Muon EDR material specification 16/04/20031T.Schneider/LHCb Muon EDR O-ring choice: In the inner part of the Muon system (M2/3 R1/2) we have introduced.

Slides:



Advertisements
Similar presentations
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
Advertisements

EMU Meeting, Houston, Jan , 2002O.Prokofiev 1 EMU CMS Meeting O.Prokofiev Fermilab Summary of the CSC aging tests Copy of slides prepared for EMU.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
Silicon Preshower for the CMS: BARC Participation
NEW DESIGN FOR RF FINGERS C. Garion 5 June, 2012TE-VSC1 Acknowledgements to A. Lacroix and H. Rambeau for materials and help.
Soldering Jumper Wires SPIRIT Strip about ¼” of insulation Apply solder until wire appears soli d “Tin” the wire.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
Steel Mild steel Medium carbon steel High carbon steel or hard steel
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
43.35” (LENGTH OF INNER LIQUID HE RESERVIOR)  CONNECTION CHAMBER: FF 4.75”  FF: FLANGE-TO-FLANGE DISTANCE 10.45” TO 12.45” 6.35” TO 8.35” (JACK -2” TO.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Resistive Strips Preparation - with carbon sputtering -
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Pure Tungsten As a high performance materials, Pure Tungsten has high melting temperature, high density, low vapor pressure, low thermal expansion combined.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
Simulating the Effects of Wire Sag in ATLAS’s Monitored Drift Tubes Ashley Thrall, Vassar College ‘04 Dan Levin, Mentor REU Presentations August 5, 2004.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Resistance of wires – assessed investigation Aim: To find out how the length of a wire affects its resistance. What you need to do: Choose a circuit to.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
PARTS OF THE ATOM. SIZE OF THE ATOM ATOMS RANGE IN SIZES OF 1X TO 5X METERS IN DIAMETER.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
The CNGS Target Station By L.Bruno, S.Péraire, P.Sala SL/BT Targets & Dumps Section.
The HCAL barrel absorber structure
Conductors and Insulators. What is resistance? M easure of how difficult it is for electricity (electrons) to flow.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Sheet Metal: Notes and Descriptions MachinesProceduresTools.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
MUCH - related activity at PNPI A.Khanzadeev, for PNPI team ● R&D on muon chamber for MUCH central part ● Test of the materials for chamber modules ● Preparations.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
24/03/99Report to LHCC Referees Muon Group Status Report Outline: Muon Filter - New Geometry - Support System Optimisation Studies - Pad, Strip and Pad/Strip.
Esbe Rotary Motorized valves The ESBE Rotary Motorized valves (mixing valves and actuators) are used to control heating and cooling in buildings. We offer.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
1 QXF / SQXF heater design update M. Marchevsky (12/03/13)
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
steel sheets for BRAUN TUBES Frame Inner Shield Band.
Resistivity Definition Whiteboards. What determines the resistance of a piece of wire?
Sierra Assembly Technology Inc.
European DHCAL Meeting 13/06/08
CH 5 – Electricity and Magnetism
Project 3: Energy Car Duration: 6 cycles.
FCAL R&D towards a prototype of very compact calorimeter
How to read the strength of a resistor
RESISTANCE.
SuperB SVT Silicon Sensor Requirements
Development of Hard X-ray Detector with GEM
Some proposals on HV circuits realization for segmented straw detector
WLS FIBER-SCINTILLATOR GLUING UPDATE
How to Identify a Bolt.
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
Phase II Collimators : design status
RESISTANCE.
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Muon EDR material specification 16/04/20031T.Schneider/LHCb Muon EDR O-ring choice: In the inner part of the Muon system (M2/3 R1/2) we have introduced an O-Ring to close and seal the chambers. Requirements to the O-ring are: Leak tightness High electrical resistance (in range of TΩ) Radiation hardness Chemical resistance to our environment (combination of CF4/electrical field/radiation) Hardness of ~40 Shore A to optimize sealing and number of screws used.

Muon EDR material specification 16/04/20032T.Schneider/LHCb Muon EDR O-ring choice: A quite extensive research for commercial O-ring material has been made to identify good candidates. First an electrical test of all available material has been done: A quite large number of so called high technology O-ring material did not fulfill the electrical requirements. Due to the admixture of carbon (makes the O-ring softer and black) the required high electrical resistivity was often not reached.

Muon EDR material specification 16/04/20033T.Schneider/LHCb Muon EDR Table of tested O-ring material:

Muon EDR material specification 16/04/20034T.Schneider/LHCb Muon EDR O-ring choice: The choice of “soft” (40 shore A) commercial material corresponding to our requirements is limited somehow to natural rubber (NR) and silicone material (MVQ). Silicone would have the advantage that one can get it as soft as needed but the risk of out-gazing Silicone particles made us choosing natural rubber. Therefore natural rubber has been used for all our proto-types. Preliminary aging tests in Gif have given good results (full chamber) A total dose radiation test in Sanita will be performed soon (only O-ring) An additional aging test in Casaccia is foreseen in June/July 2003 (full chamber)

Muon EDR material specification 16/04/20035T.Schneider/LHCb Muon EDR Wire specification for gold plated tungsten wire: 30μm gold plated tungston wire with a max tolerance of ±2% in diameter Weight per meter wire: 13.55mg Gold coating thickness: 0.3μm Grade of straightness 1: Free hanging distance /wire length=95/100 Spools of Ø95mm For the preproduction wire has been ordered from LUMA

Muon EDR material specification 16/04/20036T.Schneider/LHCb Muon EDR Preliminary test on HV resistors: On 2 sets of 0.25W resistors a spark test has been performed A substantial change of resistor value appears only after many thousands of spark (wire can keep ~1000 sparks?) No resistors were mechanically destroyed For our application (2mm pitch; 2.7KV) we will use 0.4W resistors. (same dimensions as 0.25W) More extensive test will be done as soon we have the 0.4W resistors in hands