Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
Status Update on Mechanical Prototype in Rome November 6,
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Hybrid Integrated Circuit
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
STATUS OF MUV1 SCINTILLATORS Vladimir Rykalin IHEP, Protvino NA62 meeting Mainz University, September 6, 2011.
Status Brussels GANTRY Ê New measurements of pin positions 4 using short pins rather than long ones 4 improved the precision Ë Cross-check of precision.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
Planar distortions for SCT Barrel Modules
Status Brussels GANTRY
Status Brussels GANTRY
Hamburg Bonding Report
US Module Production Quality
Vienna Module Production
CMS Perugia Modules Production Review
Module production in Italy
TEC Module Production Overview
Bari production centre resp. M. de Palma
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TEC module quality overview
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
TEC Ring 2 module prototypes J. Hrubec / Inst. für Hochenergiephysik
Presentation transcript:

Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have experienced problems with the frame thickness 4 dry assembly (no glue) for each frame Ì Stopped production of modules due to hybrid delivery 4 some modules assembled with so-called ‘bad’ hybrids Í Continue with ~30 R5S modules for petal integration J.D’Hondt (for Brussels Group) CMS week – September 2004 (plots prepared by Bram Meerschaut) J.D’Hondt

Module precision R3 example X Y  X < 30  m  Y < 50  m  < 10 mdeg CMS specifications on sensor positions sensor hybrid (no real problems with hybrid) sensor R6 and R5N illustration

R6 module precision : 57 modules Ê Good precision, sometimes influence is observed due to glue Ë We follow up the shifts and correct for them  only 4% bad modules (will improve !!)  RMS shift ~ 4-11  m and RMS angles ~ 3-5 mdeg Ì ~5 modules have crack in graphite (pin diameter ≈ graphite precision hole diameter)  solved : we ordered pins with a smaller diameter (~3-4  m less) Grade A B Bad 79% 12%9% corrections estimated via dry assemblies corrections estimated via real assemblies Grade B = Grade A + 30%

R5N module precision : 26 modules Ê Similar as for R6 … improvement expected in the future Ë Bad modules are just outside of specifications A B Bad Grade 85% 7.5% Grade B = Grade A + 30%

Hard-ware adaptations for the assembly plates frame level capton level sensor level 900  m 700  m Ê The thickness of the carbon frames isn’t invariant 4 this and the capton level could induce vaccuum problems (if frame is too thick) Ë Thick frames have to be selected via dry assemblies  double time !! Ì Aachen has adapted a R6, R5N and R5S plate … thanks !! 6 we ordered a new stronger (4-5x) vacuum pump 40  m old new

Summary Precision issues : Precision issues : Ê We follow the evolution of the residual shifts… better precision !! R6 and R5N modules : R6 and R5N modules :  We reach good precision (RMS (x,y) ~ 3-5  m, RMS  ~ 2-3 mdeg) with dry assemblies (no frame, no glue) with dry assemblies (no frame, no glue) Ë Slightly worse with frame and glue Ì In the future we think we can reach a level of ~2-4% bad modules Work skedule : ¶ Produce ~30 R5S modules for petal integration (over the next 3-4 weeks) (over the next 3-4 weeks) J.D’Hondt

Overview Brussels Gantry Commitments (ready - close to be ready - not ready) : R6 1 plate / day (+1 back-up)3 modules / day~1100 total R5N1 plate / day (+1 back-up)3 modules / day~800 total R5S1 plate / day (+1 back-up)3 modules / day~800 total R31 plate / day4 modules / day~700 total Work skedule : À 2 FTE within Gantry skedule ( 4 plates per day ) Á Skedule includes :  all tests of hybrids (ARC & optical)  assembly of modules (including DB operations)  all shipments issues Main residual issue : 6 follow the evolution of the precision on a day-by-day basis J.D’Hondt ~next week ready for production