12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures.

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

Configuration Management
Employee Self-Service (ESS). Agenda Introduction 1 Terminology 2 Employee Self-Service Components 3 More Information 4 Questions & Answers 5.
Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
We have developed CV easy management (CVem) a fast and effective fully automated software solution for effective and rapid management of all personnel.
Documentation and Document Control
Configuration Management
© NHS Institute for Innovation and Improvement, 2012 Baseline Data Collection Guide for Project Managers and Facilitators updated Feb 2012.
Student Introduction to RXpreceptor
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
October, 2004 Electronic Financial Reporting To navigate this slide show, use your “Page Up” or “Page Down” keys.
This tutorial will take approximately 15 minutes. Click here to advance. Click here to go back.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Examine Quality Assurance/Quality Control Documentation
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Ground Control™ Document Control and Training Manager
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Processes and Procedures. Topics Youth PQA Plus ® –Changes Trainer, Advisor and Youth Requirements Training Materials
Automated Contract Administration Project PIP Level II Presentation by Lisa A. Bowden August 24, 1999.
Unit Introduction and Overview
Welcome to the Southeastern Louisiana University’s Online Employment Site Applicant Tutorial!
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
Copyright © 2014 Oracle and/or its affiliates. All rights reserved. | Project Management Plan Presenter’s Name Presenter’s Title Organization, Division.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Configuration Management (managing change). Starter Questions... Which is more important?  stability  progress Why is change potentially dangerous?
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Topic 5 Initiating a project
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
Configuration Management at CMM Level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
Module 12 - part 1Slide 1 of 15 WHO - EDM Basic Principles of GMP Documentation Part 1 Part One, 14.
PMO Advisors, LLC PMO Advisor © Release 2.1. The PMO Advisor Portal The PMO Advisor is a gateway to Project Management tools. This portal has two primary.
11/23/2004Module # 11 The NCSX Project Web An Indoctrination and Overview.
How the NCSX Project Does Business
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
Quality Assurance at CMM Level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements.
Project management Topic 8 Configuration Management.
Legal Module Release Date: June 27, Legal Module Introduction  Enhance existing functionality to streamline the Legal module  Legal Record  Legal.
NCSX Document and Records Plan Peer Review Bob Simmons March 14, 2003.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
WHO - PSM Basic Principles of GMP Documentation - Part 1 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Fall 2010 Software Planning Guidelines.
10.2 Manage Communications
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Software Configuration Management
Module 6 Corrective Action Request (CAR) Overview
Document Plan & Milestones WP7
ISA 201 Intermediate Information Systems Acquisition
Module 8 Introduction to Validation
Configuration Management (managing change)
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Employee Performance Management System
Electronic submission of reappointment applications in Vibe
Practice with Screening & Getting started with the Environmental Procedures Training Manual (EPTM) [SPEAKERS NAMES] [DATE]
Presentation transcript:

12/2/2004Module 2A1 The NCSX Engineering Web – An Overview Part I Work Planning, Project Files, Management Plans and Procedures

12/2/2004Module 2A2 Purpose Provides overview indoctrination of several parts of the NCSX Engineering Web This module will focus on the first three parts of the NCSX Engineering Web Work Planning & Project Control Project Files Management Plans & Procedures Parts II-IV will provide overview indoctrination of the other parts of the NCSX Engineering Web Part II (Module 2B) - Specs, Design Criteria, & Statements of Work and Design Reviews, Analyses, and R&D Part III (Module 2C) – Design Data and Fabrication, Assembly, and Installation & Test Plans Part IV (Module 2D) – Engineering Management & Systems Engineering and Other Later modules to go into much further depth on how the NCSX Project will do business The NCSX Engineering Web is, to a major extent, the electronic NCSX filing system Exceptions are the models and drawings contained in the Pro/INTERALINK data base and the hard copy supplier and other PPPL documents stored in the PPPL Operations Center However – bulk of files stored electronically on this web

12/2/2004Module 2A3 Work Planning & Project Control Information Links Monthly Cost Performance Reports Work Plans (WPs) Jobs (WAFs) WP-WAF Map Cost & Schedule Baselines Cost & Schedule Basis Guidance Links Project Control System (PCS) Primer

12/2/2004Module 2A4 Cost Performance Reports Updated Monthly CPRs Job Status Barcharts Milestone Charts PPPL Job Cost Reports ORNL Job Cost Reports CPI/SPI Plots Performance Curves

12/2/2004Module 2A5 Work Planning (WP) Forms The NCSX Project follows the processes defined in PPPL Engineering Procedure ENG-032, Work Planning Procedure This section of the Web Page contains three links: WPs – direct link to the PPPL Work Planning System PPPL Web Authorization (use username and password) Once Authorized, the link will take you to the PPPL Work Planning System Jobs (WAFs) – latest versions of the NCSX WAFs Merely a link back to the Cost Performance Report web page NCSX WP to WAF Mapping Essential to ensure that every WAF is covered by a WP

12/2/2004Module 2A6 PPPL Work Planning System WP Number Activity Description Project Cog Engineer RLM Status Date Last Modified

12/2/2004Module 2A7 Jobs (WAFs) Cost Performance Report Page provides most recent Jobs (WAFs) This page merely provides link back to the CPR page

12/2/2004Module 2A8 WP:WAF Map Provides direct linking of WP to WAF WP & Name of Work Activity Cog Engineer and RLM WP Status WP Risk Level Job/WAF # Job Title Job Manager/WBS Manager/Project Engineer/RLM Comments & Action Items

12/2/2004Module 2A9 Cost and Schedule Baselines Provides links to Cost and Schedule Baselines Links to appropriate baseline Configuration Management Web Page has greater detail

12/2/2004Module 2A10 Cost and Schedule Basis Provides Detailed Cost and Schedule Basis Details for CD-2 Baseline This information is password protected

12/2/2004Module 2A11 Information Link to the PCS Primer Guidance Document Overview of PPPL & NCSX PCS System

12/2/2004Module 2A12 Project Control Information Memos and Meeting Records Memos organized by project personnel who authored memo Meeting records organized by date

12/2/2004Module 2A13 Project Files Memos Organized by Project Personnel Links to Meeting Minutes and Presentations Organized by date

12/2/2004Module 2A14 Management Plans & Procedures Management Plans and Procedures Information Links NCSX Procedures NCSX Plans PPPL Procedures NCSX:PPPL Procedure Matrix - Intended to provide a linkage showing how NCSX procedures augment existing PPPL procedures => currently under construction Guidance Links Document Reviews Style Instructions Sample Document

12/2/2004Module 2A15 NCSX Procedures Link to Approved NCSX Procedure Drafts/Revisions in Process

12/2/2004Module 2A16 NCSX Plans Approved NCSX Plans Drafts/Revisions in Process

12/2/2004Module 2A17 PPPL Procedures Link

12/2/2004Module 2A18 Information Link to Document Reviews Includes: CHITs Review Report Review Close-Out Report

12/2/2004Module 2A19 Information Link to Guidance Documents Style Instructions Sample Document

12/2/2004Module 2A20 Summary This introduction to the NCSX Engineering Web module has covered several parts of the NCSX Engineering Web Work Planning & Project Control Project Files Management Plans & Procedures Other introductory modules will cover the remaining parts of the NCSX Engineering Web Module 2B – Specs, Design Criteria, Statements of Work, Design Reviews, Analyses, and R&D Module 2C - Design Data and Fabrication, Assembly, and Installation & Test Plans Module 2D - Engineering Management & Systems Engineering and Other More detailed modules will focus in depth on key aspects of how the NCSX Project will do business