LEADER meeting WP2 – Task 2.5 DPA, dose and activation calculations D. Gugiu (INR) – C. Petrovich (ENEA) Karlsruhe, November 21 st 2012.

Slides:



Advertisements
Similar presentations
R. NABBI, P. BOURAUEL, G. DAMM
Advertisements

HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
INRNE-BAS MELCOR Pre -Test Calculation of Boil-off test at Quench facility 11th International QUENCH Workshop Forschungszentrum Karlsruhe (FZK), October.
Issues and considerations for fuel cladding materials of LFR reactor P. Agostini, A. Gessi, D. Rozzia, M.Tarantino – ENEA Contributions by participants.
Lesson 17 HEAT GENERATION
Preliminary T/H Analyses for EFIT-MgO/Pb Reactor Design WP1.5 Progress Meeting KTH / Stockholm, May 22-23, 2007 G. Bandini, P. Meloni, M. Polidori Italian.
1 WASTE CHARACTERIZATION METHODS S. Vanderperre Belgatom Vanderperre, Belgatom, chapter 7.
EUROTRANS – DM1 RELAP5 Model Evaluation with SIMMER-III Code and Preliminary Transient Analysis for EFIT Reactor WP5.1 Progress Meeting KTH / Stockholm,
Characterization of the Engineering Test Reactor at the INL for Final Disposition TRTR 2007 J. R. Parry Irradiation Test Programs INL.
M. GIRARD – CEA / EFDA MEETING - CADARACHE, January th, 2005 Task TW4 – TSS - SEA 5.5 Validation of EU Safety Computer codes Validation of PACTITER.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
Views on Neutronics and Activation Issues Facing Liquid-Protected IFE Chambers L. El-Guebaly and the ARIES Team Fusion Technology Institute University.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
University of Cambridge Stéphane Forsik 5 th June 2006 Neural network: A set of four case studies.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
LINEAR SECOND ORDER ORDINARY DIFFERENTIAL EQUATIONS
Metal Suspension and Exemption Planning Sayed Rokni, Jim Allan, James Liu, Olga Ligeti, Amanda Sabourov, Joachim Vollaire ES&H Radiation Protection Department.
Summary of FS Lifetime Assessment and Activation Analysis L. El-Guebaly Fusion Technology Institute University of Wisconsin - Madison ARIES E-Meeting October.
Radiation Dosimetry Dose Calculations D, LET & H can frequently be obtained reliably by calculations: Alpha & low – Energy Beta Emitters Distributed in.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino – ENEA Work Package Meeting – ENEA Bologna, November 17th, 2010.
1 MCNP simulation of salt channel in LR-0 reactor 12th session of the AER Working Group F - "Spent Fuel Transmutations" and 3rd meeting of INPRO Project.
Thermal hydraulic analysis of ALFRED by RELAP5 code & by SIMMER code G. Barone, N. Forgione, A. Pesetti, R. Lo Frano CIRTEN Consorzio Interuniversitario.
“Influence of atomic displacement rate on radiation-induced ageing of power reactor components” Ulyanovsk, 3 -7 October 2005 Displacement rates and primary.
MA and LLFP Transmutation Performance Assessment in the MYRRHA eXperimental ADS P&T: 8th IEM, Las Vegas, Nevada, USA November 9-11, 2004 E. Malambu, W.
Lead Technology Task 6.2 Materials for mechanical pump for HLM reactors M. Tarantino, I. Di Piazza, P. Gaggini Work Package Meeting Karlsruhe, November.
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
Study on recycling of fusion activated materials: Identify activation levels, characteristics and decay time requirements of irradiated material (deliverable.
Chapter 4. Power From Fission 1.Introduction 2.Characteristics of Fission 3. General Features 4. Commercial Reactors 5. Nuclear Reactor Safety 6. Nuclear.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
NEEP 541 – Material Properties Fall 2003 Jake Blanchard.
JAERI nuclear analyses for IFMIF T. Umetsu, M. Yamauchi and M. Sugimoto Presented by Takeo NISHITANI Japan Atomic Energy Agency (JAEA) IAEA Technical Meeting.
Identification of most promising candidate alloys for fuel cladding and core internal structures SCWR Information Meeting - April 29-30, 2003 UW-Madison.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
