Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Aerospace Process.

Slides:



Advertisements
Similar presentations
THE BUSINESS PLAN The Business Plan Chp. 5 ITB.
Advertisements

Aerospace Advanced Product Quality Planning (Aerospace APQP) Introduction October
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The Future Role.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Project Management: A Critical Skill for Organizations Presented by Hetty Baiz Project Office Princeton University.
Do You Know ???.
IT Project Management Office
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
Orientation to the Physical Education K to 7 Integrated Resource Package 2006.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Practice-based Doctoral Dissertations: Lessons Learned from the Executive Doctoral Program in Health Leadership (DrPH)
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Buck Crenshaw, Program Element Manager, NASA-Wide.
1 Procurement Quality Assurance Use quality as the framework for process/continual improvement Use quality as the framework for process/continual improvement.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
July 18, 2001 Mission Success Begins With Safety Quality Leadership Forum Software Quality Assurance at GSFC Dr. Linda H. Rosenberg Chief Scientist for.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Basics of OHSAS Occupational Health & Safety Management System
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
IEEE Systems Council Technical Operations Current Status and Future Opportunities Theodora Saunders VP, Technical Operations.
Proposed National SET Goals for 2009 National SET Mission Mandate Team and National 4-H Council.
An introduction to the Care Act Learning and Development Programme Staffordshire Managers Quality Network Forum Olivia Redgrave, Area Officer, Skills for.
Product Stewardship: Putting It into Practice GCWellon, Manager, Responsible Care Methanex Corporation June 2010.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
Surveillance Planning Team Initial Team Meeting January 9-10 NASA Headquarters Team Introduction Revision A Tom Whitmeyer - OSMA Jeff Cullen - Procurement.
Quality Concepts within CMM and PMI G.C.Reddy
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Surveillance Guide Overview May
The Business Plan- Creating and Starting the Business
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
DEFINITION Quality assurance is the process of verifying or determining whether the products or services meet or exceed the customers expectations. Quality.
1 You are a New Member of the JAC; NOW WHAT? As a new Journey-Level Advisory Council (JAC) member, you probably have many questions, including those about.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Michigan School Improvement Conversation Starter Kit II.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
The Value Driven Approach
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
NIMSL Nuclear Information Management Strategic Leadership Community of Practice.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
SUBMITTED TO THE HIGHER LEARNING COMMISSION OF THE NORTH CENTRAL ASSOCIATION OF COLLEGES AND SCHOOLS MAY 2010 Progress Report on Outcomes Assessment.
MDIC 1 George Serafin Deloitte & Touche LLP MDIC Open Forum Quality System Maturity Model Update.
Implementing Strategy Chapter 7. Objectives Upon completion of this chapter, you should be able to:  Translate strategic thought to organisational action.
Safety and Mission Assurance Directorate, Goddard Space Flight Center Supply Chain Management Panel Session: NASA Supplier Assessments: Processes, Results.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
Project Management Training
Summary of Session 2: Corporate Management of Safety 1 Iva Kubanova IAEA International Conference on Operational Safety Vienna International Centre
Quality Leadership Forum March 5-7, 2002 Quality Leadership Forum March 5-7, 2002 Joyce Rozewski Process Control Focus Group Space Shuttle Program Process.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Quality Leadership.
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
SAFE Association UNIQUELY FOCUSED IN A CRITICAL DISCIPLINE ORIGINALLY FOUNDED IN 1956 AS SPACE AND FLIGHT EQUIPMENT ASSOCIATION, SAFE ASSOCIATION IS AN.
1 Security Architecture and Designs  Security Architecture Description and benefits  Definition of Trusted Computing Base (TCB)  System level and Enterprise.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
NIGP: The Institute for Public Procurement Public Procurement’s Go-To Resource.
Safety Committee Formation
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
Developing Safety Huddles to Meet Organizational Needs Brett Shipley MSN, RN Patient Safety Officer Ann Steffe MSN, RN, PCCN Director of Critical.
Identify the Risk of Not Doing BA
iscom 472 mart Your world/iscom472martdotcom
Overview – Guide to Developing Safety Improvement Plan
ISCOM 472 NERD Lessons in Excellence -- iscom472nerd.com.
MGT 498 TUTORIAL Lessons in Excellence -- mgt498tutorial.com.
MGT 498 Education for Service-- snaptutorial.com
Overview – Guide to Developing Safety Improvement Plan
By Jeff Burklo, Director
USNRC IRRS TRAINING Lecture18
Developing Safety Huddles to Meet Organizational Needs Brett Shipley MSN, RN Patient Safety Officer Ann Steffe MSN, RN, PCCN Director of Critical.
MODULE 11: Creating a TSMO Program Plan
IEEE RS Standards Status and Descriptions
Presentation transcript:

Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Aerospace Process Control Quality Leadership Forum October 30, 2001 Tom Whitmeyer NASA HQ Office of Safety and Mission Assurance (1)

Mission Success Starts With Safety 01/03/2001 (2) Introduction Why Process Control? Outsourcing is increasing Control or processes, particularly within the supply base, is becoming critical

Mission Success Starts With Safety 01/03/2001 (3) Purpose / Scope Purpose :  Evaluate aerospace process control  Identify needs and best practices  Coordinate / communicate areas of emphasis within aerospace  Create a process control message that is common to Aerospace industry Scope : Consider each phase of the mission life cycle Consider process, product, and organizational elements

Mission Success Starts With Safety 01/03/2001 (4) Charter Key objectives:  Facilitate process control awareness  Identify and promote process control best practices  Define and analyze process control related risks  Communicate process control lessons learned  Improve process control in the aerospace supply base

Mission Success Starts With Safety 01/03/2001 (5) Approach Charter with QLF Teams, sub teams Coordinate with Space Shuttle Process Control Focus Group (PCFG)  Coordinate with AAQG  Coordinate with DCMA  Coordinate with LAI  Process control lead will manage  Team, sub team membership will be established Communicate via Intranet Meet periodically face to face

Mission Success Starts With Safety 01/03/2001 (6) Awareness Awareness: Develop and deliver “message” for general awareness (video, posters, CDs, etc) Develop and deliver “message” for specific supplies (hardware fact sheets, etc) Develop and deliver “message” for supplier symposium and supplier visits Develop and deliver “message” for Aerospace industry forums

Mission Success Starts With Safety 01/03/2001 (7) Standards Work with AAQG to promote a standard that defines Process Control (top level definition, terms, general process descriptions) Support future AAQG standard development related to Process Control (NCMR, CAR, 1st Article, etc (top level definitions)

Mission Success Starts With Safety 01/03/2001 (8) Guideline Develop and distribute “guide to aerospace to process control” Address activities pertinent to aerospace manufacturing, and operations Practical guidance that is not format specific or prescriptive Written by professional curriculum development organization using team input

Mission Success Starts With Safety 01/03/2001 (9) General Reference / Best Practice Run the Process Control Intranet Provide process control information into PBMA Identify general reference resources (where to go to get info on PFMA, SPC, etc) Run web site for implementation guidance (examples, suggestions, etc) Promote process control best practice approaches (PPIA, Critical Process, etc. 3-4 pages each)

Mission Success Starts With Safety 01/03/2001 (10) Metrics Develop a process control Capability Maturity Model (CMM) for or aerospace manufacturing and operations Use common grading criteria (Level 1-5) Apply criteria to commonly defined process control practices ”Measure" level of process control implementations Example: % of critical processes that have a PFMEA Example: process mapping utilization Provide as a self assessment continuous improvement road map Utilize during outside (independent) assessment process Use as basis for future surveillance plan development

Mission Success Starts With Safety 01/03/2001 (11) Next Steps Discussion with Process Control Focus Group (PCFG) Discussion with Quality Leadership Forum (QLF) Discussion with AAQG Discuss with DCMA Team kick off meeting(s) TBD