NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Stellarator magnets L. Bromberg J.H. Schultz MIT Plasma Science and Fusion Center ARIES meeting March 8-9, 2004.
First Article Inspection
NCSX NCSX Planar Coil "ASIPP" Presentation 1 December 8-10, 2005 Michael Kalish NCSX TF and PF Coils.
1 Inspection and Testing Approved for Public Release.
1 An Overview of the Request for Proposals for Production of NCSX Modular Coil Winding Forms [RFP F] July 12, 2004 P. Heitzenroeder, F. Malinowski,
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR1 NCSX Prototype Modular Coil Winding form FDR Phil Heitzenroeder PPPL September 30, 2003.
Fermilab requirements and recent FEA Analyses PH-DT Engineering Office, CERN 06/05/2015 Page 1 CERN, May 6th 2015.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
NSTX TF Flag Joint Design Review INTRODUCTION C Neumeyer 8/7/3.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Modular Coil Electrical Joint1 NCSX Peer Review Modular Coil Electrical Joint James Chrzanowski April 24, 2006.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
A Review of NCSX Conventional Coil Insulation Stresses Presented by Leonard Myatt.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
NCSX NCSX PF Coil PDR 12/14/07 1 Len Myatt NCSX PF Coil PDR Joseph Rushinski Michael Kalish Fred Dahlgren.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
1 MC Assembly over the VV FPA Station 3 FDR Review July 17, 2007 T. Brown.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
ITER In-Vessel Coils (IVC) Interim Design Review Thermal Structural FEA of Feeders A Brooks July 27, 2010 July 26-28, 20101ITER_D_353BL2.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX NCSX Trim Coil Peer Review 11/6/07 1 Tom Brown Art Brooks Raki Ramakrishnan Mike Kalish NCSX Trim Coil Peer Review.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
NCSX NCSX Preliminary Design Review1 Conventional Coils and Structure Phil Heitzenroeder, Len Myatt, and Mike Viola for the NCSX Engineering Team.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
How the NCSX Project Does Business
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
1 FPA Stage 2 Peer Review May 12, 2006 T. Brown. 2 FPA Stage 2 Status Summary of Stage 2 activities Review current design status Review schedule details.
A View of NCSX Structural System and Load Path for the Base Support Structure.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
NCSX NCSX TF Coil Conductor FDR 5/17/05 1 Michael Kalish NCSX TF Conductor.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March F.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
NCSX NCSX PF Coil FDR 2/20/08 1 NCSX Poloidal Field Coil Final Design Review R1 James H. Chrzanowski Michael Kalish Bruce Paul Joseph Rushinski Fred Dahlgren.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
LARP Phase II Secondary Collimator RC1
Inspection and Testing
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
PSS verification and validation
Electrical integrity of magnets and coils
Presentation transcript:

NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement

NCSX NCSX TF Coil Procurement 2 February 3, 2006 Outline Modifications Since FDR Specifications / RFQ Chit Resolution

NCSX NCSX TF Coil Procurement 3 February 3, 2006 Changes Since FDR Changes to Wedge Structure –Wedge Structure ECN allows for machining at assembly –New Wedge Weldment Option / Specification added Assembly Drawing Adds detail for outside procurement –Wedge Structure Assembly Details added –Assembly tolerances and inspection criteria –Braze notes and details –Diagnostic Loop Detail Specifications and SOW address Testing and QC –Electrical –Hydrostatic –Flow

NCSX NCSX TF Coil Procurement 4 February 3, 2006 Coil wrapped with glass then VPI process applied while assembly is in fixture Outside of wedge support over wrapped with glass in five locations after VPI Wedge Assembly Technique Defined in FDR FDR defined Wedge Assembly Technique but specification and drawing did not provide assembly tolerances

NCSX NCSX TF Coil Procurement 5 February 3, 2006 Wedge Assembly Technique Detail Added Further detail added to assembly drawing and specification defines requirement PPPL to approve MIT/QC procedures

NCSX NCSX TF Coil Procurement 6 February 3, 2006 Wedge Structure ECN Wedge Structure drawing allows for casting or weldment New Weldment Specification generated Facilitates final machining at assembly level

NCSX NCSX TF Coil Procurement 7 February 3, 2006 Manufacturing Tolerances Defined Tolerances defined for completed assembly to match TF coil alignment requirements.

NCSX NCSX TF Coil Procurement 8 February 3, 2006 Braze Details Added Braze details defined in winding drawing Braze test requirements defined in Specification PPPL to approve MIT/QC procedures

NCSX NCSX TF Coil Procurement 9 February 3, 2006 Diagnostic Loop Wire Details Added SOW states that PPPL will supply wire and Box As defined in FDR wire is on coil ID under last layer of insulation

NCSX NCSX TF Coil Procurement 10 February 3, 2006 Testing Details Added To Specification Flow Test Criteria Hydrostatic Test Electrical Tests with criteria –Verification of Terminal-to-ground Voltage Standoff Each TF coil assembly shall be Megger tested at room temperature (20ºC) to 13.5 kV during acceptance testing to verify compliance with Section This test shall be performed: Prior to ground wrapping the coil at 1kV instead of 13.5kV After Coil VPI but before adhesion of the wedge castings Final test after adhesion of wedge castings For the first article two additional tests are required, one at LN2 temperatures and one more after warming to room temperature