FAST MOLTEN SALT REACTOR –TRANSMUTER FOR CLOSING NUCLEAR FUEL CYCLE ON MINOR ACTINIDES A.Dudnikov, P.Alekseev, S.Subbotin.
USE OF THE AXIAL BURNUP PROFILE AT THE NUCLEAR SAFETY ANALYSIS OF THE VVER-1000 SPENT FUEL STORAGE FACILITY IN UKRAINE Olena Dudka, Yevgen Bilodid, Iurii.
LEADER Project Analysis of Representative DBC Events of the ETDR with RELAP5 and CATHARE Giacomino Bandini - ENEA/Bologna Genevieve Geffraye – CEA/Grenoble.
ERMSAR 2012, Cologne March 21 – 23, 2012 Analysis of Corium Behavior in the Lower Plenum of the Reactor Vessel during a Severe Accident Rae-Joon Park,
Determination of activity of 51 Cr source on gamma radiation measurements V.V.Gorbachev, V.N.Gavrin, T.V.Ibragimova, A.V.Kalikhov, Yu.M.Malyshkin,A.A.Shikhin.
LEADER Work Package 2 Status of activities Giacomo Grasso on behalf of Carlo Artioli – Work Package 2 leader UTFISSM-PRONOC ENEA LEADER PCC meeting Bologna,
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
Task 2.1: Review of ELSY and Conceptual design & neutronic characterization of the ELFR Industrial Plant Kamil Tuček on behalf of Task 2.1 contributors.
KIT TOWN OFFICE OSTENDORFHAUS Karlsruhe, 21 st November 2012 CIRTEN Consorzio universitario per la ricerca tecnologica nucleare Antonio Cammi, Stefano.
Investigating the Feasibility of a Small Scale Transmuter – Part II Roger Sit NCHPS Meeting March 4-5, 2010.
The analytical techniques most widespread for certification in the iron and steel industry are X-ray Fluorescence Spectrometry (XRF), Arc/Spark Optical.
The Neutronics of Heavy Ion Fusion Chambers Jeff Latkowski and Susana Reyes 15 th Heavy Ion Inertial Fusion Symposium Princeton, NJ June 9, 2004 Work performed.
HTS Tl-based coatings for FCC beam screens - Radiation Protection Aspects - Markus WIDORSKI, DGS-RP Information on ActiWiz: Courtesy of Chris Theis, DGS-RP.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
Neutron production in Pb/U assembly irradiated by 1.26 AGeV deuterons. First experimental results Ondřej Svoboda Neutron production in Pb/U assembly irradiated.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
EUROTRANS – DM1 Preliminary Transient Analysis for EFIT Design WP5.1 Progress Meeting AREVA / Lyon, October 10-11, 2006 G. Bandini, P. Meloni, M. Polidori.
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
COMPARATIVE ANALYSIS OF DIFFERENT METHODS OF MODELING OF MOST LOADED FUEL PIN IN TRANSIENTS Y.Ovdiyenko, V.Khalimonchuk, M. Ieremenko State Scientific.
Investigation of 15kh2NMFAA steel and weld after irradiation in the “Korpus” facility on the RBT-6 reactor D. Kozlov, V. Golovanov, V. Raetsky, G. Shevlyakov,
1 G. Cambi, D.G. Cepraga, M. Frisoni Enea & Bologna University Team OSIRIS neutronic and activation simulation with Scalenea-ANITA in support of PACTITER/CORELE.
Neutron production and iodide transmutation studies using intensive beam of Dubna Phasotron Mitja Majerle Nuclear Physics Institute of CAS Řež, Czech republic.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
Heating and radiological
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
Induced-activity experiment:
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
Preparation of activation experiments for ITER material characterization and data validation in the Deuterium–Tritium JET campaign T. Vasilopoulou &
Jordan University of Science and Technology
Pebble Bed Reactors for Once Trough Nuclear Transmutation
Jeff Latkowski and Wayne Meier
Nuclear Fission and Fusion
IRRADIATION-INDUCED SWELLING OF BOR-60 SMALL ROTATION PLUG STUDS
XI Conference on Reactor Materials May , 2019, Dimitrovgrad
TRANSPORTATION CASK AND CONCRETE MODULE DESIGN FOR MANAGING NUCLEAR SPENT FUEL PRODUCED IN BUSHEHR NUCLEAR POWER PLANT A.M. TAHERIAN Iran Radioactive Waste.
Moscow Engineering Physics Institute Department of Materials Science
Presentation transcript:

