2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.

Slides:



Advertisements
Similar presentations
MVD A SSEMBLY T WO HALF FRAME DONE – D IMENSION T ESTED A NCILLARIES FOR F RAMES DONE – D IMENSION T ESTED F RAME A SSEMBLY & F INAL M ACHINING – MUST.
Advertisements

M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
The ATLAS Pixel Detector
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
25/06/2015Robert King, Oxford University - Graduate Seminar Series 1 Electronic speckle pattern interferometry at the SLHC.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Daniela Calvo INFN – Sezione di Torino
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 A brief overview of the ATLAS Pixel Detector.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
13 January 2004V. Manzari - Quark Matter Oakland1 The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
Pixel detector development: sensor
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
A. Rivetti VIPS workshop-Pavia, April 23rd, 2010 The PANDA Microvertex Detector: Present Design and Opportunities for 3D Integration Technologies Angelo.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
An Overview of the FPIX Detector Upgrade – CMS Experiment
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Straw man layout for ATLAS ID for SLHC
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Si Sensors for Additional Tracker
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
SVT subchapters & editors
Technical Design for the Mu3e Detector
Update of MVD services and requests
Beam
Work progress in Turin x the MVD
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
U units for the MVD Close MVD Pixels (Paolo) Strips (Robert and Hans)
Hybrid Pixel R&D and Interconnect Technologies
Micro Vertex Detector of PANDA Strip Detector
Mechanics: (Tim).
Vertex Detector Mechanical R&D Design Questions and Issues
Integration – preliminary ideas on routing and tests
TK Upgrade report.
LOI Backup Document: R&D
SIT AND FTD DESIGN FOR ILD
Work packages status in Torino and perspectives
ERDIT – cost proposal.
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
SVT detector electronics
Presentation transcript:

2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned prototypes 2.Radiation damage study 3.Full size prototype sensors 4.Technology choice: Epi vs Oxygen FZ 5.Production (???) 3.ToPix architecture 4.Hybridisation 1.Bump bonding 2.Sensor thinning 1.First thinned prototypes 2.Thinning study 3.FE wafer thinning 5.Readout prototypes 6.Single chip assembly prototype (with ToPix 3???) 7.Module 8.Bus CCEp test

4 Integration Done and to be written Written! Under way To be done 1.Optical data transmission 1.Gbit 2.Optoboards 2.Off-Detector Electronics 1.Counting Room Electronics 2.Integration with Compute-Node 3.Power supply system 1.Powering concept 2.Request for strips and pixel integration 3.Design 1.Power distribution 2.Grounding/Shielding 4.LV Power supplies 5.HV Power supplies 6.Power regulators 1.Design 4.Cables 1.Requirements 2.Signal cable 1.Al/prototype/Results 3.Power cable/selection 4.Routing scheme

4 Integration Done and to be written Written! Under way To be done Mechanical Structures 1.Pixel part 2.Strip part 3.Global Support Cooling system 1.Cooling Plant 2.Cooling Distribution DCS Pixel Mounting 1.Stave assembly 2.Disk assembly 3.Barrel Mounting 4.Disk Mounting Strip Mounting 1.Stave assembly 2.Disk assembly 3.Barrel Mounting 4.Disk Mounting

4 Integration Done and to be written Written! Under way To be done MVD Integration MVD assembly with the tracker MVD installation