AAE 450 Spring 2008 Danielle Yaple 6 March 2008 Avionics Group, GC, CAD, MAT Final Slides 1.

Slides:



Advertisements
Similar presentations
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Advertisements

AAE 450 Spring Brandon White 3/20/2008 Structures Group Contact Inert Mass Standard Deviation Justification Other Work.
Design Goals Saturn V Ariane 4 Pegasus Vanguard Bellerophon ? ? ?
AAE 450 Spring 2008 Danielle Yaple 24 January 2008 Avionics Group, GC, CAD Batteries and IMU.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE 450 Spring 2008 Dana Lattibeaudiere February 7, 2008 New Code Developments.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE 450 Spring 2008 Kyle Donahue 3/26/2008 Trajectory Analyst, CAD GC Backup slides & Timeline.
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE 450 Spring 2008 Danielle Yaple 7 February 2008 Avionics Group, GC, CAD, MAT Model Analysis Trios Combined Code 1.
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE 450 Spring 2008 Vince Teixeira 28 February 2008 Structures Nose Cone “Sarah”/ Shear Analysis.
AAE450 Spring 2009 Translunar OTV (Orbital Transfer Vehicle) : Chemical Propulsion System Refined estimates: OTV WET Mass, Propellant Volume & Propellant.
AAE 450 Spring 2008 Justin M. Rhodes Avionics – Telecommunications Analysis Code Integration and Automation Webmaster Sample Design and Failure.
AAE 450 Spring 2008 Nicole Bryan 1/31/2008 Avionics Sensor Selection and Link Budget Analysis.
AAE 450 Spring 2008 Allen Guzik January 31, 2008 Trajectory Airplane Launch Trajectory Code and ΔV Drag Comparison Trajectory Optimization 1/5.
AAE 450 Spring 2008 Justin M. Rhodes Avionics – Telecommunications Webmaster Telecommunications and Wiring.
AAE 450 Spring 2008 Steven Izzo 2/7/2008 Structures Buckling Analysis Function for Stages with help from Brandon White.
AAE 450 Spring 2008 Chris Strauss Aerothermodynamics-Rocket Geometry Scaling Vanguard.
AAE 450 Spring 2008 Ricky Hinton March 27 th, 2008 Propulsion Group Nozzle, Test Facility (back-up slides)
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
Avionics AAE 450 Spring 2008 Project Bellerophon April 17, 2008 Avionics.
AAE 450 Spring 2008 Nicole Bryan Avionics Final Presentation Slides 1.
1 AAE 450 Spring 2008 Stephen Bluestone March 20, 2008 Propulsion Final Presentation Slides 1.
AAE 450 Spring 2008 Stephanie Morris 3/27/08 Propulsion Final Slides.
AAE 450 Spring 2008 Nicole Wilcox March 20 th, 2008 Propulsion Engine Performance Characteristics Breakdown Propellant and Pressurant Final Slides Propulsion.
1 AAE 450 Spring 2008 David Childers February 7, 2008 Interface Structures (skirts) Center of Mass Code Structures Cost Code.
AAE 450 Spring 2008 Jesii Doyle 1/31/2008 Internal Structure, Mounting Materials Bulkhead Weight and Cost.
AAE 450 Spring 2008 William Yeong Liang Ling 1/31/2008 Propulsion Cost Model of Balloon and Aircraft Assisted Launch Credit to Stephanie Morris, Jerald.
AAE450 Spring 2009 Support structure for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
1 AAE 450 Spring 2008 Steven Izzo March 27, 2008 Structures Tank Buckling & Final Stress Considerations.
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
1 AAE 450 Spring 2008 Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site.
Team 5 Vehicle Propulsion QDR 2 Presented By: Maria Mullins James Roesch.
AAE 450 Spring 2008 Nicole Bryan 2/14/2008 Avionics, MAT Team MAT Results Ref: Danielle Yaple, MAT Code-writers 1.
AAE 450 Spring 2008 Ricky Hinton February 6 th, 2008 Propulsion Group Solid Propellant Research and Optimum Expansion Ratio Code Additional help from:
AAE 450 Spring 2008 Propulsion Back-Up Slides Propulsion.
AAE 450 Spring 2008 Steven (“CJ”) Hiu 03/27/2008 “Thank You For The Memories” MAT & FAM Coder – Structures Composite Tanks Analysis CAD – Tanks, Intertank.
AAE 450 Spring 2008 Danielle Yaple 6 March 2008 Avionics Group, GC, CAD, MAT Costs 1.
AAE 450 Spring 2008 Stephanie Morris 3/6/08 Propulsion Final Propellant and Pressurant Cost Thanks to Nicole Wilcox!
Project Bellerophon0 Backup Slides. Project Bellerophon1 Trajectory - Steering Law Function of time Defines the orientation of the launch vehicle bb
1AAE 450 Spring 2008 Scott Breitengross Mar 27, 2008 Trajectory group, Delta V, Saturn V, Feasability Determination, 1 kg Final Design Final Presentation.
AAE 450 Spring 2008 Molly Kane March 20, 2008 Structures Group Inert Masses, Dimensions, Buckling Analysis, Skirt Analysis, Materials Selection.
AAE450 Spring 2009 Power Systems for Lander Adham Fakhry [Adham Fakhry] [Power]
AAE 450 Spring 2008 Elizabeth Harkness Trajectory Design Group Contact Preliminary Trajectory Model: Vertical Launch.
AAE 450 Spring 2008 William Yeong Liang Ling 2/14/2008 Propulsion The effect and trends of launch type on launch costs (Model Analysis) Credit to all code.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
AAE450 Spring 2009 Lander Sizing and Launch Vibrations Feb. 12, 2009 Earth Launch/Lunar Descent Phase Group 1 [Ryan Nelson] [STRC]
Steven (“CJ”) Hiu 02/20/2008 Congratulations MAT Coders
Dana Lattibeaudiere March 27, 2008 Propulsion Code Outputs (Thanks Stephen Bluestone, John Beasley, Nicole Wilcox) Mass Deviations – Solids Project Logo.
Nicole Bryan 1/31/2008 Avionics Sensor Selection and Link Budget Analysis AAE 450 Spring 2008.
Nicole Bryan 1/31/2008 Avionics Sensor Selection and Linkbudget Analysis AAE 450 Spring 2008.
Steven Hiu (“CJ”) 02/07/2008 Structural Analysis Model Analysis Team Function Code Structural Sizing & Optimization AAE 450 Spring 2008.
Steven Izzo January 24, 2008 Structures Tank/Engine Mounting
Nicole Wilcox January 31, 2008 Propulsion – Optimization Cost Code Masses and Costs of Propellants AAE 450 Spring 2008.
Nicole Bryan Avionics Final Presentation Slides
Sarah Shoemaker 1/31/2008 Structures Group Internal Structures, CAD
Stephen Bluestone January 31, 2008 Propulsion – Propellants Initial Rocket Sizing Research help from: Dana Lattibeaudiere and Nicole Wilcox AAE 450 Spring.
Sarah Shoemaker Structures Group Internal Structures, CAD
Brandon White 3/20/2008 Structures Group Contact Inert Mass Standard Deviation Justification Other Work AAE 450 Spring 2008.
Nicole Bryan Jan. 17th, 2008 Avionics Introductions
John Beasley 3/20/2008 Propulsion Group Contact: Black Boxes and Code Flowchart AAE 450 Spring 2008.
Timothy Lorenzana 20 March 2008 Avionics Range Safety / Tracking
Timothy Lorenzana 20 March 2008 Avionics Range Safety / Tracking
Brandon White 1/31/2008 Structures Group Contact Interface Loads Inertia Matrices / Structures Code AAE 450 Spring 2008.
David Childers March 6, 2008 Structures Cost Center of Mass
Nicole Wilcox March 20th, 2008 Propulsion Engine Performance Characteristics Breakdown Propellant and Pressurant Final Slides AAE 450 Spring 2008 Propulsion.
Chris Strauss Aerothermodynamics-CFD Faster CFD Method
Stephan Shurn 20 March 2008 Propulsion Final Slides Rail Guns and LITVC AAE 450 Spring 2008.
Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures.
Presentation transcript:

