IE 469 Manufacturing Systems 469 صنع نظم التصنيع I- Performance Measure Tutorial.

Slides:



Advertisements
Similar presentations
Production Planning, Scheduling and Control
Advertisements

Strategic Decisions (Part II)
Module C6 Other EOQ Type Models.
ALTERNATIVES LOT-SIZING SCHEMES
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
Linear Programming Problem
IE 469 Manufacturing Systems 469 صنع نظم التصنيع III- Assembly Line Tutorial.
MD707 Operations Management Professor Joy Field
Ardavan Asef-Vaziri Systems and Operations Management
6 | 1 Copyright © Cengage Learning. All rights reserved. Independent Demand Inventory Materials Management OPS 370.
Chapter 6 Batching & Flow Interruptions Setup Times & EOQ
VALUE STREAM MAPPING Analysis of Material Transport.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Inventory Systems in Practice Or “How I got out of doing the last two questions on the final exam”
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Ch 3 Manufacturing Models and Metrics
IE 368: FACILITY DESIGN AND OPERATIONS MANAGEMENT
Eco 6351 Economics for Managers Chapter 5. Supply Decisions
Based on the book: Managing Business Process Flows.
9/10/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
OPSM 501: Operations Management Week 5: Batching EOQ Koç University Graduate School of Business MBA Program Zeynep Aksin
PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor of Accounting Bryant University © Copyright 2007 Thomson South-Western, a.
Operations Management Aggregate Planning
Production Management Application by Aparna Asha. v Saritha Jinto Antony Kurian.
Throughput Part 2 Effective Capacity & Utilization Based on the book: Managing Business Process Flows.
Operations Management
©2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publically accessible website, in whole or in part.
Opener. Notes: 3.4 Linear Programming Optimization  Many real-life problems involve a process called optimization.  This means finding a maximum or.
File G: Value Stream Cost Analysis Exercise Using Simplified File F Template.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
10/25/2015 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequel.
1 The Dual in Linear Programming In LP the solution for the profit- maximizing combination of outputs automatically determines the input amounts that must.
© 2009 BMA Inc. All rights reserved.  Capacity analysis provides an overview of how effectively you use time in each cell.  The time is categorized.
IE 469 Manufacturing Systems 469 صنع نظم التصنيع II - Modeling Systems Tutorial.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
© BMA Inc All rights reserved. Decision Making.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Toy Airplane Manufacturing
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
LOGO Capstone Design Economical analysis of Decrepit equipment change Team No.1 Presenter 이호정.
Question 1 A.What are the types of flow line analyses? And why breakdown analysis is important? B.A two-week study is performed on a 10-stations transfer.
Supplier Up to Schedule Plan  Supplier receives releases from Lear on a weekly basis via EDI or Fax.  If the supplier does not receive a release on a.
COMPUTER INTAGRATED MANUFACTURING. Production System A collection of people, equipment, and procedures organized to accomplish the manufacturing.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Value Stream Mapping Plus Learning to See Better Know the Laws. Use the Tools. Profit. © Factory Physics, Inc.
Ch 3 Manufacturing Models and Metrics
Operations Research Lecture 11.
Analytical Tools for Process Analysis and Improvement
Operations an exploration of basic manufacturing operations, forecasting, budgeting and control.
Inventory Control: Part 1- Fundamentals
Operations Management
Analysis and Design of Asynchronous Transfer Lines as a series of G/G/m queues: Overview and Examples.
M6205 SYSTEM SIMULATION AND MODELLING TERM PROJECT
Kanban Production Just in time Systems
An Engineering Management Special Free Bonus*
Operations Management
IE 469 Manufacturing Systems
Process and Capacity Analysis Capacity Analysis Tutorial
IV-2 Manufacturing Systems modeling
Capacity Planning.
Unit Time 8/24/04 Paul A. Jensen
Dr Sh Salleh bin Sh Ahmad
Example Exercise 27-1 Reducing Lead Time
Chapter 2 – Manufacturing Operations
IE 214: Operations Management
2nd 9 Weeks MidPoint Review
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Manufacturing Operations
Simulation Supplement B
Inventory Fundamentals
Presentation transcript:

