Africa Programs. Burkina Faso infrastructure Radar installation on top of control tower and King Air B-200 and hangar facilities at the airport in Ouagadougou.

Slides:



Advertisements
Similar presentations
Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
Advertisements

1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Bridging the Broadband Infrastructure Gaps EPFL: 25 May 2011 ICT Applications and Cybersecurity / IEE International Telecommunication.
A new standard in Enterprise File Backup. Contents 1.Comparison with current backup methods 2.Introducing Snapshot EFB 3.Snapshot EFB features 4.Organization.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
Case Study: Selecting a New Ticketing System IAAPA 2007.
A REPRODUCTIVE HEALTH COMMODITY SECURITY STRATEGY FOR THE WEST AFRICA SUBREGION 2007 – 2011 Dr. Kabba Joiner, WAHO 2006 Fall Meeting of the Reproductive.
Tim Spangler 16 October 2009 Where is My Tie? Or, My Personal Journey with Unidata.
Current programs in Africa update Scientific Challenge: Aerosol – Cloud Interactions: Implications for precipitation and weather modification R. T Bruintjes.
1 Fox Valley Fire & Safety’s Wireless Radio Network Our customers experience reduced monitoring costs; normally 25% or more. Eliminates expensive phone.
Satellite Communication Solutions. Finally an affordable satellite based HOTSPOT solution.
PRJ566: Project Planning and Management
Background Approximately 70 percent of Africans rely on farming for their livelihood, or close to 700 million people, and over 95 percent of Africa's agriculture.
Richard Valdez OECS /09/08 Final Project.  Arts and crafts store  Various Items  Several Different departments  Crafts  Arts  Scrapbooking.
The New Software Accounting Rules-GASB 51
1 10/16/2014 HydroLynx ALERT2 Training How to upgrade your system to use the ALERT2 protocol.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Project field communication services llc Remote Site Industrial Communications Systems - Delivered. Capabilities Overview Project.
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
Proposal to upgrade infrastructure and radars and stream data through UNIDATA back to NCAR. R. T Bruintjes, M. Moncrieff, A Laing and others Africa meeting.
1 Customer Network Operations Center. 2 Agenda Overview Benefits Value Additional Services Questions Monitoring Options.
The Hardware Behind the Internet A virtual tour. Pictorial View of the Internet Backbone The “Internet Backbone” refers to the principal data routes between.
. Customer Outreach and Education Options Available To Customers Who Are Disabled R Phase 3 Workshop Dave Pojtinger AT&T California March 9,
Cornell 18,000 students 2,000 faculty Twelve colleges on Ithaca campus Four are state colleges, eight are private (including grad school and school of.
ASMET: African Satellite Meteorology Education & Training Marianne Weingroff DLESE/UCAR June 6, 2006.
By David Chavez Wireless Laptops in Classrooms. Going Wireless! If you've been in an airport, coffee shop, library or hotel recently, chances are you've.
Shore Station UPS Requirements for the NEPTUNE Power System
Google PowerMeter. Overview Google PowerMeter is a new application from Google that allows users to observe the power usage in their environment shown.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
St Louis Flying Club I 2008 Annual Meeting 2008 Annual Meeting.
United Nations Specialised Agencies. UNICEF United Nations International Children’s Emergency Fund Emergency aid (e.g. wars, famines, natural disasters.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Identifying Application Impacts on Network Design Designing and Supporting Computer.
Future of Library Network Equipment (Edge Equipment)
Small Wind Systems in Village Power Applications Southwest Windpower, Inc. “Renewable energy made simple” Andrew Kruse.
SCSC 311 Information Systems: hardware and software.
Background Info - The state of the campus telecommunications infrastructure in December 2001.
Challenges facing ISPs in Africa: a view from an African ISP William Stucke AfrISPA ZAnet Internet Services.
 To help you understand and describe a range of methods for installing a new computer-based system; › Parallel › Phased › Direct › Pilot  Also, to help.
1. Outlines Introduction What is Wi-Fi ? Wi-Fi Standards Hotspots Wi-Fi Network Elements How a Wi-Fi Network Works Advantages and Limitations of Wi-Fi.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
 Introduction – Consumer Market  Benefits – Operational Cost & Flexibility  Challenges – Quality of Service & Securing VOIP  Legal Issuers  Risk.
Welcome to Hosted VoIP Eric Thomas Founder & CEO, FreedomVOICE Systems. Creators of FreedomIQ Hosted VoIP PBX. Over twelve years experience as a leading.
SWESCO ITC PROJECT. PROJECT PROPOSAL - OVERVIEW Upgrade of School’s ITC infrastructure. The new physical network architecture will require several upgrades.
Burkina Faso Office 01 BP 541 Ouagadougou 01 Tel: (226) (226) Inclusive Education.
Things to Consider When Companies Implement Computer Reservation Systems  Implementation Costs  Security Issues  Marketing Strategies  Effectiveness.
Lazare TIA General Coordinator of GeoS-NetAfrica Institute of Tropical Geography Félix Houphouet-Boigny University (Côte d’Ivoire) GeoS-NetAfrica and GEONETCast.
The NAMMA Upstream Sounding Network over West Africa: What worked and didn’t work—and was it worth the effort? How can these observations help NAMMA studies?
Africa Initiative: An Update UMC Meeting 19 December, 2006.
Communications & Computer Networks Resource Notes - Network Hardware
Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity.
Disaster Recovery: Can Your Business Survive Data Loss? DR Strategies for Today and Tomorrow.
CYBERCAFÉS AS A TOOL FOR INCLUSION Presentation by Mr Christophe OULÉ, trainer in accessible IT tools U. N. – A. B. P. A. M. National Union of Burkinabé.
The Sahel Countries Mr. Mulligan Elmwood Park Social Studies Department Geography.
Computer System Support   The costs of installing, operating and maintaining computer systems are called total costs o ownership or TCO  TCO includes.
Selecting the Best Alternative Design Strategy. Two basic steps 1.Generate a comprehensive set of alternative design strategies 2.Select the one design.
Report of RAI Working Group on Climate Related Matters (WGCRM) Alphonse KANGA International Workshop on Rescue and digitalisation of Climate Records in.
Buying Computer Hardware   A state agency added office space for new employees. To connect the employees to its network, the agency purchased 25 desktop.
Annex Questions on economic characteristics included in the census questionnaires, 18 African countries.
Disaster Recovery on Steroids M Kent Linsenmann. Introduction Why How Solution Implementation Review.
© UPU 2009 – All rights reserved RemesAmericas 2010 Remittances for the future UPU postal payment services and financial inclusion Mexico, 6 and 7 May.
Smart Schools Bond Act LAURENS CENTRAL SCHOOL. What is the Smart Schools Bond Act?  The Smart Schools Bond Act (SSBA) authorized the issuance of $2 billion.
Recovery from the earthquake Takashi Sasaki. Disaster recovery “Disaster” comes from human error or hardware failure was considered before We were preparing.
Servelite - Complete IT Solutions. Servelite IT solutions specialize in providing Home solutions and Business solutions. We focus upon delivering quality.
Stamatia Bibi1, Dimitris Katsaros2, Panayiotis Bozanis2
Higher Information Systems
Data Management Solutions for a Modernized HIS
MAPS I Cross-border Co-operation and Policy Networks in West Africa
Communications & Computer Networks Resource Notes - Network Hardware
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Africa Initiative Dave Burridge Visit.
Presentation transcript:

