2015.8.26 ICIS2015 in NY Y.HIGURASHI Y. Higurashi (RIKEN Nishina center) 1.Introduction RIKEN RIBF and RIKEN 28GHz SC-ECRIS 2.Emittance measurements 1.4D.

Slides:



Advertisements
Similar presentations
Measurement of transverse emittances with a Solenoid (for GUN-0.1) - Jens Völker – ( )
Advertisements

Frequency tuning, space charge compensation and hollow beam structure
Superconducting Ion Source Development in Berkeley
The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
IR Magnets for SuperKEKB KEK, Norihito Ohuchi 1.IR Magnets (ES, QCS, QC1) 2.Interference between Magnet-Cryostats and Belle 3.Summary SuperB.WS05.Hawaii.
Helical Cooling Channel Simulation with ICOOL and G4BL K. Yonehara Muon collider meeting, Miami Dec. 13, 2004 Slide 1.
HIAT 2009, 9 th June, Venice 1 DESIGN STUDY OF MEDICAL CYCLOTRON SCENT300 Mario Maggiore on behalf of R&D Accelerator team Laboratori Nazionali del Sud.
Ion Beam Cocktail Development and ECR Ion Source Plasma Physics Experiments at JYFL Olli Tarvainen 11th International Conference on Heavy Ion Accelerator.
NON-EQUILIBRIUM HEAVY GASES PLASMA MHD-STABILIZATION IN AXISYMMETRIC MIRROR MAGNETIC TRAP A.V. Sidorov 2, P.A. Bagryansky 1, A.D. Beklemishev 1, I.V. Izotov.
Carbon Injector for FFAG
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
FFAG-ERIT Accelerator (NEDO project) 17/04/07 Kota Okabe (Fukui Univ.) for FFAG-DDS group.
December 2007ESF-Workshop, Athens, Greece University of Jyväskylä, Department of Physics ECR ion source for the highly charged, intensive ion beams H.
Correlation Analysis of Electrostatic Fluctuation between Central and End Cells in GAMMA 10 Y. Miyata, M. Yoshikawa, F. Yaguchi, M. Ichimura, T. Murakami.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
Limitation of the ECRIS performance by kinetic plasma instabilities O. Tarvainen, T. Kalvas, H. Koivisto, J. Komppula, R. Kronholm, J. Laulainen University.
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
2007/2/111 A Report to the Advisory Committee of CNS The Accelerator Group Outline Progress in April – December 2006 Schedule in Jan – March 2008.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
ICIS2015,Aug , 2015, New York, USA Further improvement of RIKEN 28GHz SC-ECRIS for production of highly charged U ion beam T. Nakagawa (RIKEN, Nishina.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans H. Okuno, et. al. (RIKEN Nishina Center) and P. Ostroumov (ANL) Upgrade Injector Low.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Giovanni Ciavola, JRA-07 ISIBHI JRA-07 Ion Sources for Intense Beams of Heavy Ions (ISIBHI) EURONS PCC Meeting, Groningen, Holland, December 2006.
The Heavy Ion Fusion Virtual National Laboratory Neutralized Transport Experiment (NTX) P. K. Roy, S. S. Yu, S. Eylon, E. Henestroza, A. Anders, F. M.
Paul Scherrer Institut
RF source, volume and caesiated extraction simulations (e-dump)
Direct measurement of the 4 He( 12 C, 16 O)  cross section near stellar energy Kunihiro FUJITA K. Sagara, T. Teranishi, T. Goto, R. Iwabuchi, S. Matsuda,
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
WU2 - Proton Source Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Concept Preliminary Estimations A. Kolomiets Charge to mass ratio1/61/8 Input energy (MeV/u) Output energy (MeV/u)2.5(3.5) Beam.
D. Raparia2005/01/27-28 MAC Review EBIS Injector Linac Optics I I D.Raparia EBIS Review 2005/01/27-28 HEBT Booster Injection.
Cyclone 70 IBA Radiopharma’s high energy, high current cyclotron.
Studies on 2.45 GHz microwave ion sources Abhishek Nag IISER, KOLKATA Presented By: G.O. Rodrigues IUAC, New Delhi Supervised By:
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
Recent progress of RIKEN 28GHz SC-ECRIS for RIBF T. Nakagawa (RIKEN) 1.Introduction RIKEN Radio isotope factory project 2.RIKEN 28GHz SC-ECRIS Structure(Sc-coils,
Korea Atomic Energy Research Institute Byung-Hoon Oh, Sang-Ryul In, Kwang-Won Lee, Chang Seog Seo*, Jung-Tae Jin, Dae-Sik Chang, Seong Ho Jeong, Chul-Kew.
The 12th Symposium on Accelerator Physics, Yuzhong, Gansu, China1 Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT Youjin.
Superconducting Magnet, SCRF and Cryogenics Activities at VECC *, Kolkata Shekhar Mishra Rakesh Bhandari *Department of Atomic Energy, Government of India.
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
Prototyping of Superconducting Magnets for RAON ECR IS S. J. Choi Institute for Basic Science S. J. Choi Institute for Basic Science.
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT
Collimation Concept for Beam Halo Losses in SIS 100
    Abstract ID : Thu-Af-Po4.01
A. Martynov on behalf of accelerator division.
A.Lachaize CNRS/IN2P3 IPN Orsay
DECRIS-PM ion source for DC-280 cyclotron
Standaert Laurent UCL- Cyclotron Resource Centre
Progress in the Multi-Ion Injector Linac Design
Final Focus Synchrotron Radiation
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Beam dynamics of RAON accelerator system
Pulsed Ion Linac for EIC
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Summary & Concluding remarks
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Pulsed Sextupole Injection for Beijing Advanced Photon Source
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