LEADER meeting WP2 – Task 2.5 DPA, dose and activation calculations D. Gugiu (INR) – C. Petrovich (ENEA) Karlsruhe, November 21 st 2012

Task 2.5 DPA and radiological protection for LFR and ETDR (INR, ENEA, SCK  CEN)  Evaluations of the DPA on the structural materials and main components, replaceable or not, of both ETDR and LFR systems.  The activation of the main components of both ETDR and LFR (including the Pb) will be also computed in order to evaluate their contributions to the  doses in some key points (personnel radioprotection). The activation estimations will also allow the characterization of the respective components (materials) from the waste management point of view. Objectives:

Technical Document T61 (advanced draft – issue within end of 2012) ETDR core: DPA rates in the main components, activation, doses IndexResponsibleParticipantsDate 1. ScopeINR 2. IntroductionINR 3. Radiation damage evaluation SCK  CEN All 4. Pb activationENEAENEA, INR 5. Pb activation contribution to the  dose INRENEA, INR 6. Activity and  dose contribution of the impurities removed by coolant from the reactor Internals INR 7. Neutron and  dose computations during reactor operation-reference core configuration INR 8. ConclusionsINRAll

Technical Document T65 (under preparation) (January is OK??) LFR cores: DPA rates in the main components, activation, doses IndexResponsibleParticipantsInput Need Date 1. ScopeINR 2. IntroductionINR 3. Radiation damage evaluation INR 4. Pb activationENEAENEA, INR 5. Pb activation contribution to the  dose INR D05; T51; T55 6. Activity and  dose contribution of the impurities removed by coolant from the reactor Internals INR 7. Neutron and  dose computations during reactor operation- reference core configuration INR 8. ConclusionsAll

Configuration and tools All calculations are performed with: – MCNPX (3D detailed model) + JEFF 3.1 – FISPACT (UKAEA, activation calculations) + EASY-2005 – ERANOS (CEA)

Radiation damage evaluations for ALFRED The max, over the reactor life, obtained on the Ti cladding (only Iron) : 85 dpa (criteria is  100 dpa) (ERANOS computations by CEA, reported in D7) 1. DPA in cladding

MCNPX calculations: 60 dpa in the central FA The differences could be due to: -ERANOS takes into account the axial and pin-wise distribution factors, while MCNPX has been used upon averaging on the entire FA -ERANOS used a realistic refuelling scheme, while the MCNPX computations have been performed on a completely fresh core - the value of the damage energy (E d ) used in ERANOS might be different; in some references this value is of 25 eV for iron; for ELSY, ALFRED and previously for XS-ADS a value of 40 eV has been used.

DPA values in the inner vessel (T91) -Divided in segments of 20 cm starting from the inner vessel bottom -After 20 y, DPA>2, starting from cm from the bottom -After 40 y, DPA>2, starting from cm from the bottom

DPA values for the internals Pump casing -The pump casing tube has been divided into segments of 20 cm height starting from its bottom ending located at cm with respect to the active core centre -For the lowest segment (closest to active core ) the DPA after 40 y is considerably under the limit (2 DPA)

Inner shell MCNPX model of SG The DPA start to accumulate from the segment located at -12cm with respect to the core centre and are under the design constraint (2 DPA) even after 40y of irradiation

Cladding Activation (Ti 15-15) Nuclide Activity (Bq) Total1.58E+14 Co E+13 Fe E+13 Co 58m2.64E+13 Mn E+13 Mn E+12 Mo E+12 Cr E+12 Tc 99m3.44E+12 Tc E+12 Mo E+12 Fe E+11 Ta E+11 Tc E+11 Ni E+11 V E+11 Co 60m2.93E+11 Nb 94m2.75E+11 Si E+11 Cu E+11 Cr E+11 Rest1.16E+12 The total activity of 1 kg of Ti after 5y of continuous irradiation in the central FA is very high: 1.6E+14 Bq The FISPACT code provides also information about the contribution of each type of radiation to the total activity:  Bq = 4.4E+07  Bq = 1.3E+14  Bq = 3.0E+13 The  decay is the main contributor and, together with the  decay, should be taken into consideration (from personnel radioprotection point of view) during handling and transportation.

