Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.

Slides:



Advertisements
Similar presentations
Carbon Regulation and Resource Planning Jim Hill Western Resource Planning Forum June 21, 2010.
Advertisements

ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
WinDS-H2 MODEL Wind Deployment Systems Hydrogen Model Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower Walter Short Nate Blair.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Technical Conference Avoided Cost Modeling January 6, 2015.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
ERCOT PUBLIC 2/14/ LTSA Scenario and Data Assumptions February 14, 2014.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Energy Business Solutions Michigan IRP Working Group Meeting June 10, 2005.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
ENERGY MARKET PERSPECTIVE
ERCOT PUBLIC 6/17/ LTSA Scenario Results June, 2014.
Long Term Study Scenarios and Generation Expansion Update December 7, 2012.
Renewable Energy Project Economics, Policy and Incentives NARUC Staff Subcommittee on Accounting and Finance October 8, 2007 Dr. Lola Infante Manager,
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
1 Status of and Outlook for Coal Supply and Demand in the U.S. Imagine West Virginia Spring 2010 Board of Governors Meeting April 13, 2010 Scott Sitzer.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Investing in America’s Electric Future Morry Markowitz Group Director, External Affairs New Mexico Utility Shareholders Alliance October 7, 2009.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
The Power to Reduce CO 2 Emissions The Full Portfolio National Association of Utility Regulatory Commissioners Winter Committee Meetings Committee on Electricity.
ERCOT PUBLIC 7/14/ Model Data Assumptions Doug Murray ERCOT Sr. Planning Analyst LTSA Scenario Development Workshop July 14, 2015.
Generation Technologies in a Carbon-constrained World Steve Specker President & CEO October 2005.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Long Term Study Transmission Results May 21 st, 2013.
SHP – Columbia University
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Consumer Cost Effectiveness of Carbon Mitigation Policies in Restructured Electricity Market Jared Moore and Jay Apt (adviser) CMU Engineering and Public.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla,
Viability of Carbon Capture and Sequestration Retrofits for Existing Coal- fired Power Plants under an Emission Trading Scheme CEDM Annual Meeting May.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Forecasting Power System Hourly Load and Emissions for Air Quality Modeling ERTAC-EGU Model Development Group – Webinar & Outreach slides Robert.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
LTSA Scenario Development Workshop
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
“Other” Cost Estimates
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Integrated Resource Plan 2016
Use of EDWG Data by the LTPT
Presentation transcript:

Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012

2 Discussion Topics 2012 Model Updates Scenario Review New Technology Information Demand Response Modeling Economic Retirement Process Generation Expansion Process Current Status April, 2012

Model Updates Fuel Forecasts from the Early Release of the Annual Energy Outlook (AEO) for 2012 published by the Energy Information Administration (EIA) –Henry Hub Natural Gas –Powder River Basin Coal Capacity, Demand, and Reserves (CDR) updates from the December 2011 report –Generating unit changes Mothballed units, new I/A units –Units Capacity –Unit winter to summer capacity derations Load Forecast Update –Based on December 2011 CDR report April, 2012

4 Scenarios for Study Three scenarios have been finalized: –Business as Usual (BAU) –Drought –Environmental Business as Usual scenario has a base case and 5 sensitivities Drought has only a base case Environmental has a base case and 2 sensitivities The matrix is in the appendix of this presentation April, 2012

5 Business as Usual Scenario The BAU generation expansion from the Interim Report has been integrated into the transmission analysis that has been completed Demand response is included in sensitivities based on discussions with Demand Side Working Group (DSWG) –Residential/Commercial: 2,200 MW –Industrial: 500 MW Additional sensitivities: –All Tech (additional technologies: Compressed Air Energy Storage (CAES), Gravity Power, Geothermal, Solar) –All Tech with Retirements of Natural Gas units aged 50 years or older –All Tech with PTC (production tax credit is extended) –All Tech with Increased Asynchronous Tie Capacity –All Tech with High Natural Gas Prices and PTC extension April, 2012

6 Extreme Drought Scenario ERCOT is working with Sandia National Labs to develop a scenario that reflects the impact of a prolonged drought Sandia is anticipating having a final list of potential resources at risk by June 2012 Impacts to system load from drought conditions are also being analyzed Assumptions made for scenario: –Extension of PTC –Industrial Demand Response is increased from 500 MW to 3,000 MW –Emission costs are included April, 2012

