H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.

Slides:



Advertisements
Similar presentations
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
Advertisements

Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Helene Felice HQ02 Assembly status 02/28/2012. HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Last week first slide: Planning “Best Guess” Short Plan “best guess” – collared coils 102/104 “dry test" next week – Mirror MBHSM101 : collared coils 105/101.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
LARP Internal Review of the MQXFA Mechanical Structure Design and Functional Requirements 7/16/2015 Dan Cheng, Helene Felice Development of the Shell-Based.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
MQXC Nb-Ti 120mm 120T/m 2m models
HQ02b Preload Increase - Summary
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Mechanical tolerance analysis for the MQXF prototype structures
LARP Technology Quadrupole Review
11 T dipole coil features and dimensions
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Discussion session on day 1
P. Ferracin and G. Ambrosio
MQXFAP2 SG Readings ---Update (up to quench #22)
After service guide for changing PCB
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
MQXFS6 assembly and loading
Magnetic measurements on the MQXFS6b at ambient temperature
Presentation transcript:

H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015

Schedule from 06/01 207/27/2015H. Felice et al. Completed under review On track starting Completed Disassembly SG instrumentation On track 103/104 at LBNL 3 and 5 QA 103 and 104 connectors and QA Assembly prep Coil pack insertion tooling test

Updated schedule on 06/15 07/27/2015H. Felice et al.3 Missing A01 tap on CERN coils All wires coming in the center Tech time off New tech training Weather Roll-over tooling fine tuning Coil assembly tooling load tested, Practice with dummy coils Reduced from 2 to 1 week

Updated schedule on 06/19 07/27/2015H. Felice et al.4 Vtap Strain relief of SG wiring Meeting planned on June 24th Starting today

Updated schedule on 07/06 07/27/2015H. Felice et al.5 Compensation for different coil size

Radial Shim summary 07/27/2015H. Felice et al.6 From coil OR to collarL03C103L05C104 Kapton Ground plane insulation0.005” (0.125 mm) Coil specific shim ” mm ” mm Fuji paper (Low pressure)0.007” (0.175 mm) G105x0.009”+0.005” (1.3 mm)

Coil pack assembly #1 with Fuji paper 07/27/2015H. Felice et al.7 Nominal Radial shim = ” = mm Correction from CMM Radial shim should be: 0.064” ”=0.0615” Actual stack in MQXFSD1= 0.062” = 1.57 mm from coil OR to collar IR: 0.005” ( coil GPI kapton) ” (Fuji) + 5x0.009”+0.005”(G10) Used for MQXFS1

1 st collar pack 07/27/2015H. Felice et al.8 Coil L05 Coil L03 Coil C104 Coil C103 During assembly SG show very slight compression Coil C103 shows slight tension Lower compression of coil 103 Despite distributed pressure, all coils show higher compression points at the pole

1 st collar pack 07/27/2015H. Felice et al.9 Coil L05 Coil L03 Coil C104 Coil C103 During assembly SG show very slight compression Coil C103 shows slight tension Lower compression of coil 103 Despite distributed pressure, all coils show higher compression points at the pole

Coil pack assembly with Fuji paper 07/27/2015H. Felice et al.10 1 st MQXFS1 collar pack Actual stack in MQXFSD1= 0.062” = 1.57 mm from coil OR to collar IR: 0.005” ( coil GPI kapton) ” (Fuji) + 5x0.009”+0.005”(G10) Used for MQXFS1 2 nd collar pack build High compression at the pole => coil oversized wrt collar Removal of 1 mil radial shim 0.007” Fuji replaced by 0.005” G ”Kapton Alignment keys not shimmed No Fuji diagnostic but SG diagnostic sensitive enough to monitor the change

Updated schedule on 07/27/ /27/2015H. Felice et al.11 Repair Coilpack started today Incident

Coilpack#3: Radial Shim summary 07/27/2015H. Felice et al.12 From coil OR to collarL03C103L05C104 Kapton Ground plane insulation0.005” (0.125 mm) Coil specific shim ” mm ” mm Fuji paper (very low pressure)0.007” (0.175 mm) G105x0.009” (1.3 mm) Total radial shim: 0.052”+0.005”=0.057” (1.45 mm)