ICIS2015 in NY Y.HIGURASHI Y. Higurashi (RIKEN Nishina center) 1.Introduction RIKEN RIBF and RIKEN 28GHz SC-ECRIS 2.Emittance measurements 1.4D emittance of U D emittance of He D emittance of U 35+ (lower B ext B ext ~1.45T) 3.Conclusion Emittance measurement for RIKEN 28GHz SC-ECRIS

ICIS2015 in NY Y.HIGURASHI 10.8MeV/u10.8MeV/u 50MeV/u 345MeV/u 0.6MeV/u 3.2keV/u He gas stripper Be stripper Efficiency ~15%Efficiency ~30%Efficiency ~4.5% U beam U,Xe beam O, Ca, Kr beam Due to low transmission efficiency ( ~4.5%), we surely need the intense beam production form the ECRIS Construction of the New SC-ECRIS(2009~ ) Due to low transmission efficiency ( ~4.5%), we surely need the intense beam production form the ECRIS Construction of the New SC-ECRIS(2009~ )

ICIS2015 in NY Y.HIGURASHI 345MeV/u 238 U, 124 Xe New injector system ~0.6MeV/u 238 U 35+, 124 Xe 19+ Extraction voltage 22kV m/q >6.8 ( 238 U 35+, 124 Xe 19+ ) Extraction voltage 22kV m/q >6.8 ( 238 U 35+, 124 Xe 19+ )

ICIS2015 in NY Y.HIGURASHI The RIKEN SC-ECRIS can be operated at flexible axial field distributions with six solenoid coils It is possible to change the gradient of the magnetic field strength and the surface size of the ECR zone. The RIKEN 28GHz SC ECRIS produced ~180e  A of U 35+, ~225 e  A of U 33+ with the sputtering method at the injected RF power of ~2.5kW (28GHz+18GHz). T. Nakagawa et al, Rev. Sci. Instrum. 81, 02A320(2010) G.Alton and D. Smithe, Rev. Sci. Instrum. 65, 775(1994 ).

ICIS2015 in NY Y.HIGURASHI Plasma chamber Biased disc U-rod Support rod(water cooled) U 35+ ion beam production with sputtering method About High Temperature Oven will be presented by J. Ohnishi et al ThuPS06

ICIS2015 in NY Y.HIGURASHI Analyzing magnet The beam was analyzed by the analyzing magnet which is same structure as that made in LBL. It has special shaped poles to apply sextupole correction in both the horizontal and vertical plane. The bending radius, vertical gap in the plasma chamber were 51cm and 14cm, respectively. The maximum rigidity was Tm.. M.A. Leitner, et al, Proceedings of the 15th International Workshop on ECR Ion Sources, ECRIS02,

ICIS2015 in NY Y.HIGURASHI LEBT and beam profiling monitor system Emittance slit Figure shows the low energy beam transport (LEBT) line from the ion source to beam profiling monitor system. The extracted beam was focused by the solenoid coil (beam focusing solenoid coil) The beam was analyzed by the analyzing magnet The emittance was measured using the emittance monitor, which consists of two movable thin slits (H-and V-emittance) and scanning wires (beam profile monitor). We also installed the beam slit and Faraday cup in the vacuum chamber of the beam monitoring system.

ICIS2015 in NY Y.HIGURASHI Measurement of 2D and 4D emittance 2D emittance measurement 4D emittance measurement Spectrum ( profiling monitor H-axis)

ICIS2015 in NY Y.HIGURASHI 4D beam matrix and 4D emittance

ICIS2015 in NY Y.HIGURASHI 2D emittance Threshold The four rms emittance H 300  mm*mrad V 162  mm*mrad U μA

ICIS2015 in NY Y.HIGURASHI Beam trajectory in LEBT From the experimental results of the full four-dimensional transverse phase-space distribution of highly charged U ion beam including correlations between the horizontal and vertical planes for the beam axis, we can calculate the 4D emittance on the upstream side of the analyzing magnet, if we calculate the beam trajectory in the analyzing magnet precisely. For calculating the beam trajectory, we used the code OPERA 3D.