IE 469 Manufacturing Systems 469 صنع نظم التصنيع I- Performance Measure Tutorial

2 Performance Measure Equations: MLT =no*[Tsu+((Q/1-ρ)xTo)+Tno], hr/order N x MLT, hr/month Production time (Tp) =[Tsu+QxTo]/Q, hr/pc Production rate (Rp) = 1/TP, pc/hr Available Time (AT) =PlantOperationTime*Weeks*(MTBF-MTTR)/MTBF Production Capacity (PC) =(N/noa)xAT*Rpa, Parts Demand parts (D) = Ʃ (N*Q) Utilization (U) =D/PC WIP =U xPC x MLT/AT = (D/AT) x MLT, pc/month Part Cost (Cp) =Cm + no*(Co x To + Cno), SR/part Holding Cost (Hc) =[Cm + (no*(Co x To +Cno))/2] x H x (MLT/AT*),SR/part Equations for Averaging`

Problem #1 Question 1 A plant contains 24 machines and produces two products according to the data given in table (1). Machine and labor cost= 80 SR/hr, raw material cost 300 SR/part, and holding cost rate = 35%/year. A) Determine: a. MLT for each product type. b. The plant capacity. c. The utilization. d. The average WIP for each product type. e. Products cost f. Holding cost B) Comment on your finding of utilization and analyze to improve the system

Product typeP1P2 Using Averaging Equations Number of order per month, N Average quantity per order, units, Q Average Number of processes, no Average operating time, To, min Non operation time per order, Tno, hr Setup time per order,Tsu, hr Average mean time to failure, MTTF, hr240 Average mean time to repair, MTTR, hr10 Plant Operation time8 hr / day, 6 days / week Problem #1 Table (1):

Solution: A) P1P2Average Problem #1 Solution Plant Capacity:Utilization: Cp =779pc/monthU =153.96% B) Hence, Capacity does not meet required production and over time of 53.96% is required a. MLT = hr/order = N x MLT, hr/month b. Production time Tp = hr/pc c. Production rate Rp = pc/hr d. WIP = pc/month e. Part Cost = SR/part f. Holding Cost = SR/part AT= Plant operation time x Availability =(8 hrs x 6 days x 4 weeks)x((240-10)/240) =184.32hr/month N0. of M/c, N=24Mchines Production required per month, D= 1200pc/month

Problem #2 Question 2 A manufacturing plant contains 15 machines and produces four products according to the data given in table (1). Determine: a) MLT for each product type. b) Average MLT of the plant. c) The plant capacity. Is this capacity meet production? If not suggest a solution. d) The plant utilization. e) WIP for each product type. f) Average WIP for the plant g) Part cost for each product type h) Average holding cost.

TABLE (1) Product typeP1P2P3P4 Number of order per month Average quantity per order, units Number of processes8976 Average operating time, min Non operation time per order, hr5555 Setup time per order, hr3434 Average mean time between failure, hr235 Average mean time to repair, hr15 scrap %3333 Material Cost, SR/part Machine and operation cost, SR. hr50 Holding cost rate, %/year35 Plant Operation time10 hr / day, 6 days / week Problem #2

Solution: Using Averaging Equations Problem #2 Solution Average batch size Qa=ΣΣQN/ΣN Q*N N Average Number of processes noa=ΣΣnQN/ΣQN n*Q*N Q*N Average operating time Toa=ΣΣT o QNn/ΣQNn To*Q*N*n Q*N*n Average Setup time Tsua=ΣΣnNTs/ΣnN n*N*Ts n*N Average non-operation time Tnoa= Σ ΣnNTno/ΣnN n*N*Tno n*N