NCSX NCSX TF Coil Procurement 11 February 3, 2006 RFQ, Evaluation Criteria Provide a description of the fixturing or final machining proposed to maintain critical final dimensions of the wedged surface for the Wedge + Coil Assembly. Explain how, based on past experience and/or on measures specifically developed for this effort, the Offeror proposes to maintain winding tolerances and limit the potential for “spring back” in the final coil assembly. Provide a description of how the coils will be packaged and shipped to ensure their safe arrival at PPPL. Provide description of Offeror’s capabilities to perform induction brazing. Provide a description of any proposed development work which may include but is not limited to VPI samples, bending tests, or brazing samples.

NCSX NCSX TF Coil Procurement 12 February 3, 2006 Provide a description of the measures that will be taken to maintain a clean environment in each stage of the fabrication process to ensure that no foreign materials that could contribute to subsequent coil failure are incorporated into the coils. Such measures may include, but are not limited to: provisions for component cleaning and preparation; use of a low grade clean room for coil assembly; use of collection mats at assembly area egress/exit points, etc. RFQ, Evaluation Criteria

NCSX NCSX TF Coil Procurement 13 February 3, 2006 RFQ, Evaluation Criteria Provide a description of the Offeror’s plan to meet PPPL’s electrical testing requirements, and demonstrate that the plan meets the requirements of the Production Specification. Provide a description of the Offeror’s capabilities and procedures for measurement and inspection, and specific steps the Offeror will take to meet winding tolerances. Provide examples of the Offeror’s documentation for inspection and verification of each manufacturing step, including a sample manufacturing/inspection/test (MIT) plan. Provide a description of planned oversight, including an explanation of the means by which independent QC oversight will be maintained and coordinated with the fabrication and assembly efforts.

NCSX NCSX TF Coil Procurement 14 February 3, 2006 FDR Chit Resolution

NCSX NCSX TF Coil Procurement 15 February 3, 2006 FDR Chit Resolution

NCSX NCSX TF Coil Procurement 16 February 3, 2006 Analysis Check “In general, the coil stresses reviewed in the analysis are moderately low and provide adequate margins over the design allowables for conductor, case, and insulation.” “The analysis check generally validates the conclusions of Myatt Consultings’ primary analysis with the following caveats: –the 0.5 Tesla loading should not be considered a normal operating condition without a validating analysis which defines the maximum allowable out of plane loads –The assumption of infinitely rigid coil supports.. provides only an upper estimate of the structural support reaction forces and a lower bound on the actual coil deflections. A model which includes a more detailed elastic support structure to confirm that the coil stresses, and deflections are within acceptable project limits should be implemented “

NCSX NCSX TF Coil Procurement 17 February 3, 2006 Interfaces ScopeLead ResponsibilityDeliverable Determine differential pressure across the coil, minimum inlet pressure, and flow requirements for Cryogenic System WBS 62Calculation provided to WBS 17 defining requirements Provide Voltage standoff requirements vs design standoff of winding pack insulation scheme WBS 4Table summarizing voltage standoff requirements documented at FDR Liquid Nitrogen Connections / Fittings for the Cryo System WBS 16Fittings are documented on drawings. Choice of fittings reviewed with WBS16 Mechanical interfaces with the TF Support structure must be defined including effects of Static and EM loading WBS 15Pro E Model used as input to FEA Analysis, Calculation Memos documented Determine effects of EM loading from other coil systems WBS 132 WBS 14 Calculation memo documents overall effect of EM loads including PF and Modular coils

NCSX NCSX TF Coil Procurement 18 February 3, 2006 Interfaces InterfaceWBSComment Verify that clearances for TF Coil in final position and during TF Coil Assembly. This includes clearance to MCWF, and MC Leads. WBS 12 WBS 18 TF Coil Rotated about global model to show no interferences. Tom Brown produced power point slide to be posted on web to document interference study Determine metrology requirements necessary to maintain required positional tolerances WBS 7Meetings held to review drawings and specifications to determine metrology requirements. Specific Inspection criteria added to the specification to develop the required dimensions to allow for measurement and positioning of coil Diagnostic requirements for sensor loops to be WBS 3Meetings held to review diagnostic loop requirements. Drawings and specifications now include wire installation details

NCSX NCSX TF Coil Procurement 19 February 3, 2006 END

NCSX NCSX TF Coil Procurement 20 February 3, 2006 Wedge Stresses Less Than 50% of Allowables General Primary Membrane (PM < 1.0Sm): –σ(PM) = ~24 MPa (Fig ) < 270 MPa (1.0Sm) Primary Membrane + Bending (PM+PB < 1.5Sm): –σ(PM+ PB) = 172 MPa (Fig ) < 400 MPa (1.5Sm) Local lip shear stress (hand calculation) –76 MPa < 160 MPa Low wedge stresses allow for weldment with minimal inspection criteria