ICIS2015 in NY Y.HIGURASHI B ext ~1.75T U μA I drain 4.4mA B ext 1.75T B ext ~1.75T U μA I drain 4.4mA B ext 1.75T Measured position (Downstream) OPERA 3D Upstream (Ion source side)

ICIS2015 in NY Y.HIGURASHI Upstream (Ion source side) Measured position (Downstream) B ext ~1.75T U μA I drain 4.4mA B ext 1.75T B ext ~1.75T U μA I drain 4.4mA B ext 1.75T EM Slit Measurement OPERA calculation HV4DHV  mm mradmm 2 mrad 2  mm mradmm 2 mrad 2

ICIS2015 in NY Y.HIGURASHI He μA I drain 11.1mA B inj 3.11T B min 0.62T B ext 1.79T B r 1.87T He μA I drain 11.1mA B inj 3.11T B min 0.62T B ext 1.79T B r 1.87T Upstream (Ion source side) Measured position (Downstream)

ICIS2015 in NY Y.HIGURASHI Upstream (Ion source side) Measured position (Downstream) He μA I drain 11.1mA B inj 3.11T B min 0.62T B ext 1.79T B r 1.87T He μA I drain 11.1mA B inj 3.11T B min 0.62T B ext 1.79T B r 1.87T EM Slit Measurement OPERA calculation HV4DHV  mm mradmm 2 mrad 2  mm mradmm 2 mrad 2

ICIS2015 in NY Y.HIGURASHI B ext ~1.42T U μA I drain 3.3mA B ext ~1.42T U μA I drain 3.3mA Upstream (Ion source side) Measured position (Downstream)

ICIS2015 in NY Y.HIGURASHI Upstream (Ion source side) Measured position (Downstream) B ext ~1.42T U μA I drain 3.3mA B ext ~1.42T U μA I drain 3.3mA EM Slit Measurement OPERA calculation HV4DHV  mm mradmm 2 mrad 2  mm mradmm 2 mrad 2

ICIS2015 in NY Y.HIGURASHI EM Slit measurement OPERA calculation HV4DHV EM Slit measurement OPERA calculation HV4DHV B ext ~1.75T U μA I drain 4.4mA B ext 1.75T B ext ~1.75T U μA I drain 4.4mA B ext 1.75T B ext ~1.42T U μA I drain 3.3mA B ext ~1.42T U μA I drain 3.3mA

ICIS2015 in NY Y.HIGURASHI Summary We measured the 4D emittance of U 35+ and He 1+ ion beams and calculated the 4D emittance on the upstream side of the analyzing magnet. We observed that the aberration of ion optics strongly affects the emittance for He 1+ ion beam, which is mainly due to the beam size in the analyzing magnet. To compare the 4D emittance with B ext ~1.42T and that with B ext ~1.75T, we obtained the result that the emittance with lower B ext is larger than that with higher B ext, even when we remove the effect of aberration of the ion optics. To clarify this results, we need further investigation.

ICIS2015 in NY Y.HIGURASHI Bext ~1.42 U35+ 40μA EM slit 測定 OPERA で BM を通した後 EM Slit mesurement OPERA calcuration HV4DHV BM 入り口 BM 出 口

ICIS2015 in NY Y.HIGURASHI He+ 2600μA EM slit 測定 OPERA で BM を通した後 EM Slit mesurement OPERA calcuration HV4DHV BM 入り口 BM 出 口

ICIS2015 in NY Y.HIGURASHI Bext ~1.75 U μA EM slit 測定 OPERA で BM を通した後 EM Slit mesurement OPERA calcuration HV4DHV BM 入り口 BM 出 口

ICIS2015 in NY Y.HIGURASHI Intense U beam production with sputtering method ~100e  A U 35+ for long term operation 1. Minimization of the consumption rate we need long term continuous beam production (1~2 montns) for RIBF experiment. To meet this requirement, even if we can install 10gr of metal U, the consumption rate should be lower than ~7 mg/h. 2. Minimization of the emittance To accelerate intense beam of heavy ions (>1p  A) at high energy (>100MeV/u), the emittance should be sufficiently smaller than the acceptance of the accelerator for avoiding the damage by the beam loss in the accelerator. 3. Minimization of the X-ray heat load For SC-ECRIS with small refrigerators (Total cooling power of several W at 4.2K), the beam intensity may be limited by the large amount of X- ray heat load in the cryostat. ~180e  A of U 35+ for short term ~ ~ Increase the beam intensity for RIBF

ICIS2015 in NY Y.HIGURASHI M. Nishida et al, PASJ 2015,FSP003 28GHz SC-ECRIS RILAC RILAC II AVF cyclotron SRC IRC fRC RRC ~345MeV/u