AAE 450 Spring 2008 Danielle Yaple 6 March 2008 Avionics Group, GC, CAD, MAT Final Slides 1

AAE 450 Spring 2008 Final Costs Avionics 2 UnitCosts Wiring – Materials$500 - Installation$7,500 CPU$10,000 IMU$3,300 Sensors$4,000 Battery$10,000 Range Safety$20,000 Ground Tracking$24,000 Telecom$10,000 Installation –telecom$7,500 Total$96,800

Battery Selection LiCFLi SOCl 2 AgZn Watt-Hours/Kilogram Watt-Hours/Liter Discharge Rate LowModerateHigh Failure Tolerance Low High Cell Voltage 2.95V3.1V1.5V Experience Level HighModerateHigh Costs Low AAE 450 Spring 20083

Batteries Estimate Cost: < $10,000 Weight: kg Avionics BatteryWeightWh/kgCost Silver-Zinc (AgZn) kg110~$10,000 Lithium- Monofluoride (Li/CF) kg Lithium/Thionyl Chloride (Li/SoCl 2 ) kg

AAE 450 Spring 2008 Avionics Breakdown Avionics Telecommunications Vehicle Tracking Antennas Data Channels Ground Antennas Data Channels Data Processing Flight Control Data Processing Inputs Sensors Outputs Controls Power Systems Source Supply 5

AAE 450 Spring 2008 MAT Code User Inputs  Delta V (vary case to case, 7000,9000,12000,15000,18000 m/s)  Payload Mass (.2, 1, 5 kg)  Stages (2 or 3)  Propellant Type (Cryogenic, Storable, Hybrid, or Solid)  Tank Material (Steel, Aluminum, Composite, Titanium)  Launch Type (Ground, Balloon,Aircraft) Outputs Model Name, GLOW (kg), Total Cost*, Propellant Costs per Stage, Tank Cost per Stage, Inert Mass Fractions per Stage and Stage Lengths 4 min Run Time Avionics 6

Model Name Launch TypeGLOW (kg)Total CostStage 1 MFStage 2 MFStage 3 MFTotal Length SA-SA-DT-DTAircraft SB-SA-DA-DABalloon SG-SA-DT-DTGround MA-SA-DA-DAAircraft MB-SA-DA-DTBalloon MG-SA-DA-DTGround LA-SA-DA-DTAircraft LB-SA-DA-DABalloon LG-SA-DA-DTGround AAE 450 Spring 20087

Model Name Launch TypeGLOW (kg)Total CostStage 1 IMFStage 2 IMFStage 3 IMF Length Total (m) SB-HS-ST-DABalloon SB-HS-ST-DTBalloon SG-DA-DS-DSGround MB-HS-ST-DABalloon MB-HS-ST-DTBalloon MB-HS-SS-DABalloon LG-HA-DA-DAGround LG-DA-DA-DAGround LG-DS-DS-DAGround AAE 450 Spring 2008 Avionica 8