After 100 y of cooling the activity is still high; the clearance index remains enough high due to long-lived isotopes (Ni63, C14, Ar39, etc.) Dominant isotopes:

Cladding Activation (Ti 15-15) Another aspect that could be of interest especially for the nuclear materials field is the behavior of the Ti isotopic composition with irradiation.

It could be observed an increase of the V mass (  17%) after 5y of irradiation (central FA) and of the Co element (20%) Additionally, the Ta mass decreases by  20% and transmutes partially into W, whose mass increases by  3% Even if these elements are in small amounts in the initial composition of Ti 15-15, the variation of their concentration could lead to changes (?) in the crystallographic structure and subsequently to the modification of the mechanical, thermal, etc. properties of the steel.

Impurities (removed by lead from the internals) NOTE: it should be of interest to have detailed information about the corrosion rate of various stainless steel types (maybe from KIT ?) which could allow a better estimate of the quantity and the activity level of the impurities transported by the Pb coolant. Example: IAEA-TECDOC-1289 Results of out-of-pile corrosion tests (ferritic-martensitic 12% Cr steel) conducted within 400–650 C range during 8000 h were extrapolated for h (5 y operation of fuel subassembly) gave ~120 μm and 60 μm reduction of cladding wall thickness at 650 C and 550 C respectively. In the present work (T61): - a layer of 50 μm (in 5y) removed only from the fuel claddings (133 cm length) has been considered ( cm 3 ) - a thin layer of impurities (resulted from their volume conservation) has been considered at the lead free surface -the most intense  source (after 5 y irradiation of Ti ) has been considered for this layer. The  dose values obtained show that the impurities carried by Pb could provide a substantial dose. As a result, a more detailed information about the erosion/corrosion rate is needed (μm/y). (also which cooling time to be considered? Shielding ?)

LEAD ACTIVATION the Pb coolant activation analysis is performed for C00 lead brand analysed in BREST reactor (purity level of %) AgCuZnBiAsSnSbMg % wt FeTlCaNaCdAlHgIn % wt  Assumption that Pb is irradiated during the reactor life in the average neutron flux–spectrum evaluated in the entire Pb volume (same approach as PDS-XADS, EFIT and ELSY). Assumption of homogeneous irradiation (no stagnant zones)  The actual lead volume in the reactor is  320 m 3 approximately (as computed by MCNPX). Therefore:  3400 tons of Pb Intrinsic impurities assumed for calculation (other impurities?):

Average neutron flux-spectrum over the whole lead volume  The value of the tot neutron flux is of 1.4  cm -2 s -1 (assumed to be constant during 40 y). 175 energy groups.  A detailed isotopes inventory is available (in ANNEX of T61), with grams, Bq, Sv (ingestion and inhalation). Isotopes with atoms <10 12 are there neglected.  Using this approach, the total Po produced is ~0.03g (for an initial concentration of Bi impurities of 1.E-4 ); for a Bi impurity level of 0.006%, the amount of Po becomes 0.4g.

Total production of atoms in the whole volume

10 dominant nuclides after 40y (no cooling) – 1 kg of Pb Nuclide Activity (Bq) Nuclide Ingestion (Sv) Nuclide Inhalation (Sv) Total5.21E+10Total3.34E+00Total8.16E+00 Pb207m4.22E+10Po E+00Po E+00 Pb E+09Pb E-01Sb E-01 Pb204m2.75E+08As E-01Pb E-01 As E+08Sb E-01Sb E-01 Sb E+08Sb E-01As E-01 Hg E+08Pb204m6.05E-02Bi E-01 In116m1.16E+08Tl E-02Pb204m6.32E-02 Sb E+08Zn E-02Ag110m3.60E-02 Ag E+07Cd E-02Cd113m3.39E-02 In116n6.28E+07Pb E-02Te123m1.52E-02

CONCLUSIONS DPA limits: -Respected in cladding: <85 dpa (limit of 100) -Respected in SGs: <0.3 dpa (limit of 2) -Not respected in the inner vessel: 4.6 dpa after 40y (limit of 2). Change radius? CLADDING ACTIVATION - Calculations show high activity, some % composition change (negligible?). Erosion rates are needed if dose assessment above the reactor is needed. LEAD ACTIVATION -Results depend on the assumed impurities. Complete list of activation products is available (Po <1 g). Lead will be recycled or is it waste?