7 Environmental Scenario Environmental Base Case assumes: –Higher natural gas prices (EIA reference plus $5/MMBtu) –Extension of PTC –Demand Response is increased Residential/commercial up to 4,400 MW Industrial up to 3,000 MW –Emission costs are included Sensitivities to the Environmental Base Case: –Base Case with Renewable Portfolio Standard (RPS) 25% of energy by 2025 from renewables Retirement of all coal units without Carbon Capture and Sequestration (CCS) technology –Base Case with Demand Response (DR) and Energy Efficiency (EE) Mandates 10,000 MW DR Mandate 15% of energy by 2025 from EE April, 2012

8 Additional Resources Considered in Modeling April, 2012 Operating characteristics of additional resources and new technologies ResourceWartsila 18.7 MW CAESGravity PowerWindLarge Solar PVGeothermal Capital Cost ($/kW in 2011$) $900 (vendor)$1,000 (vendor) $2,000 (EERE)$3,270 (2007$) (Austin Energy IRP Assumptions) $1,800 PTC EligibleNo YesNoYes Max Capacity (MW) Min Capacity (% of Max)3.30%10%0% 40% Heat Rate (btu/kWh)8,0004,500N/A Variable O&M ($/MWh in 2011$) $6.00$4.00$0 $10 Fixed O&M ($/kW-year in 2011$) $5.00$20.00$13.03$28.07$6.02 (2007$) $84.27 OperationsQuickstartOutput for 12 hours and refill for 12 hours on a daily basis 4 hours of operation and then 5 hours to refill Intermittent Baseload (5 minute to full load) Water UsageMinimal900 gallons per minute26 million gallons for initial fill None Minimal

9 Residential Demand Response Characteristics Modeled as an interruptible resource in PROMOD. Established a strike price for dispatch. Starting strike price is $1,032/MWh based on a pro-forma analysis using characteristics provided by stakeholders at Demand Side Work Group (DSWG) If current strike price yields operation of more than 100 hours, the strike price was adjusted such that operation was less than or equal to 100 hours. –100 hours was chosen based on discussion with stakeholders at DSWG If those hours of operation yielded revenues such that it was economic, then the DR was assumed to be built in that year. If DR was economic in any given year, it was assumed to remain in service no matter what future revenues it received. –Assumption that a DR asset would not be retired April, 2012

10 Industrial DR Analysis 15-min settlement data for Transmission Voltage and Primary Voltage levels (1,242 ESI IDs) –Primary Voltage level was taken for all ESI IDs above 1 MW Settlement Point Prices for respective load zones Determined the average load for each ESI ID Subtracted each interval from average to determine potential load reduction –Intervals used were occurrences above $500/MWh –Transmission Voltage level load reduction: 187 MW –Primary Voltage level load reduction: 353 MW Determined an Industrial DR capacity of 500 MW with a strike price of $500/MWh April, 2012

11 Economic Retirement Process Age, efficiency, profit margins and cost of retrofits are considered Each category was broken into different groups and each group was given a value from 1-6 depending on number of groups –Age: 40 yrs (5) –Efficiency: 12 MMBtu (6) –Profit margins: >25% (1), 10-25% (2), 0-10% (3), -10-0% (4), -10- (-25)% (5), <- 25% (6) –Retrofit: no retrofits were required in the BAU scenario (to be determined for scenarios with environmental regulations) PROMOD results were used to determine profit margin values Each unit was given a total score (sum of values for each category) –∑ = A (Wa) + E (We) + P (Wp) + R (Wr) Retirement decision: if the unit’s total score was higher than 1 standard deviation above the mean of the sum of all units scores April, 2012

12 Flowchart of Generation Expansion Process April, 2012 Run PROMOD Run Market Power Export Market Power Expansion Units to PROMOD Repeat Process Every 3 Years Yes No Add / Subtract Additional Resource Finalize Generation Expansion Plan Meets Criteria Expansion Meets Criteria Yes No Iterate Initial PM Retirement Run Re-evaluate Retirements Retire Units If Any Re-evaluate Expansion Plan

13 Current Status Preliminary results are complete for BAU with All Tech and the BAU With All Tech plus retirements of NG units > 50 yrs old Results of the BAU with All Tech look very similar to the BAU with Wind so the expected transmission build out will also look similar –Advanced Combined Cycles and Advanced Combustion Turbines Initial results of BAU With All Tech with Retirements of Natural Gas units aged 50 years or older are undergoing further review April, 2012

14 QUESTIONS / COMMENTS??? April, 2012

15 APPENDIX April, 2012

16 Scenario Matrix April, 2012