Problem #2 Solution a) MLT MLT =, hr/batch = N x MLT, hr/month = P P P P b) Average MLT MLT = hr/batch = = N x MLT, hr/month = Available time, AT = 10x6x4x(220/235) = Production Rate of parts:P1P2P3P4 TP = hr/pc = Average Production Rate: TP = hr/pc =0.220 Rp = 1/TP, pc/hr =4.546 c) Plant Capacity PC = parts/month =2058 d) Utilization: Demand (D) = 2700 parts/month U = D/PC =1.31 Then the capacity is fully utilized and overtime is required or designing new system to meet the requirements, since Utilization is greater than 1

h) Average Holding cost Hc = [Cm + (no*(Co x To +Cno))/2] x ((H/100)/12) x MLT/AT, SR/month Problem #2 Solution e) Work in Process for each product: P1P2P3P4 WIP= f) Average Work in Process in plant: WIP= 1510 Parts/month Part cost/product:P1P2P3P4 Cp = SR/part = ΣΣNQCm/ΣNQ Average material cost (Cm) = N*Q*Cm N*Q g) Average Part cost Cp = SR/part = 186

Question 3 A plant having 18 machines produces a part being processed through six machines in batch of 30 parts. 20 batches of parts are launched each week. Average operation time = 30 min., average setup time per machine = 5hr, non-operation time per machine = 12 hr, and scrap rate =3% as mentioned in table 1. Machine and labor cost= 80 SR/hr, raw material cost 300 SR/part, holding cost rate= 35%/year. Determine: a) MLT, WIP, holding cost and part cost b) If the machines are replaced by CNC machines on which operation time = 15 min., setup time per machine =8hr, and non-productive time per machine =8hr, and scrap rate= 1%. Machine and operation cost = 150 SR/hr and material cost is the same. What are the number of CNC machines. Then determine MLT, WIP, holding cost and part cost. Problem #3

Product typeM/CsCNC* Number of batch per week,N20 Average quantity per batch, units,Q30 Number of processes,n66 Average operating time, min,To3015 Non operation time per bach, hr,Tno128 Setup time per batch, hr,Tsu58 scrap %31 Material Cost, SR/part300 Machine and operation cost, SR.hr Plant Operation time; 8 hr / day, 5 days / week * all operations on are carried out a CNC machine with the same setup Problem #3

Problem #3 Solution Solution: a) For conventional machine: 1- Manufacturing Lead Time: MLT = hr/batch = = N x MLT, hr/week = Production Rate: TP = hr/pc =0.682 Rp = 1/TP, pc/hr = Capacity: PC = parts/week = Utilization: Then the capacity is fully utilized and overtime is required or designing new system to meet the requirements, since Utilization is greater than 1 required parts/week, D = 600 plant to be utilized, D/PC = Work in Process:P/batchP/week WIP= Part cost: Cp Cp =SR/part = Holding cost Hc = SR/part =

b) For CNC machine Each machine carry the six operation combined \To =∑ operation time of all operations & no = 1 Problem #3 Solution 1- Manufacturing Lead Time: MLT= no x [Tsu+(Q/(1- p))*n*To+Tno], hr/batch = = N x MLT1, hr/week = Production Rate: TP =[Tsu+(Q/(1-p)*n*To]/Q, hr/pc =1.782 Rp = 1/TP, pc/hr =0.561 Find Number Of CNC M/cs Alternative 1; Determine the number at demand D=(600) a week N = D/(RP*AT) =600/(40*RP)27 Alternative 2; Determine the number at current capacity D=(234) a week N = D/(RP*AT) =175/(40*RP)8 For first alternative; n=27 3- Capacity: PC = parts/week = Utilization: required parts/week, D = 600 plant to be utilized, D/PC =0.99 Then the capacity is used 99% 5- Work in Process: P/batc hP/week WIP=

For second alternative; n=8 3- Capacity: PC = parts/week =179 Problem #3 Solution 4- Utilization: required parts/week, D = 600 plant to be utilized, D/PC =3.35 Capacity does not meet required production and over time of 235% is required 5- Work in Process:P/batchP/week WIP= Part cost: Cp Cp = SR/part = Holding cost Hc = SR/part =85.312