Africa Programs

Burkina Faso infrastructure Radar installation on top of control tower and King Air B-200 and hangar facilities at the airport in Ouagadougou

Mali

Weather radar and project locations Radar locations Burkina Faso and Mali radar locations. Local weather services and universities

Radar pictures of West African squall line

Real-time data Bamako, Mali rdata/images/BamakoDbz/CP_BamakoDbz_BAMAKO_ png

Recent Work Unstable and unreliable internet and local area network at the Programme SAAGA offices in Ouagadougou. The network and internet connections went down several times during the day and once for a period of 24 hours. The problems were associated with wiring problems, router and firewall problems and not necessarily with the internet connection as such. The network and internet connections in Bobo Dialloso were found to be highly reliable and working fine. The problems in Ouagadougou could also be associated with frequent power outages at the Programme SAAGA office during my one-week stay. Unstable power supply and frequent power outages at the Programme SAAGA offices in Ouagadougou. Although a standby generator is available for power supply when normal electrical power outages occur it always took 30 seconds to a minute to change from normal to standby power. The UPS units that supply power to the radar and TITAN/CIDD computers during this transition are small and on days when several of these power outages occurred the UPS batteries were drained and were not able to continue to provide power to the computers and equipment. This resulted in systems losing power and rebooting after power was reinstated. This also resulted in loss of data.

Africa Initiative Proposal Activities Finalize implementation of radars and software (Current funding) Provide expert in networking to evaluate and help design reliable network (New funding, travel and support, 1 month) Network Mali and Burkina Faso radars and potentially MIT Niger radar (new funding, software engineer, 1month) Stream data to UNIDATA (new funding, 1 month per year software engineer, UNIDATA)

Proposal Activities (cont.) Burkina Faso has recently purchased two EEC C-band radars. As part of a sub-contract with EEC, NCAR is already working with Burkina Faso to provide upgraded software for one of the radars. Propose to upgrade the two C-band weather radars by providing a new receiver with Doppler capability including analysis software (1 month radar engineer, 1 month software engineer, hardware (~50k). Education and training (3 people from Burkina Faso and Mali will visit NCAR for training, current funding; GLOBE, COMET, UCAR E&O, START, ASMET, etc?) Workshop in Fall or early winter in West Africa (Sahel other west African countries using existing networks).