DECT DUPLEX Radios operate in an ‘Open’ Channel conference. This means that your microphone is always live/active. Every time you speak it will be heard by those connected to your open channel conference. It is not reasonable to expect you to remain silent for the length of the shift. It is important to know when you are giving and receiving safety critical information and/or instructions. Using Open channel communications requires some discipline and some simple rules to know when safety critical info/instructions are being transmitted.

26 RRV Comms – Protocols, Basic Rules The Machine/Crane Controller is responsible for establishing the rules for communications and confirming what communications ‘phrases’ and ‘call signs’ are to be used. Remember using radios with RRVs will be new to many MC/CCs and Operators. Remember when Tandem Lifting each Machine will need an easily understandable name or call sign to ensure each Operator knows when he is being addressed. Before RRV operations commence the MC/CC must brief the Operator(s) and come to a clear understanding on the names and protocols that are going to be used.

27 RRV Comms – Protocols:- Commencing Operations When the RRV is required to commence an operation (movement or lift etc) the Machine or Crane Controller must alert the Operator(s) that he is about to give safety critical information or an instruction. This will stop any background conversation that may be taking place and the Operator(s) must pay attention. The following phrase should be used:- “Machine/Crane Controller speaking. Standby for Instruction.” The Operator must respond with the phrase:- “Standing by” When the task has been completed and the RRV can be stood down to wait for the next task the Machine/Crane controller should inform the Operator and state:- “Operation complete stand down.”

28 RRV Comms – Protocols:- Emergency Commands In the event of an Emergency the command is:- “Emergency! Stop! Stop! Stop!” Operators must cease or freeze all wheel and jib movement immediately. Crane Controllers can then give further instructions to bring the machine and or jib/load to a position of safety in a controlled manner.

29 RRV Comms :– Actions in the event of Radio Equipment Failure In the event of Radio equipment failure after work has started and the MC/CC and Operator are unable to resolve then the following actions must be instigated by the MC/CC:- 1.The MC/CC must attempt to source replacement equipment. 2.If the time required to source alternative equipment imports risk to successfully completing the task within the given possession working time, an alternative agreed safe system of work can be used. 3.The MC/CC MUST record on his RRV Work Plan why an agreed alternative safe system of work is being used and the type/reason of failure of the Radio equipment and report the defect to the Site or Line Manager. 4.Equipment failure and consequent actions must be reported through the Close Call system.

30 A Step Change in RRV Safety! Implementation The use of this equipment has been mandated for all RRV operations since 31 st March Using this equipment represents a step change in RRV Safety. This will only work if you effectively manage the robust implementation of its use. Please engage with your MCs, CCs and RRV Operators and take an interest in how they are getting on with the kit. Get involved with your Super User. Ask your Supervisors to undertake site visits when Duplex Comms are in use.

31 Mark Prescott RRV Safety Improvement Programme Contacts

32 RRV Safety Improvement Programme Contacts:- Project Manager:- John Sidebotham –Mobile: Programme Manager: Gerald Forward –Mobile: