Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
The DØ Silicon Microstrip Tracker Frank Filthaut University of Nijmegen / NIKHEF NIKHEF, 4 August 2000.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Vertex ‘99, 6/21-25/1999 p. 1 CDF Run II SiliconAlan Sill, Texas Tech University CDF Run II Silicon Tracking Projects 8th INTERNATIONAL WORKSHOP ON VERTEX.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
DØ Central Tracker Replaced with New Scintillating Fiber Tracker and Silicon Vertex Detector The DØ Central Detector Upgrade The DØ Detector is a 5000.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
The DØ Silicon Microstrip Tracker (SMT) Breese Quinn, FNAL Vertex2001 September 24, 2001 (presented by Frank Lehner, Universitaet Zuerich) Design Production.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
Detector building Notes of our discussion
LumiCal mechanical design, integration with LDC and laser alignment
FNAL Production Experience
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

Mikhail Kubantsev - Kansas State University 1 Assembly of a Large Area Microstrip Silicon Tracker Some Experience of Construction of D0 SMT H- disk Silicon Detectors March

Mikhail Kubantsev - Kansas State University 2 Outline Introduction: Overall Design Detectors Mechanical Tolerances Electronics Thermal Conditions Mechanical assembly of modules (half wedges) Testing and diagnostics of modules Construction of full wedges and disks Perspectives and conclusion

Mikhail Kubantsev - Kansas State University 3 Experiment D0 Silicon Microstrip Tracker  Scintillating fiber tracker

Mikhail Kubantsev - Kansas State University 4 SMT made of Barrels and Disks Ladders make up Barrels Wedges make up Disks SMT made of Barrels and Disks Ladders make up Barrels Wedges make up Disks F-DISKS H-DISKS BARREL S

Mikhail Kubantsev - Kansas State University 5 Silicon Sensors  Double and single sided detectors for barrels  Double sided for F-disks  Single sided for H-disks glued back to back  Total of 147,000 readout channels on 1.26 square meters of silicon detectors are to be assembled as H-disks

Mikhail Kubantsev - Kansas State University 6 SMT Readout  Basic element is a SVX-IIE chip with 128 channels of 8-bit ADC, sparsification,, buffers, and output drivers  The SVX chips are installed on the High Density Interconnect (HDI) flex circuit laminated on the berullium substrate  Digital information is passed to readout sequencers and via optical links to VRB’s and to computers

Mikhail Kubantsev - Kansas State University 7 Temperature Control  The readout generate a substantial amount of heat ( about 3.8 watts/HDI) or 185 watts for one H-disk  The cooling channels made of beryllium will support the structure and provide cooling  Temperature of silicon detectors should be close to 0 o C so they have to be in dry atmosphere (nitrogen gas)  Mixture of water and ethylene glycol is used as a coolant at temperature of -10 o C

Mikhail Kubantsev - Kansas State University 8 Track Measurements by H-disks  H-disk subsystem is a tracking device and not a vertex detector measuring tracks in rapidity interval Particle momentum is measured in r-  plane (magnetic field is normal to the disk).  Detector position accuracy of  is expected  The track momentum is measured by combination of barrel ladders (vertex position), F-disks and H-disks.

Mikhail Kubantsev - Kansas State University 9 H-disk Tolerances  Numerical estimations and detailed Monte-Carlo studies showed that tolerances in r-  plane should be better then 25  and few hundreds  along the beam direction. Intrinsic H-disk precision:

Mikhail Kubantsev - Kansas State University 10 Structure of the H-disk H-disk shroud Beryllium cooling channel Scintillating fiber tracker barrel 24 wedges installed on the cooling channel

Mikhail Kubantsev - Kansas State University 11 Half Wedge - Basic Module of the H-disk Outer silicon sensor (under Be substrate and HDI) Inner silicon sensor Be substrate HDI 65 cm 2 area of silicon

Mikhail Kubantsev - Kansas State University 12 H-disk Production Team  Kansas State - Moscow State - Fermilab team: M.Kubantsev(team leader) KSU E.Shabalina MoSU M.Merkin MoSU D.Karmanov MoSU G.Derylo Fermilab G.Sellberg Fermilab S.Jakubovski Fermilab N.Ronzhina Fermilab

Mikhail Kubantsev - Kansas State University 13 H-disk Design and Production Philosophy  Vigilance on production since silicon is not permissive: clean room environment  With alignment at when two half wedges are stuck together  With alignment at when 24 wedges are put on the large cooling ring Puts problems: - Use single-sided sensors - Define required precision of assembly. - Develop assembly procedures - Make a pre-production batch of modules - Full scale production of modules - Make two half wedges and stick them together -Put 24 wedges on the cooling ring with high precision

Mikhail Kubantsev - Kansas State University 14 Major Production Steps  Obtain and test sensors  HDI fabrication: flex by Compunetics,lamination by Fermilab, stuffing by Promex/Silitronics, testing by CSUF/KSU/KU/Fermilab Here is our starting point: silicon, beryllium,flex circuit

Mikhail Kubantsev - Kansas State University 15 Major Production Steps (Continue)  Half wedge assembly  Half wedge testing  Full wedge assembly  Ring Assembly  Wedges mounted on Rings  Over test of the rings  Installation and commission at the D0 detector

Mikhail Kubantsev - Kansas State University 16 H-disk Si Sensors  H-Wedges have inner and outer sensors that are made by ELMA(Russian) and Moscow State University with 4” technology.  Silicon detectors have 40  pitch, 80  readout pitch  About 500 are here, tested and more than a half assembled in the (half)wedges but we will need 60 detectors more to be delivered late spring. Outer silicon detector control measurement on the coordinate measuring machine

Mikhail Kubantsev - Kansas State University 17 HDI-Beryllium Lamination  Set up 2 sandwiches of parts on the special fixture: the bare HDI, epoxy glue film, Be substrate, conductive epoxy glue

Mikhail Kubantsev - Kansas State University 18 Lamination (continue)  Put the sandwiches in the oven and bake them with a special compressed air press (shown below) using accurately determined temperature and pressure cycles (it took two months to determine it!)  Can make 4 HDI laminations per day

Mikhail Kubantsev - Kansas State University 19 HDI Stuffing  Insufficient parts throughput  Bubbling in surface mount stage at Promex  Wire bonding pull strength problems  Low efficiency of production Find more then one vendor Bake out to remove moisture from kapton Plasma cleaning after parts surface mount Work with company on testing Problem Resolutio n Product - a stuffed HDI: Present yield - 80%

Mikhail Kubantsev - Kansas State University 20 Module - Half Wedge Assembly  The fully tested HDI on Be substrate is glued with an outer silicon sensor and a supporting beryllium plate  3M adhesive film is used to reduce mechanical stress on silicon to speed up production from 24 hours to 2-3 hours to make one glue joint Working on gluing procedure

Mikhail Kubantsev - Kansas State University 21 Assembly of Half Wedge (Continue)  The assembly is made on precision fixtures with accuracy of 50   The inner detector is attached to the outer detector with high accuracy 2-5  with special fixture using CMM OMIS.

Mikhail Kubantsev - Kansas State University 22 Wire Bonding of the Half Wedges  Wire bonding on the hybrid flex circuits is made by vendors (Promex, Silitronics)  Bonding of the SVX chips to pitch adapter,pitch adapter to outer detector and outer to inner detector is made on high speed bonding machines  Over 2000 bonds per half wedge are made in less than 30 minutes SVX chip wire bonding to the flex circuit

Mikhail Kubantsev - Kansas State University 23 Encapsulation of Wire Bonds  Encapsulation of wire bonds on the fully tested half wedges is made with the computer controlled motorized table watched by two TV cameras.

Mikhail Kubantsev - Kansas State University 24 Encapsulation (continue)  Special combination of 2 materials with different viscosity is used to encapsulate dense wire bonds on the detector-pitch adapter connection.  Encapsulation is cured with ultra violet light lamp TV image of encapsulation process: top and side(insert) views

Mikhail Kubantsev - Kansas State University 25 HDI/Wedge Testing: Functional Test  HDI and Wedge/Ladder functional tests are made with 4 available two-channel test stands.  The test is done after every step of assembly and includes: pedestal and noise measurements calibration charge inject silicon detector dark current

Mikhail Kubantsev - Kansas State University 26 HDI/Wedge Testing: Burn-in Test  HDI, ladders and wedges burn-in is done with 2 16-channel test stands. The devices are tested at low temperature (about 5 o C) for up to 72 hours. SVX gains, noise, pedestals, sparse mode and silicon detector dark current are tested.

Mikhail Kubantsev - Kansas State University 27 Wedge Testing: Laser Test 2 infrared laser stands are used for final certification of the devices. Over 10 units per day can be tested. Number of dead channels, detector depletion voltage, noise level are determined

Mikhail Kubantsev - Kansas State University 28 Test stands (continue)  10% system test stand is used for final system evaluation (cosmic ray test, barrel/disk tests)

Mikhail Kubantsev - Kansas State University 29 Diagnostics and Repair  Diagnosis of problems with HDIs and detector assemblies is a major concern. Several microscopes, probe stations and logic analyzers are in use  Repairs of found faults: SVX chip replacement, wire bonding and pulling, flex circuits traces defects are made by a team of skilled technicians.

