Transmission System Customer Discussions – July 2009 Common Use System (CUS) Black Hills Power Basin Electric Power Cooperative Powder River Energy Corporation.

Slides:



Advertisements
Similar presentations
NTTG Report to TEPPC BiennialTransmission Plan.
Advertisements

Energy Policy Act of 2005 Section 1221 & 368 Update Board Meeting – Los Cabos, Mexico December 7 & 8, 2006.
2009 Generators that have Achieved Certification Arizona Public Service Company ATCO Electric Ltd. Avista Corporation Basin Electric Power Company Black.
Existing source Rule—Potential Impacts to UAMPS
14 th Annual International Legislators Forum EPA Carbon Regulation June 26, 2014 Eric J. Olsen Vice President and General Counsel Great River Energy.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
CLECO TRANSMISSION RATE CASE. AGENDA Welcome and Introduction Purpose of Meeting Transmission System Update Formula Rate Overview Formula Rate Protocols.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
1 COST OF SERVICE OBJECTIVES & METHODOLOGY Utah Cost of Service Taskforce May 23, 2005 Dave Taylor.
October 30, 2014 Terry Wolf, Manager of Transmission Services.
PJM© PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 750+ millions of people served 60 peak load in megawatts.
Transmission Transporting Energy by Wire Matthew Stoltz Basin Electric Power Cooperative 1 1.
Presentation to WECC TSS May 8, 2015
Wyoming Pipeline Authority August 30, 2005 Gaylen Haag Business Development Questar Pipeline Company.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
Transmission Incentives P. Kumar Agarwal Acting Director, Division of Reliability & Engineering Services Federal Energy Regulatory Commission U.S. DOE,
Montana Ambassadors Helena, Montana February 25, 2011.
Energy Gateway Gateway West Project Gateway South Project
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Great River Energy 2015 Attachment O Annual Projected Rate Meeting October 31, 2014.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Great River Energy 2013 Annual True-Up Meeting August 7, 2014.
Great River Energy 2014 Annual True-Up Meeting Todd Butkowski.
2014 Attachment O True-Up Customer Meeting August 25, 2015.
Capital Financing for Energy – Related Projects George Williams, SVP and Chief Operating Officer El Paso Electric Company May 20, 2010.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Technical Conference on Net Metering Load Research Study November 5, 2014.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
COMMON USE SYSTEM March 5, 2008 Black Hills Power Service Center Rapid City, SD TRANSMISSION COORDINATION AND PLANNING COMMITTEE.
Public Meeting on ERCOT’s Proposed 2004 Budget September 3, 2003 Preliminary - Subject to ERCOT Board Approval.
August 21, 2015 Terry Wolf, Manager of Transmission Services.
1 Casper Cheyenne Questar Wamsutter Pipeline Project Description Montana North Dakota South Dakota Nebraska Colorado Utah Wyoming Phase1 245 mile pipeline.
Nickname: Mount Rushmore State Region in the U.S: The Midwest Capital City: Pierre Three major cities: Gettysburg, Madison and Lemmon Population: 814,180.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Status of BART Analyses Implementation Workgroup Meeting April 17, 2007.
2016 Attachment O Projected Net Revenue Requirements Customer Meeting October 29, 2015.
How the Transmission System Works Really William F. Reinke.
August 22, 2014 Terry Wolf, Manager of Transmission Services.
1 Westar Energy’s 2016 Annual Transmission Revenue Requirement Customer Meeting October 27, 2015 Westar Energy’s Professional Development Center Topeka,
BUFFALO POWER COMPANY July 22, Oregon Trail Energy Project Buffalo Power Company, LLC High Plains Transmission, LLC.
Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
November 16, 2012 Terry Wolf, Manager of Transmission Services.
U TILITIES 2013 BUDGET OVERVIEW Electric Department – Fund 520 Water Department – Fund 525.
2013 Attachment O True-Up Customer Meeting August 13, 2014.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
2013 Annual True-Up Meeting
Mountain West Transmission Group
2014 Attachment O True-Up Customer Meeting August 25, 2015
2016 Annual True-Up Meeting for South Central MCN LLC
Transmission System Customer Discussions – July 2009
Common Use System Q1 Meeting, April 06, 2016 Black Hills Power Service Center Rapid City, SD Volume? Presentation displaying ok? Welcome to the first Transmission.
BHP 2016 Formula Rate True-Up Meeting
BHP 2017 Projected Net Revenue Requirement Meeting
Rates & Regulatory Updates
Basin Electric SPP Market Update
BHP 2015 Formula Rate True-Up Meeting
Westar Formula Rate and your bill
ColumbiaGrid Planning Meeting FERC Order 1000 Activities June 7, 2018
BHP 2018 Projected Net Revenue Requirement Meeting
BHP 2017 Formula Rate True-Up Meeting
2014 Annual Attachment O Stakeholder Meeting Ameren Missouri
2019 Attachment O customer meeting
2017 Attachment O Customer Meeting
2018 Attachment O customer meeting
2016 Attachment O True-up customer meeting
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
2017 Attachment O True-up customer meeting
Presentation transcript:

Transmission System Customer Discussions – July 2009 Common Use System (CUS) Black Hills Power Basin Electric Power Cooperative Powder River Energy Corporation Prepared July 14, 2009

Agenda Introductions Common Use System Overview Basin Electric Costs Transmission Rate Case Schedule Customer Impacts Discussion / Questions

S DAKOTA NEBRASKA WYOMING MONTANA BUFFALO CASPER DAVE JOHNSTON SPEARFISH RAPID CITY HOT SPRINGS RENO SHERIDAN TECKLA STEGALL YELLOWCAKE S. RC Y. CRK HUGHES DC TIE CARR DRAW B. CRK M. MILE OSAGE SPENCE PUMPKIN BUTTES WYODAK PacifiCorp System WAPA System Regional Transmission System - Existing Common Use System LRS

S DAKOTA NEBRASKA WYOMING MONTANA BUFFALO CASPER DAVE JOHNSTON SPEARFISH RAPID CITY HOT SPRINGS RENO SHERIDAN TECKLA STEGALL YELLOWCAKE S. RC Y. CRK HUGHES DC TIE CARR DRAW B. CRK M. MILE OSAGE TONGUE RIVER ARVADA SPENCE PUMPKIN BUTTES Donkey Creek WYODAK Common Use System (new) PacifiCorp System WAPA System Regional Transmission System - New Common Use System MVAr’s D-VAR 2009 “DJ AREA” LRS 2010 (BH)

Cost of Equity Cost of Debt General Plant Allocator Capital Projects Potential Future Facilities Basin Electric Costs

Cost of Equity – 10.80% Cost of Debt General Plant Allocator Capital Projects Potential Future Facilities Basin Electric Costs

Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator Capital Projects Potential Future Facilities Basin Electric Costs

Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator – GP1 per settlement Capital Projects Potential Future Facilities Basin Electric Costs

Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator – GP1 per settlement Capital Projects – $82.9m  $87.6m Potential Future Facilities Basin Electric Costs

Cost of Equity – 10.80% Cost of Debt – 5.95%(2009); 6.08%(2010) General Plant Allocator – GP1 per settlement Capital Projects – $82.9m  $87.6m Potential Future Facilities Generation Interconnection Network Facilities Other? Basin Electric Costs

FERC Filing – August 1, 2009 (July 31, 2009) Effective Date – October 1, 2009 Compliance Filing – After end of Calendar year 2010, prior to June 1, 2011 Transmission Rate Case Schedule

Estimate Revenue Requirement of $18.23 million Rate Impacts

2009 rate - $2.03 / kW-month Black Hills$ 9.41 m Basin Electric m PRECorp 1.30 m Revenue Credits (0.20) m Total m Usage – 980 MW Rate – $2.03 / kW-Month Rate Impacts

2010 rate - $2.38 / kW-month Black Hills$ 9.41 m Basin Electric m  PRELIMINARY PRECorp 1.30 m Revenue Credits (0.20) m Total m Usage – 1,005 MW  PRELIMINARY Rate – $2.38 / kW-Month Rate Impacts

Discussion / Questions