Mikhail Kubantsev - Kansas State University 30 Assembly of Full Wedge  Full wedge is made of two half wedges glued together. It is a double sided device with a stereo angle of 15 degrees.  Assembly made on a bi-facial machine with two microscopes.Typical accuracy . Up two wedges per day can be made. Upper microscope Lower Microscope Assembled wedge

Mikhail Kubantsev - Kansas State University 31 Scheme of By-Facial Machine Upper camera Lower Camera Accurate alignment of two cameras in angle and X-Y positions required

Mikhail Kubantsev - Kansas State University 32 Full wedge assembly  Assembled full wedge on the flipping fixture ready for control measurements

Mikhail Kubantsev - Kansas State University 33 Ring Assembly This a prototype ring with mockup wedges and carbon fiber shroud ring to hold HDIs tails and connectors with cables

Mikhail Kubantsev - Kansas State University 34 Ring Assembly (continued)  H-DISK beryllium cooling channels are assembled and leak tested

Mikhail Kubantsev - Kansas State University 35 H-disk Assembly  Wedges are assembled on the cooling channel with a Coordinate-Measuring Machine (CMM) Zeiss-500. Thermal grease is applied for good contact between the cooling channel and wedges. Assembly accuracy is better that 10 .

Mikhail Kubantsev - Kansas State University 36 Production Yields  Step Made Accepted PercentSilicon detectors HDI assembly Module assembly Disk assembly 90 ?  Initial silicon/final device 100/30  Initial flex/final device 100/50

Mikhail Kubantsev - Kansas State University 37 H-disk Assembly Status:  125 grade A (<3% dead channels) and 17 grade B (3-10% dead channels ) devices (half wedges) are produced ( 75%) Note: average D0 SMT module production is about 50%.  Yield of grade A devices made during production period started in October 99 is about 90%  Full wedges are under assembly and 11 devices are ready  Disk assembly has started, first one is due in April  Goal: finish H-disk construction by fall 2000

Mikhail Kubantsev - Kansas State University 38 H Disk Status(in detail)  Sensors OK except order of 15% (60 sensors) should be delivered before June  HDIs (192 needed) 218 laminated 162 stuffed (80% yield)  Half-Wedges (192 needed) 156 built including 11 mechanical grade ones 145 electrical grade wedges assembled: 84 were tested: 67(80%) graded as grade A (less then 3% of bad channels) 17(20%) grated as grade B  Full-Wedge(96 needed) 8 electrical and 4 mechanical built  Beryllium cooling rings (4 needed) all four fully manufactured, tested and ready for assembly  Assembly of the first mechanical H-disk ring has started with mechanical wedges

Mikhail Kubantsev - Kansas State University 39 HDI (High Density Interconnect) - Hybrid circuit Fabrication and Testing  Order bare flex circuit boards and probe them for shorts and discontinues (CSUF) - DONE  Lamination on beryllium substrates (FNAL) - 75% DONE  Surface Mount, die attach, wire bond chips to HDI substrate (Promex,Silitronics) - 65% DONE  Functional Tests Run (CSUF, KU, KSU, FNAL)- 65% DONE  Burn-in Tests(FNAL) - 65% DONE  Repair and Rework - CAN BE FINISHED AS THE DETECTOR COMPLETED!

Mikhail Kubantsev - Kansas State University 40 Production Milestones  10/15/99 - H- half wedge fab 20% complete - DONE  2/23/00 - H- half wedge fab 80% complete - DONE  4/10/00 -first H-disk assembled  10/2/00- H-disks ready to be installed These are only production milestones, we have to have working detector.

Mikhail Kubantsev - Kansas State University 41 Characteristics of Assembled Devices A-grade(Nd<3%) B-grade(3<Nd<6%)

Mikhail Kubantsev - Kansas State University 42 H-disk Production Yields

Mikhail Kubantsev - Kansas State University 43 Conclusions and Perspectives  The H-disk construction is on track.  The assembly, installation and commissioning at D0 will be completed in the end of the year.  The developed techniques can be used for the proposed D0 upgrade (Layer 1,2) to assemble two singe sided radiation hard silicon sensors  Acquired experience will be useful for future work on large area silicon trackers for B-TEV and CMS.

Mikhail Kubantsev - Kansas State University 44 Perspectives:  use new type of adhesive (re- workable, thermo- ( if needed electrical-) conductive 3M film for large area detector assembly  use bi-facial machine to make double sided silicon assembly with single sided detectors with high precision  use high depletion voltage devices with over depletion up to 150 volts at low temperature below 0 o C)